Text
Docket Nos.:
50-220
50-410
Niagara
Mohawk Power Corporation
ATTN:
Mr. Lawrence Burkhardt, III
Executive Vice President
Nuclear Operations
301 Plainfield Road
.Syracuse,
13212-
Gentlemen:
Subject:
NRC Region I Combined Inspection
Report
Nos.
50-220/89-07
and
50-410/89-07
This
letter
transmits
the
results
of
the
routine
inspection
conducted
by
Messrs.
W. Cook,
R. 'Laura,
R.
Temps
and others of this office on July 7 through
September
6,
1989, at Nine Mile Point Units
1 and
2, Scriba,
A sum-
mary of the findings
was
presented
to Mr. J. Willis and other
members of your
staff at the conclusion of the inspection..
The inspectors
found
numerous
equipment
concerns
during their walkdown of the
Emergency Ventilation System.
Many of these
concerns
had not been
found during
an earlier
Niagara
Mohawk walkdown.
Further,
we
note
that
your
subsequent
evaluation
of these
concerns
concluded
that errors
regarding
heater calibra-
tions could have adversely
impacted
the
Emergency Ventilation System's ability
to perform its function under accident
conditions.
We will continue to evalu-
ate your system walkdowns
and your understanding
regarding
the
shortcomings
of
earlier walkdowns.
Also,
the
inspectors
identified
several
examples
of
poor radiological
work
practices
at Unit 1 that warrant your prompt attention.
Although
each
indi-
vidual
example
is of minor safety significance,
collectively they indicate
a
potential
weakness
in your General
Employee Training program
and
the
need for
additional
supervisory oversight of work activities in the field.
We appreciate
your cooperation.
Sincerely,
James
T. Wiggins, Chief
Reactor
Projects
Branch
No.
1
Division of Reactor Projects
Enclosure:
NRC Region I Combined Inspection
Report Nos.
50-220/89-07
and 50-410/89-07
OFFICIAL RECORD
COPY CIR
NMP 89-07
0001.0.0
10/11/89
Q9g() c f.A '04 85'10k C
ADCiCK 0500022'~
9
pgr:
Niagara
Mohawk Power Corporation
OCY16 1989
cc w/encl:
C.
Mangan,
Senior Vice President
W. Hansen,
Manager,
Corporate Quality Assurance
R. Smith, Unit 2 Superintendent,
Operations
C.
Beckham,
Manager,
Nuclear Quality Assurance
Operations
R. Abbott, Unit 2 Station Superintendent
J. Perry,
Vice President,
Quality Assurance
K. Dahlberg, Unit
1 Station Superintendent
R. Randall, Unit
1 Superintendent,
Operations
J. Willis, General
Station Superintendent
C. Terry, Vice President
Nuclear Engineering
and Licensing
'. Warden,
New York Consumer Protection
Branch
T. Conner, Jr.,
Esquire
G. Wilson, Senior. Attorney
J. Keib, Esquire
Director,
Power Division, Department of Public Service,
Sta
State of New York, Department of Law
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
te of New York
bcc w/encl:
Region I Docket
Room (with concur rences)
,
Management Assistant,
DRMA (w/o encl)
J. Wiggins,
D. Limroth,
G. Meyer,
R. Barkley,
M. Miller, SLO
K. Abraham,
PAO.
R. Capra,
M. Slosson,
J.
Dyer,
RI: DRP
~
WCook/mjd
10/ ( ( /89
RI:DRP
RI: DRP
GMeyer
JWiggins
10/<(/89
10/8/89
OFFICIAL RECORD
COPY CIR
NMP 89-07
0002..0.0
10/11/89