ML17056A129

From kanterella
Jump to navigation Jump to search
Forwards Special Team Insp Rept 50-220/89-16 on 890522-26. Non-cited Violation Re Lack of Proper Administrative Paperwork to Document Pressure Switch Calibrs Performed on 850809,noted
ML17056A129
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/18/1989
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056A130 List:
References
NUDOCS 8907240047
Download: ML17056A129 (8)


See also: IR 05000220/1989016

Text

D1$7KBUTION

DEMONSTRE,TION

SYSTEM

REGULATORY:INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8907240047

,

DOC.DATE: 89/07/18

NOTARIZED: NO

DOCKET

FACIL:50-,220 Nine Mile Point Nuclear Station, Unit 1, Niagara

Powe

05000220

AUTH.NAME

AUTHOR AFF?LIATION

COLLINS,S.J.:

Region 1, Ofc of the Director

RECIP.NAME-

,

.

RECIPIENT AFFILIATION

. BURKHARDT,L

." Niagara

Mohawk Power Corp'.

~\\,

I

SUBJECT:

Forwards Special

Team Insp Rept 50-220/89-16

on 890522-26.

DISTRIBUTION CODE: IE01D

COPIES

RECEIVED:LTR

ENCL

/

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation Response

NOTES

R

I

RECIPIENT

ID CODE/NAME

PD1-1

PD

INTERNAL: ACRS

AEOD/DEIIB

DEDRO

NRR/DEST DIR

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NUDOCS-ABSTRACT

OGC/HDS 1

RES MORISSEAU,D

AL: LPDR

NSIC

COPIES

LTTR. ENCL

1

1'

2

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

.

1

1 '

RECIPIENT

ID CODE/NAME

SLOSSON,M

AEOD

AEOD/TPAD

NRR SHANKMAN,S

NRR/DLPQ/PEB

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

OE~IEBERMAN,J

RGN1

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

h

D

S

NOZE 'IO ALL RIZS" RXIPZIMS:

&EASE HELP US IO REDUCE %LSX8!

CXMHKT 'IHE DOCUMEÃZ CXWHL

DESK,

LXSTS KR DOCUMENXS VXJ DCNFT NEEDf

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

R

I

D

S

h

D

D

S

(A

I

18 JUL 1989

Docket No. 50-220

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President - Nuclear

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

Inspection

Report

No. 50-220/89-16

This letter transmits

the results of the Special

Team Inspection

(STI) led by

Mr. Glenn Meyer of this office from May 22,

1989, to May 26,

1989, at Nine Mile

Point Unit 1, Scriba,

New York.

A summary of the findings was presented

to Mr.

Kim Dahlberg

and other members of your staff at the conclusion of the inspection.

The

team evaluated

additional allegations

by a former Unit

1 technician

concerning

problems during 1986.

Our review noted that Niagara

Mohawk Power Corporation

(NMPC) was previously

made

aware of some of these

issues.

The team conducted

an

independent

site inspection

and concluded that specific facts in the allegations

were in part substantiated

and with one exception did not constitute violations of

NRC requirements.

One non-cited violation was identified regarding

the lack of

proper administrative

paperwork to document pressure

switch calibrations

performed

on August 9,

1985.

The

NRC also concludes that weaknesses

in work control associated

with HPCI switch calibration

and welding in the drywell are additional

examples

of the fai lure of NMPC in 1986 to aggressively

identify and correct problems.

These additional

examples

would not have

changed

the enforcement

action taken

based

upon Inspection

Report 50-220/86-17.

The

NRC is also concerned

that the

NMPC Fitness for Duty Program,

implemented

pur-

suant to the NRC's policy statement,

has not been effective in detecting

or deter-

ring illegal drug use.

The team

found that three of six individuals alleged to

have

used illegal drugs in 1986 subsequently

tested positive during NMPC's

1988

investigation,

substantiating

in part the allegation that illegal drugs were

likely used

and that

NMPC's Fitness for Duty Program in effect at the time did

not detect their use.

