Requests That Encl Ref Matl Be Furnished by 890628 in Order to Meet Schedule for Operator Licensing Exams Scheduled for 890828 & 29.W/o Stated Encls
ML17055E701
Person / Time
Site: Nine Mile Point 
Issue date: 05/08/1989
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8905180026
Download: ML17055E701 (10)


Text

A,C CELEBRATED DI BUTION DEMONS A,TION SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RZDS)

",','<j, ACCESSION NBR:8905180026 DOC DATE: 89/05/08 NOTARIZED: NO

>>ACZL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe AUTH.NAME AUTHOR AFFILIATION CONTE,R.J.

Region 1, Ofc of the Director RECIP. NAME RECIPIENT AFFILIATION BURKHARDT,L.

Niagara Mohawk Power Corp.

DOCKET 05000220 SUBJECT.:

Informs that written senior reactor operator licensing exams rescheduled for 890828.

DISTRIBUTION CODE:

IE42D COPIES RECEIVED:LTR J ENCL J SIZE:

TITLE: Operator Licensing Examination Reports NOTES:

RECIPIENT ID CODE/NAME PDl-1 PD INTERNAL: ACRS NRR SHANKMANgS OLB 10 FILE 02 EXTERNAL: LPDR NSZC COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 RECIPIENT ZD CODE/NAME SLOSSONgM AEOD/DSP/TPAB NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGN1 FILE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 HVZE 10 ALL 'KIDS" RECZPIBGS:

PLEASE HELP US IO REDOCB HASTE!

CORYZA,CT 'IHE DOCXJMEÃr CGNI'ROL DESK, ROC'l-37 (EXT. 20079)

%0 ELXMQQXH YOUR NMB PSEUD DISTRZBVZICH LISTS FOR DOCUtKRZS YOU DGNiT HEEDf TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

C-

gal ~<cu.

(4 tp

~4 0

Cy

~i 4t n

I 0

I

< ~

i 0

V/

n +a*>>>>

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALEROAD KING OF PRUSSIA, PENNSYLVANIA19406 MAY 8 lggg Docket Nos. 50-220 Niagara Hohawk Power Corporation ATTN:

Hr. Lawrence Burkhardt, III Executive Vice President Nuclear Operations 301 Plainfield Road

Syracuse, New York 13212 Gentlemen:

SUBJECT:

SENIOR REACTOR OPERATOR LICENSING EXAHINATIONS In a telephone conversation between Hr. R. Seifried, and Hr. T. Fish, Examiner, arrangements were made for the administration of licensing examinations at Nine Hile Point, Unit l.

The written examinations are scheduled for August 28, 1989.

The operating examinations are scheduled for August 29, 1989.

To meet the above

schedule, it will be necessary for you to furnish the reference material listed in Enclosure 1, "Reference Haterial Requirements for Reactor/Senior Reactor Operator Licensing Examinations,"

by June 28, 1989.

Any delay in receiving approved, proper ly bound and indexed reference

material, or the submittal of inadequate or incomplete reference material may result in the examination being rescheduled.

Hr. Seifried has been advised of our reference material requirements, and the address where each set is to be mailed.

You are responsible for providing adequate space and accommodations for administration of the written examinations.

Enclosure 2,

"Requirements for Administration of Written Examination,"

describes our requirements for conducting these examinations.

Enclosure 3 contains the Rules and Guidelines that will be in effect during the administration of the written examination.

The facility management is responsible for ensuring that all applicants are aware of these rules.

The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 4,

"Requirements for Facility Review of Written Examinations."

To better document simulator examinations, the Chief Examiner will have the simulator operator record predetermined plant conditions (i.e.,

plant

pressure, temperature, pressurizer level, etc.), for each simulator scenario.

8905180026 89050S PDR ADOCK 05000220 V

PNU OFFICIAL RECORD COPY

Niagara Mohawk Power Corporation The applicants will be responsible for providing this information, with any appeal of a simulator operating examination.

Therefore, your training staff

'hould retain the original simulator examination scenario infor mation until all applicants who took examinations have either passed the operating examination, accepted the denial of their license, or filed an appeal.

All completed senior reactor operator license applications should be submitted at least 30 days before the first examination dates so that we will be able to review the training and experience of the candidates, process the medical cer tifications, and prepare final examiner assignments after applicant eligibility has been determined.

If the applications are not received at least 30 days before the examination dates, it is likely that a postponement will be necessary.

Mr. Seifried has been informed of the above requirements.

This request is covered, by Office of Management and Budget Clearance Number 3150-0101 which expires May 31, 1989.

The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per

response, including gathering, xeroxing and mailing the required material.

Comnents on the accuracy of this estimate and suggestions to reduce the burden may be directed to the Office Of Management and

Budget, Paperwork Reduction Project 3150-0101),

Room

3208, New Executive Office
Building,

~ Washington D.C.

20503, and the U.S.

Nuclear Regulatory Cooeission, Records and Reports

. Management

Branch, Office of Information Resources Management, Washington, D.C.

20555.

Thank you for your consideration in this matter.

If you have any questions regarding the examination procedures and requirements, please contact me at (215) 337-5124.

Sin e ely, chard J.

C e, Chic Boiling Water Reactor Section Operations Branch Division of Reactor Safety 2.

3.

4 ~

Enclosures:

1.

Reference Material Requirements for Reactor/Senior Reactor Operator Licensing Examinations Requirements for Administration of Written Examinations NRC Rules and Guidelines for Written Examinations Requirements for Facility Review of Written Examinations

Niagara Mohawk Power Corporation cc w/enclosures:

C. V. Mangan, Senior Vice President D. Palmer, Acting Manager, guality Assurance W. Mansen,

Manager, Corporate guality Assurance R.

G. Smith, Unit 2 Superintendent, Operations C.

Beckham, Manager, Nuclear guality Assurance Operations R.

B. Abbott, Unit 2 Station Superintendent J. Perry, Vice President, guality Assurance Dahlberg, Unit 1 Station Superintendent R. Randall, Unit 1 Superintendent, Operations J. Willis, General'Station Superintendent C. Terry, Vice President Nuclear Engineering and Licensing J. F. Warden, New York Consumer Protection Branch Connor 8 Wetterhahn Troy B. Conner,, Jr., Esquire Gary D. Wilson, Senior Attorney John W. Keib, Esquire

Director, Power
Division, Department of Public
Service, State of New York State of New York, Department of Law A. Rivers, Supervisor Training Licensing Project Manager, NRR Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New York

Niagara Mohawk Power Corporation bcc w/enclosures:

Region I Docket Room (with concurrences)

DRP Section Chief Robert J. Bores, DRSS B. Clayton, EDO Chief Examiner Assigned Examiners OL Facility File RI:DRS Fish djh 5/$ /89 R '

t 5/ 6/89 OFFICIAL RECORD COPY