ML17056A877

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-220/90-15 on 900403-06.No Violations Noted.Reg Guide 1.97 & Electrical Restart Issues Identified in Insp Repts 50-220/89-12 & 50-220/89-23 & Corrective Actions Taken,Examined.Restart Issues Closed Due to Insp
ML17056A877
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/01/1990
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056A878 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 9006130016
Download: ML17056A877 (4)


See also: IR 05000220/1990015

Text

SUN

0 1

1S90

Docket Nos.

50-220

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President

Nuclear Operations

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

Inspection

No. 50-220/90-15

This letter refers to the inspection

conducted

by Mr. Leonard

Cheung of this

office on April 3-6,

1990 at your Corporate Office at Salina

Meadows,

Syracuse,

New York.

Mr. Cheung discussed

the findings of the inspection. with

Mr. J.

Benson

and other members of your staff at the conclusion of the

inspection.

The areas

examined during this inspection

were Unit 1, Regulatory Guide 1.97

and electrical restart

issues

identified in previous Inspections

50-220/89-12

and 50-220/89-23,

and the corrective actions

taken

by your staff.

As

a result

of this inspection, all of these restart

issues

were closed.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincerely,

Or1t;Anal Slane~

"'~'.

K, E:yen

Jacque

P. Durr, Chief

Engineering

Branch

Division of Reactor Safety

Enclosure:

NRC Region I Inspection

Report

Number 50-220/90-15

OFFICIAL RECORD

COPY

+C>06130Cr T/~ 900t~o j

r l""4

ADCiCr; 0!$OQC)~~A

0

r".Xi .

IR NM1 90-15 - 0001.0.0

05/30/90

Niagara

Mohawk Power Corporation

JUN 01 lggP

cc w/encl:

C. Mangan,

Senior Vice President

W. Hansen,

Manager,

Corporate Quality Assurance

M. Colomb, Unit 2 Superintendent,

Operations

C.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R. Abbott, Unit 2 Station Superintendent

J. Perry,

Vice President,

Quality Assurance

K. Dahlberg,

Unit

1 Station Superintendent

R. Randall, Unit

1 Superintendent,

Operations

J . Willis, General

Station Superintendent

C. Terry, Vice President

Nuclear Engineering

and Licensing

J.

Warden,

New York Consumer Protection

Branch

T. Conner, Jr.,

Esquire

G. Wilson, Senior Attorney

J. Keib, Esquire

Director,

Power Division, Department of Public Service,

State of New York

State of New York, Department of Law

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York,

SLO Designee

bcc w/encl:

Region I Docket

Room (with concur rences)

Management Assistant,

DRMA (w/o encl)

R. Bellamy,

DRSS

J. Linville, DRP

D. Limroth,

DRP

G.

Meyers,

DRP

M. Conner,

DRP (SALP Reports Only)

K. Abraham,

PAO (20)

SALP Report

and (2) All Inspection

Reports

J. Caldwell,

NRR

R. Martin,

NRR

RI: DRS

Cheung/mlb

05//4/90

g(a

RI:DRS

Anderson

05/g +/90

RIQS

05/3< /90

OFFICIAL RECORD

COPY

IR NM1 90-15 - 0002.0.0

05/16/90