The

team concluded that

NMPC's investigations

in 1988 of

illegal drug use

by

NMPC personnel

and the resultant actions

appeared

consistent

with the

NMPC Fitness for Duty Program

as revised

in April 1987.'he

Fitness

for Duty Program is currently being upgraded to meet

NRC's

new rules

on Fitness

for Duty (10 CFR Part 26) and will be the subject of subsequent

inspections.

We appreciate

your cooperation.

No reply to this letter is required.

Sincerely,

OPIQINAL SlGNED BY

S<":MiJG j. COL.LII'lS

Samuel J. Collins, Deputy Director

Division of Reactor

Projects

Enclosure:

NRC Region I Inspection

OFFICIAL RECORD

8907240047

890718

PDR

ADOCK 05000220

0

PDC

Report

No. 50-220/89-16

COPY

IR89"16/NM1 - 0004.0. 0

06/30/89

Niagara

Mohawk Power Corporation

cc w/encl:

Connor 5 Wetterhahn

Gary D. Wilson, Senior Attorney

C. Mangan,

Senior Vice President

J. Willis, General

Superintendent

K. Dahlberg, Station Superintendent,

Unit

1

R. Abbott, Station Superintendent,

Unit 2

R. Randall, Unit

1 Superintendent

of Operations

R. Smith, Unit 2 Superintendent

of Operations

D. Palmer, Acting Manager, guality Assurance

J.

Perry, Director, Nine Mile Point Unit

1 Restart

Task Force

C.

Beckham,

Manager Nuclear guality Assurance

Operations

W. Hansen,'Manager

Corporate (juality Assurance

Troy B. Conner, Jr.,

Esquire

.

Director,

Power Division

Department of Public Service,

State of New York

James

F. Warden,

New York Consumer Protection

Branch

New York State,

Department of Law

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encl

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encls)

J. Johnson,

Section Chief,

DRP

M. Slosson,

Licensing Project Manager,

Unit

1 and

2

State Liaison Officer (SLO)

J.

Dyer,

EDO, Regional

I Coordinator

Judge

A. Rosenthal,

ASLAP

C. White, RI OI

Allegation File RI-89-A-0043

RI:DRP

Meyer

  • RI:DRP

Johnson

  • RI:DRP

Linvi 1 1 e.

ns

7/

/89

7/

/89

7/

/89

7/i J/89

OFFICIAL RECORD

COPY

IR89-16/NM1 - 0005.0.0

  • SEE PREVIOUS

CONCURRENCE

06/30/89

Niagara

Mohawk Power Corporation

cc w/encl:

Connor

& Wetterhahn

Gary D. Wilson, Senior Attorney

C.

Mangan,

Senior Vice President

J . Willis, General

Superintendent

K. Dahlberg, Station Superintendent,

Unit

1

R. Abbott, Station Superintendent,

Unit 2

R. Randall, Unit

1 Superintendent

of Operations

R. Smith, Unit 2 Superintendent

of Operations

D. Palmer, Acting Manager, Quality Assurance

J. Perry, Director, Nine Mile Point Unit

1 Restart

Task Force

C.

Beckham,

Manager Nuclear Quality Assurance

Operations

W. Hansen,

Manager Corporate Quality Assurance

Troy B. Conner, Jr.,

Esquire

Director,

Power Division

Department of Public Service,

State of New York

James

F. Warden,

New York Consumer Protection

Branch

New York State,

Department of Law

Public Document

Poom

(PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information "enter (NSIC)

NRC Resident

Inspector

State of New York

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encls)

J.

Johnson,

Section Chief,

DRP

M. Slosson,

Licensing Project Manager,

Unit

1 and

2

State

Liaison Officer (SLO)

J.

Dyer,

EDO, Regional

I Coordinator

Judge

A. Rosenthal,

ASLAP

C. White,

RI OI

Allegation File RI-89-A-0043.

RI:DRP

yer

l~/89

D

Jo

son

7

/8

4Jaiwp

RI:DRP

7/(o/89

RI: DRP

Col l ins

7/

/89

OFFICIAL RECORD

COPY

IR89-16/NM1 " 0005.0.0

07/10/89