ML17056A837
| ML17056A837 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/04/1990 |
| From: | Kane W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Burkhardt L NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 9005160271 | |
| Download: ML17056A837 (8) | |
Text
ViAY 04 IggP Docket Nos.
50-220 50-410 Niagara Mohawk Power Corporation ATTN:
Mr. Lawrence Burkhardt, III Executive Vice President Nuclear Operations 301 Plainfield Road
- Syracuse, New York 13212 Gentlemen:
Subject:
NRC-UTILITY INSPECTION WORKSHOP Per my commitment from the April 1989 Systematic Assessment of Licensee Performance Conference in King of Prussia, I am proposing a workshop to be held at the Hilton in King of Prussia, Pennsylvania on June 20-21, 1990.
The objective of the workshop is to promote a better understanding of the NRC's inspection program.
For your convenience, a block of rooms has been reserved at the Valley Forge Hilton, at the rate of $75.00 dollars per night for a single room.
Reserva-tions should be made directly with the Hilton (215-337-1200) for your staff by June 1,
1990.
After that date, reservations will be accepted according to hotel availability.
When making reservations, mention that you will be attending the NRC-Utility Inspection Workshop.
Enclosed is the proposed agenda with keynote speakers and an outline for
-breakout sessions facilitated similar to previous conferences.
Session topics are currently being developed, as proposed in the enclosed
- agenda, along with facilitators for the sessions.
Bruce Preston of PSE&G (609-339-1229) is arranging for uti,lity presentations.
Gene Kelly of my staff (215-337-5234) is coordinating NRC presentations.
Recommendations for discussion topics should be directed to Bruce or Gene as appropriate.
I anticipate that participation wi 11 include site management and senior nuclear executives, at levels similar to those in attendance at the April 1989 workshop.
We estimate that 75-90 utility representatives and 25-30 NRC representatives will attend.
I look forward to your participation.
Sincerely, QI IGINAL SIGNED BY:
Jr'PALS T. WIGGINS William F.
Kane, Director Division of Reactor Projects
Enclosure:
Workshop Agenda OFFICIAL RECORD COPY
'0,'y1<'.0 '7.";"'.i0504 pQP ALivCt~ Ci5000220 JUNE 20-21 WORKSHOP LETTERS - 0025.0
~ 0 05/01/90
Tr
Niagara Mohawk Power Corporation cc w/encl:
C.
- Mangan, Senior Vice President W. Hansen,
- Manager, Corporate guality Assurance M. Colomb, Unit 2 Superintendent, Operations C.
- Beckham, Manager, Nuclear guality Assurance Operations R. Abbott, Unit 2 Station Superintendent J. Perry, Vice President, guality Assurance K. Dahlberg, Unit 1 Station Superintendent R. Randall, Unit 1 Superintendent, Operations J. Willis, General Station Superintendent C. Terry, Vice President Nuclear Engineering and Licensing J.
- Warden, New York Consumer Protection Branch T. Conner, Jr.,
Esquire G. Wilson, Senior Attorney J.
Keib, Esquire
- Director, Power Division, Department of Public Service, State of New York State of New York, Department of Law Public Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York, SLO Designee bcc w/encl:
Region I Docket Room (with concurrences)
J. Linville, DRP G. Meyer, DRP R. Martin, NRR RI:D P
Kelly/grm 5/1/90 I:DRP iggins 0>
RI:DRP Kane 5P OFFICIAL RECORD COPY JUNE 20-21 WORKSHOP LETTERS - 0026.0.0 05/Ol/90
\\
'Ut
NRC-UTILITY SALP WORKSHOP PROPOSED AGENDA
- PAINE/JEFFERSON ROOM*"
(Ground Floor WEDNESDAY - JUNE 20 Noon - 1:00 p.m.
PLENARY SESSIONS Registration SPEAKER Gina Matakas, Secretary Division of Reactor Projects 1:00 - 1:30 p.m.
Keynote Thomas T. Hartin Regional Administrator 1:30 - 2:00 p.m.
Inspection Management William F.
Kane, Director Division of Reactor Projects 2:00 - 2:30 p.m.
Utility Perspective To Be Determined 2:30 - 3:00 p.m.
Team Inspections William Johnston, Deputy Director Division of Reactor Safety 3:00 3:30 p.m.
Utility Perspective To Be Determined 3:30 - 4:00 p.m.
Effective Communication of Findings Malcolm Knapp, Director Division of Radiation Safety and Safeguards 4:00 - 4:30 p.m.
Utility Perspective To Be Determined 4:40 " 5:00 p.m.
Programmatic Areas of Focus:
Future Direction of the Inspection Program James Partlow Associate Director for Projects, Office of Nuclear Reactor Regulation 5: 15 - 5:30 p.m.
Breakout Session Assignments
THURSDAY -.JUNE 21 BREAKOUT SESSIONS "
5 GROUPS 8:00 - Noon Breakout Sessions There will be six separate breakout
- sessions, each with approximately 20 people.
Each group will be able to address each of the suggested topics with appropriate time allotted for each.
You will be asked, at registration to identify the top three topics of interest to you.
~To ics Board Rooms l.
2.
3.
4.
5.
6.
7.
Planning 5 Scheduling Team Inspections Communication of Findings Open Item Commitment-Cost and Priorities Backfit Potential Self-Assessment Credit Open (Based on Feedback from Rm.
206 Rm.
211 Rm.
212 R01.
215 Rm.
216 Rm.
220 Letter)
Noon - 1:30 p.m.
Lunch (Buffet - Optional - at Rain Forrest Room)
AFTERNOON 1:30 ; 2:30 p.m.
Reconvene Breakouts to Form Conclusions 2:30 - 4:00 p.m.
Full Session Summaries by Facilitators
"*HANCOCK ROOM**
Second Floor 4:00 - 4:30 p.m.
Closing Remarks William F.
Kane, Director Division of Reactor Projects
I