ACCELERATED DISTRIBUTION DEMONSTjRATION SYSHM
'
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8911290050
DOC.DATE: 89/11/22
NOTARIZED:
NO
FACIL:50-220 Nine'ile Point Nuclear Station, Unit 1, Niagara
Powe
AUTH.NAME
AUTHOR AFFILIATION
GALLO,R.M.
Region
1, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
BURKHARDT,L.
Niagara
Mohawk Power Corp.
SUBJECT:
Forwards Safety Insp Rept 50-220/89-24
on 891126-29.No
violations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES
DOCKET
05000220
RECIPIENT
ID CODE/NAME
PD1-1
INTERNAL: ACRS
AEOD/DEIIB
DEDRO
NRR/DEST DIR
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OE LIEBEBHAN J
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1,
1
1
RECIPIENT
ID CODE/NAME
MARTIN,R.
AEOD/TPAD
NRR SHANKMAN,S
NRR/DLPQ/PEB
NRR/DREP/EPB
10
NRR/DRIS/DIR
NUDOCS-ABSTRACT
OGC/HDS1
RES MORISSEAU,D
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
A
D
R
D
NOTE TO ALL"RIDS" RECIPIENTS:
D'",
D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,
ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION
LISIS FOR DOCUMENTS YOU DON'T NEEDl
AL NUMBER OF COPIES
REQUIRED:
LTTR
26
ENCL
26
0'
Docket No.
50-220
Niagara
Mohawk Power Corporation
ATTN:
Mr. Lawrence Burkhardt, III
Executive Vice President
Nuclear Operations
301 Plainfield Road
Syracuse,
New York 13212
NON 2S >>SS
Gentlemen:
Subject:
Inspection
Report
No. 50-220/89-24
This letter refers to
a special
safety inspection
conducted
by Ms. Tracy
Walker and others of this office on September
26
29,
1989, at the Nine Mile
Point Nuclear
Power Station, Unit 1, of activities authorized
by
NRC License
No.
A discussion
of our findings was held by Ms. Walker with yourself
and other members of your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the
NRC inspection
~
~
report which is enclosed with this letter.
Within these
areas,
the inspection
, consisted
of selective
review of procedures
and records,
interviews with
personnel
and observations
by the inspectors.
Within the
scope of this inspec-
tion,
no violations or, deviations
were observed.
Improvement
was noted in crew
communications
and definition of crew responsibi lities.
We have concluded that both of the crews that were evaluated
demonstrated
a
satisfactory
level of performance
in the
use of Emergency Operating
Procedures
to support
power operation.
However,
one Station Shift Supervisor
and one,
Assistant Station Shift Supervisor- did not demonstrate
a satisfactory
level of
performance.
You are expected
to provide remedial training for the individuals
who did not perform satisfactorily prior to their participation in licensed
duties during power operations.
Thank you for informing us of the corrective actions
documented
in your letters
dated August 31,
1989
and September
14,
1989.
Some of these
actions
were
assessed
during this inspection.
The remainder of the actions will be examined
during future inspections
of your licensed operator
programs.
Certain weaknesses
that were observed
during this inspection
(discussed
in
section 2.3.2 of the enclosed
report) appear to be similar to weaknesses
observed
in the previous evaluation of operator
performance
in May, 1989.
The
repeated
weaknesses
indicate that your corrective actions
may not have
been
effective or complete in these
areas.
Future inspections of your'icensed
operator training program will assess
your actions to correct the weaknesses
observed
during this inspection.
pygmy 900&
ggQQ220
g+3.%22
p.gp
ADOC)'
pD(
9
0
Niagara
Mohawk Power Corporation
No reply to this letter is required.
Your cooperation with us in this matter
is appreciated.
Sincerely,
Original Signea By:
Robert
M. Gallo, Chief
Operations
Branch
Division of Reactor Safety
Enclosure:
Inspection
Report
No. SO-220/89-24
cc w/enclosure:
C.
V. Mangan,
Senior Vice President
W, Hansen,
Manager,
Corporate Quality Assurance
R. Smith, Unit 2 Superintendent,
Operations
CD
Beckham,
Manager,
Nuclear Quality Assurance
Operations
R. Abbott, Unit 2 Station Superintendent
J. Perry,
Vice President,
Quality Assurance
K. Dahlberg, Unit
1 Station Superintendent
R. Randall, Unit
1 Superintendent,
Operations
J. Willis, General
Station Superintendent
C.'erry,
Vice President
Nuclear Engineering
and Licensing
J.
Warden,
New York Consumer Protection
Branch
T. Conner, Jr.,
Esquire
G. Wilson, Senior Attorney
J.
Keib, Esquire
Director,
Power Division, Department of Public Service,
State of New York
State of New York, Department
of Law
L. E. Phillips,
P.
C.
Wen,
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
bcc w/enclosure:
Region I Docket
Room (with concurrences)
J. Dyer,
M. Slosson,
J. Wiggins,
DRP'.
Limroth,
R. Barkley,
PAO (20) Salp Reports
and All Inspection
Reports
N. Conicella,
T. Walker,
DRS Files (3)
OFFICIAL RECORD
COPY
WALKER/NMP REPORT/11/3/89 - 0001. 1.0
11/1S/89
0
Niagara
Mohawk Power Corporation
bcc w/o enclosure:
Management Assistant,
DRMA
DRS:Rj
Conicella/dmg
ll/iV/89
DRS:RI ~~~
Wa1 ker
I'~
11/ld /89
DRS: RI+
D
Conte
&i<'a
j.q
11/I-I /89
11+V89
OFFICIAL RECORD
COPY
WALKER/NMP REPORT/11/3/89
0002.0.0
11/07/89