Forwards Operator Licensing Program Evaluation & BWR Power Oscillation Program Insp Rept 50-410/89-12(OL) During Wks of 890717 & 0714.Program Determined Unsatisfactory Based on Total Number of Individual Failures & Numerous Weaknesses
ML17056A247
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/23/1989
From: Boger B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056A248 List:
References
NUDOCS 8908310254
Download: ML17056A247 (8)


See also: IR 05000410/1989012

Text

RECIPIENT

ID CODE/NAME

PD1-1

PD

BENEDICTIR

COPIES

RECIPIENT

LTTR ENCL

.

ID CODE/NAME

1

1

SLOSSONiM

1

1

COPIES

LTTR ENCL

1

1

. gc CE1ZRATED

DISTR1BUTION

DEMONSTRATION

SYSTEM

REGULATORY

NFORMATION DISTRIBUTION S

EM (RIDS)

ACCESSION NBR:8908310254

DOC.DATE: 89/08/23

NOTARIZED: NO

DOCKET t

FACZL:50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara

Moha

05000410

AUTE.NAME

AUTHOR AFFILIATION

BOGERiB.A.

Region 1, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

BURKHARDT,L.

Niagara

Mohawk Power Corp.

SUBJECT:

Forwards requalification program .evaluation

6

BWR power

oscillat'ion program Insp Rept 50-410/89-12

OL.

DISTRIBUTION CODE:

ZE42D

COPIES

RECEIVED:LTR J

ENCL

i

SIZE:

TITLE: Operator Licensing Examination Reports

NOTES:

D

Sl,

A

INTERNAL: ACRS

NRR SHANKMANgS

NRR DLPQ/OLB 10

QtEG FIL

02

EXTERNAL: LPDR

NSZC

2

8

1

1

1

1

1

1

1

1

AEOD/DSP/TPAB

NRR/DLPQ/HFB 10

NUDGCS-ABSTRACT

RGN1

FILE

01

NRC PDR

1

1

1

1

1

1

1

t.lMITEDDlSTRlBtmON OF ENCLOSURES DUE TO SEE

D

NOIR 'ZO ALL 'KIDS" R1KZFGWZS:

PLFASE HELP US XO REDOCB RESTE! ~CI'HE DOCUMENT CGÃHK)L DESK

RXN P1-37

(EXT. 20079)

KO EIZKMGS~ MME PBM DISTRIBUTION

LISTS XQR DOCUMENTS YOU DQNIT NEEDf

D

D

8

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

15

ENCL

Oocket Nos.

50-410

AUG 28 1989.

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President

Nuclear Operations

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

REQUALIFICATION PROGRAM EVALUATION AND BWR

POWER OSCILLATION PROGRAM

INSPECTION,

COMBINEO REPORT

NO. 50-410/89-12

(OL)

During the weeks of July

17 and July 24,

1989,

the

NRC conducted

a requalifica-

tion program evaluation at the Nine Mile Point Nuclear Station, Unit No. 2.

The evaluation

was conducted

in accordance

with Revision

5 to NUREG-1021,

"Operator Licensing Examiner Standards,"

specifically,

ES-601,

"Administration

of NRC Requalification

Program Evaluations."

The evaluation

had two purposes:

(1) to evaluate

individual operator

competency,

and (2) to evaluate

the effect-

iveness of the licensed operator requalification training program at Nine Mile

Point, Unit 2.

Generic findings and preliminary results of the evaluation

were

discussed

during the interim and at the conclusion of the two week examination

period with members of your staff identified in the enclosed

report.

As a result. of, this evaluation,

the Nine Mile Point,. Unit'. 2 requalification

program has

been rated

as unsati sfactory.

NRC results indicate four of 12

rnactor operators

and five of 12 senior reactor operators: failed at. least

one..

portion of the examination.

Additionally, two of six crews were determined to

be unsatisfactory.

Your requalification

program

was determined to be unsatis-

factory based

on the total. number of individual failures",: in'addition, the

progra~ exhibited

numerous- weaknesses

which are discussed

in the enclosed

report.

As a partial justification for allowing continued operation of Nine Mile Point,

Unit 2,

an additional requalification examination

was conducted during the week

of July 31,

1989, for five additional individuals.

One of the

two senior

reactor operators failed the written portion of the examination.

All other

operators,

except

one reactor operator,

passed

the entire examination

and the

clew was determined to be satisfactory.

The one reactor operator did not take

the written examination but has

passed all other portions..

As was discussed

in a telapnone

conversation

between yourself and Robert Gallo

of this office on August 8,

1989, you are expected

to complete

remedial train-

ing for all operators

and all crews that failed the

NRC requalification exami-

nation.

Further,

the individuals who were failed by the

NRC will not be

. returned to licensed duties until they have

been successfully

re-examined

by

the

NRC.

