ML17056A753

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-220/90-13 & 50-410/90-14 on 900220-0302.No Violations Noted
ML17056A753
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/05/1990
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056A754 List:
References
NUDOCS 9004180011
Download: ML17056A753 (4)


See also: IR 05000220/1990013

Text

Docket Nos.'0-220

50-410

'iagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President

Nuclear Operations

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

w>> >p

r

Subject:

Combined Inspection

Report Nos. 50-220/90-13

and 50-410/90-14

This letter transmits

the

NRC Region I inspection report for the inspections

conducted

by Mr. R.

K. Mathew and Mr. R. McBrearty of this office on February

20

through March 2,

1990, at Niagara

Mohawk, Salina

Meadows Office in Syracuse,

New York and at Nine Mile Point Units

1 and 2.

Mr. Mathew and Mr. McBrearty

discussed

the findings of the inspection with members of your staff at the

conclusion of the inspection.

Areas

examined during this inspection

are described

in the

NRC Region I

Inspection

Report which is enclosed with this letter.

Within these

areas,

the

inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

Within the scope of this inspection,

no violations were observed.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincerely,

Jacque

P. Durr, Chief

Engineering

Branch

Division of Reactor Safety

Enclosure:

NRC Region I Inspection

Report Nos. 50-220/90-13

and 50-410/90-14

CIR NMP 90-13/14 - 0001.0.0

= 04/05/90

gE. o<

OFFICIAL RECORD

COPY

9000i800ii

9

POR

AOOC

90040'

05000220

PIlC

Niagara

Mohawk Power Corporation

APA 0 5 iogp

cc w/encl:

C. Mangan,

Senior Vice Pr esident

W. Hansen,

Manager,

Corporate Quality Assurance

R. Smith, Unit 2 Superintendent,

Operations

C.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R. Abbott, Unit 2 Station Superintendent

J. Perry,

Vice President,

Quality Assurance

K. Dahlberg, Unit

1 Station Superintendent

R. Randall, Unit

1 Superintendent,

Operations

J. Willis, General

Station Superintendent

C. Terry, Vice President

Nuclear Engineering

and Licensing

J.

Warden,

New York Consumer Protection

Branch

T. Conner, Jr.,

Esquire

G. Wilson, Senior Attorney

J.

Keib, Esquire

Director,

Power Division, Department of Public Service,

State of New York

State of New York, Department of Law

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York,

SLO Designee

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

J. Linville, DRP

D. Limroth,

DRP

G. Meyer,

DRP

M. Conner,

DRP (SALP Reports Only)

PAO (23)

SALP Reports

and All Inspection

Reports

R. Martin,

NRR

J.

Dyer,

EDO

RI: DRS

Ma thew/rw

03/~g/90

RI:DRS

McBrearty

ggcb

03/gS/90

RI:DRS g g

Anderso

03@ //90

RI:DRS

Durr

0+/M/90

OFFICIAL RECORD

COPY

CIR

NMP 90-13/14

0002.0.0

03/22/90