Forwards Insp Rept 50-220/89-35 on 891211-15.No Violations Noted.Understands That Corrective Actions for All Reg Guide 1.97 Restart Issues Scheduled for Completion Before 900119 & Corrective Action for Electrical Restart Before 900210
ML17056A602
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/01/1990
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056A603 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 9002130109
Download: ML17056A602 (4)


See also: IR 05000220/1989035

Text

FEB

0 I

19SO

Docket No. 50-220

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President

Nuclear Operations

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

Inspection

No. 50-220/89-35

This letter refers to the inspection

conducted

by Mr. Leonard

Cheung of this

office on December

11 - 15,

1989 at the Corporate Office at Salina

Meadows,

Syracuse,

New York.

Mr. Cheung discussed

the findings of the inspection with

Mr. S.

Wi lczek, Jr.

and other members of your staff at the conclusion of the

inspection.

The areas

examined during this inspection

were Unit 1, Regulatory

Guide 1.97

and Electrical restart

issues

identified in previous Inspections

50-22/89-12

and 50-220/89-23,

and the corrective actions

taken

by your staff.

Based

on our inspection,

no major issues

were identified associated

with

either your completing the Regulatory Guide 1.97

and Electrical restart

issues

or our closure of these

items before restart.

However,

we note that several

incomplete activities remain which warrant continued

management

attention.

We

understand

that the corrective actions for all Regulatory Guide 1.97 restart

issues

are

scheduled

for completion before January

19,

1990

and the corrective

actions for all Elelctrical restart

issues

are

scheduled

for completion before

February

10,

1990:

Within the

scope of this inspection,

no violations were observed.

Your cooperation with us in this matter is appreciated.

Sincerely,

Jacque

P. Durr, Chief

Engineering

Branch

Division of Reactor Safety

Enclosure:

NRC Region I Inspection

Report

Number 50-220/89-35

2~'3 <<-~

-.~

)~c)2~>0

~

OFFICIAL RECORD

COPY

IR NM1 89 35

0001.0

0

PDR

A~O,

~>,,~><>O>. O

01/17/90

\\

Niagara

Mohawk Power

Corporation

FEB

0

1

19SO

cc w/encl:

C.

V. Mangan,

Senior Vice President

W. Hansen,

Manager,

Corporate Quality Assurance

R. Smith, Unit 2 Superintendent,

Operations

C.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R. Abbott, Unit 2 Station Superintendent

J. Perry,

Vice President,

Quality Assurance

K. Dahlberg, Unit

1 Station Superintendent

R. Randall, Unit

1 Superintendent,

Operations

J. Willis, General

Station Superintendent

C. Terry, Vice President

Nuclear

Engineering

and Licensing

J.

Warden,

New York Consumer Protection

Branch

T. Conner, Jr.,

Esquire

G. Wilson, Senior Attorney

J.

Keib, Esquire

Director,

Power Division, Department of Public Service,

State of 'New York

State of New York, Department of Law

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

J. Wiggins,

DRP

D. Limroth,

DRP

R. Barkley,

DRP

M. Slosson,

NRR

PAO (20) Salp Reports

and All Inspection

Reports

J.

Dyer,

EDO

RI:DRS

Cheung/tlm/rw

1/(F/90

RI:

RS

R:

S

Anderson

.

D

1/ I%90

1/9(/90

OFFICIAL RECORD

COPY

IR NM1 89-35

0002.0.0

01/17/90