Text
JAN 29 l:~g
Docket Nos.
50-220
50"410
Niagara
Mohawk Power Corporation
ATTN:
Mr. Lawrence. Burkhardt, III
Executive Vice President
Nuclear Operations
301 Plainfield Road
Syracuse,
13212
Gentlemen:
Subject:
Inspection
Report Nos. 50-220/89-28
and 50-410/89-24
'I
This letter transmits
the
NRC Region I inspection report for the inspection
con-
ducted
by Mr. H. Kaplan and Mr. S.
Chaudhary of this office on October 23-27,
1989
at the Niagara
Mohawk Corporate Office, in Syracuse,
New York and at Nine Mile
Point Unit 1 and Unit 2.
Mr, Kaplan
and Mr. Chaudhary
discussed
the findings
of the inspection with members of your staff at the conclusion of the inspection.
The enclosed
report also includes our review of the inspections
and analyses
you have performed in regard to the Unit
1 containment corrosion
problem and
your plans for future inspections
and mitigating actions.
These
subjec'ts
were
documented
in your November 22,
1989 letter to the
NRC and reviewed by the
NRC
during the period Oecember
1 to Oecember
31,
1989.
Based
on our inspections
and review we have concluded that the Unit
1 containment
torus is acceptable
for plant restart
and operation
in its current condition.
In this regard, it
is our understanding
that you will continue to perform torus irspections
every
six months or less until other actions
have
been
taken to assure
long term
integrity of the containment torus.
Also, I want to inform you NRC's position
is that certified material test records
are not acceptable
for establishing
allowable stress
levels.
I, therefore,
encourage
you to complete your engineer-
ing evaluations
and planning,
as described
in your November
22 letter,
on
a
timely schedule.
No violations or deficiencies
were identified during this inspection.
Your cooperation with us in this matter is appreciated.
Sincerely,
Origina) Signed By.
Marvin Vl. Hodges
Marvin W. Hodges,
Oirector
Oivision of Reactor Safety
Enclosure:
NRC Region I Inspection
Report Nos. 50-220/89-28
and 50-410/89-24
OFFICIAL RECORO
COPY
9002070208
900i29
ADOCK 05000220
9
IR NM1 89-28 " 0001.0.0
01/25/90
JAN 2 9 Iggg
Niagara
Mohawk Power
Corporation
cc w/encl:
C.
V. Mangan, Senior Vice President
W. Hansen,
Manager',
Corporate Quality Assurance
R. Smith, Unit 2 Superintendent,
Operations
C.
Beckham,
Manager,
Nuclear Quality Assurance
Operations
R. Abbott, Unit 2 Station Superintendent
J. Perry,
Vice Prezidept,
Quality Assurance
K. Dahlberg, Unit
1 Station Superintendent
R. Randall, Unit 1 Superintendent,
Operations
J. Willis, General
Station Superintendent
C. Terry, Vice President
Nuclear Engineering
and Licensing
J.
Warden,
New York Consumer Protection
Branch
T. Conner, Jr.,
Esquire
G. Wilson, Senior Attorney
J.
Keib, Esquire
Director,
Power Division, Department of Public Service,
State of New York
State of New York, Department of Law
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resid:-nt Inspector
State of New York
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
J. Wiggins,
D. Limroth,
R. Barkley,
M. Slosson,
PAO (20) Salp Reports
and All Inspection
Reports
J.
Dyer,
C.
Y. Cheng,
G. Bagchi,
M. Thadanai,
RI: DRS
Kag)an
1/t'l/90
RI: DRS
Chaudhary
1/)9/90
RI: DRS
RI.
RS
Strosnider
Durr
I/ff/90
1/lP/>0
R
- DRS
Hodges
1//+90
OFFICIAL RECORD
COPY
IR NM1 89-28
0002.0.0
01/19/90
C>>