Also, the crews that were determined to be unsatisfactory

shall not

8908310254

890823

PDR

ADQCK 050004i0

V

PMlj

OFFICIAL RECORO

COPY

NMP2 REQUAL REPORT - 0001.0.0

08/12/89

Niagara

Mohawk Power Corporation

be returned to licensed duties

as substantially the

same

crews until they have

been successfully

re-examined

by the

NRC.

The

NRC re-examination

is scheduled

for the week of September

18,

1989.

To support the

NRC re-examination,

you are

requested

to provide validated examination material to the

NRC for review and

approval

by September

5,

1989.

Section

6 of this report contains

the

NRC review of the Requalification

Program

Action Plan,

the Requalification

Exam Remediation

Schedule,

and the

NMPC Justi-

fication for Continued Operation

submitted to the

NRC on August 10,

1989.

Based

on our independent

assessment,

we agree that Nine Mile Point-, Unit 2,

may

continue

power operations for the reasons

stated

herein.

However,

we are

concerned with the adequacy of the action plan in that the deficiencies in the

operator training program are not fully addressed.

Specifically, the results

of the requalification examination

and the results of the- inspection

performed

on

BWR power osci llations indicate that performance

and knowledge deficiencies

exist in your operations

organization.

The action plan does not address

the

underlying reasons

why these deficiencies exist.

In addition, the plan

contains

no provisions for independent

assessment

of training program actions.

You are requested

to review the requalification program action plan

and respond

to

NRC concerns

by September ll, 1989.

The response

requested

by this letter is not subject to the clearance

proce-

dures of the Office of Management

and Budget

as required by the Paperwork

Reduction Act of 1980; PL-96-511.

In accordance

with 10 CFR 2.790 of the Commission regulations,

a copy of this

letter

and. the enclosure will be placed

in the

NRC Public: Document.i<oom.

Should you have

any questions

regarding this evaluation,

please

contact the

undersigned';

Sincerely,

ln'%8iuAy Sided Byg

Bruce A. Boger, Acting Director

Divi s ion

of Reactor

Sa fety

Enclosures:

l.

Operator Licensing

Program Evaluation

and

BWR Power Oscillation Program.

Inspection

Report

No. 50-410/89-12

(OL)

2'.

Attachment 1, Persons

Contacted

3.

Attachment 2, Simulator Examinations

(cover sheets

only)

4.

Attachment 3, Job Performance

Measures

(cover sheets

only)

5.

Attachment 4, Written Examination

and Answer Key Part

A (RO and

SRO)

6.

Attachment 5, Written Examination

and Answer Key Part

B (RO and

SRO)

7.

Attachment 6, Licensee Letter, dated August 10,

1989 from L. Burkhardt,

NMPC, to W. Russell,

USNRC enclosing;

(1) the Nine Mile Point Unit 2

Requalification

Program Action Plan, (2) the Nine Mile Point Unit 2

Requalification

Exam Remediation

Schedule,

and (3) Niagara

Mohawk Power

Corporation's Justification for Continued Operation

OFFICIAL RECORD

COPY

NMP2 REQUAL REPORT - 0002.0. 0

08/12/89

II

Niagara

Mohawk Power Corporation

cc w/enclosures:

C.

V. Mangan,

Senior Vice President

D. Palmer, Acting Manager, Quality Assurance

W. Hansen,

Manager,

Corporate Quality Assurance

R.

G. Smith, Unit 2 Superintendent,

Operations

C.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R.

B. Abbott, Unit 2 Station Superintendent

J. Perry,

Vice President,

Quality Assurance

K. Dahlberg,

Unit

1 Station Superintendent

R. Randall, Unit I Superintendent,

Operations

J . Willis, General

Station Superintendent

C. Terry, Vice President

Nuclear Engineering

and Licensing

J.

F. Warden,

New York Consumer Protection

Branch

Connor 5 Wetterhahn

Troy B. Conner, Jr.,

Esquire

Gary D. Wilson, Senior Attorney

John

W. Keib, Esquire

Director,

Power Division, Department of Public Service,

State

State of New York, Department of Law

Licensing Project Manager,

NRR

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident. Inspector

State of New York

of New York

bcc.w/enclosures:

Region I Docket

Room (with concurrences)

DRP Section Chief

PAO'(2) Salp Reports

and All Inspection

Reports

J.

Dyer,

EDO

Operator

Licensing>> Docket-Room,

N. Conicella, Operations

Engineer,

DRS

R. Barkley, Reactor Engineer,

DRP

DRS Files (2) (w/o Attachments)

bcc w/o enclosures:

Management Assistant,

DRMA

RI

DRS

RI:DRS

Conicella/tl /d

Cont

08/Zq/89

PP

P

08h//89

I:

S

Gal la

08/+/89.

S

g r

08/$989-.

OFFICIAL RECORD

COPY

NMP2

REQUAL REPORT - 0003.0. 0

08/12/89