ACCELERATED
DlSTKBt 'TION
DE MONiTRAT10N
Fr'FLEM
REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8903210328
DOC.DATE: 89/03/10
NOTARIZED: NO
FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara
Powe
50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara
Moha
AUTH.NAME
AUTHOR AFFILIATION
WENZINGER,E.C.
Region 1, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATXON
BURKHARDT,L.
Niagara
Mohawk Power Corp.
SUBJECT:
Forwards Insp Repts 50-220/89-02
& 50-410/89-01
on
890106-0217.Violation noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
DOCKET
05000220
05000410
INTERNAL':
RECIPIENT
ID CODE/NAME
PD1-1
BENEDICT,R
AEOD/DEIIB
NRR SHANKMAN,S
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
RMAN,J
COPIES
LTTR ENCL
1
1
1
1
2
2
1
1
1
1
1
1
1
1
2
-
2
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
SLOSSON,M
DEDRO
'RR/DEST DIR
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS1
RGN1
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
EXTERNAL: LPDR
1
1
1
1
NRC PDR
1
1
R
I
S
NOPE 'IO ALL "RXDS"
RECXPXEÃIS'IZASE
HELP US 10 REDUCE HASTE!
CGNZACI'HE DOCUMEMI'XNZROL DESK,
ROOM Pl-37
(EXT. 20079)
TO ELZKBQTE YOUR K@K FRED DZSTRIBVTIGN
LISTS FOR DOCUMERZS YOU DON'T HEED(
TOTAL NUMBER OF COPXES
REQUIRED:
LTTR
26
ENCL
26
Docket No. 50-220
Docket No. 50-410
10 MAR 1888
Niagara
Mohawk. Power Corporation
ATTN:
Mr. Lawrence
Bur khardt, III
Executive Vice President
Nuclear
301 Plainfield Road
Syracuse,
13212
Gentlemen:
Subject:
Inspection
Report
No.- 50-220/89-02
and 50-410/89-01
This letter transmits
the results of the routine inspection
conducted
by Messrs.
W. Cook,
R. Laura,
R.
Temps
and others of this office on January
6,
1989 through
February
17,
1989 at Nine Mile Point Units
1 and 2, Scriba,
A summary
of the findings was presented
to Mr. J. Willis and other members of your staff
at the conclusion of the inspection.
During this period the inspectors
noted
an unsatisfactory
trend in the control
of system status
at Unit 2, specifically, acid .drain line valves,
tygon tubing,
and
scram discharge
volume air vents not properly aligned.
You and your staff
are encouraged
to assess. this trend
and take prompt action to improve in this
area
before it becomes
a more serious
safety concern.
The inspectors
also
noted another
example of insufficient management
followup of identified
deficiencies
and programatic
concerns
documented
in your
1987 Maintenance
Self-Assessment.
We believe the issues
raised in the Maintenance
Assessment
and the specific items reviewed
by the inspectors
are appropriately
addressed
by your Restart Action Plan.
Please
inform us after your review of the enclosed
report if your observations
and conclusions
on this matter differ from our
evaluation.
l
C .
As reported
by your staff in Licensee
Event Report (LER) No. 88-19,
a violation
of Technical Specification 4.2.6.b involving the Inservice Testing
program was
identified.
We consider this a serious violation and,
as stated in your LER,
another
example of the failure of your
management
staff to properly oversee
a
required program.
NRC evaluation of this matter is still in progress
and any
additional action related to this violation will be communicated
to you via
separate
correspondence.
We appreciate
your cooperation.
Sincerely,
6ICQQ g@ygg g(
Enclosure:
NRC Region I, Combined Inspection
OFFTCIAL
S903210328
8&o310
ADGCK 05000220
Q
Edward
C. Wenzinger, Chief
Projects
Branch No.
2
Division of Reactor Projects
Report Nos. 50-220/89-02;
50-410/89-01
RECORD
COPY
IR NMP 89-01
0001.0.0
03/10/89
J
ol
0
e
Niagara
Mohawk Power Corporation
$ 0bfA8 1%3
cc w/encl:
Connor
& Wetterhahn
Gary D. Wilson, Senior Attorney
C.
Mangan,
Senior Vice President
J. Willis, General
Superintendent
K. Dahlberg, Station Superintendent,
Unit
1
R. Abbott, Station Superintendent,
Unit 2
R. Randall, Unit
1 Superintendent
of Operations
R. Smith, Unit 2 Superintendent
of Operations
J. Perry,
Vice President,
equality Assurance
C.
Beckham,
Manager Nuclear guality Assurance
Operations
W. Hansen,
Manager Corporate guality Assurance
Troy B. Conner, Jr.,
Esquire
Director,
Power Division
Department of Public Service,
State of New York
James
F. Warden,
New York Consumer Protection
Branch
New York State,
Department of Law
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encls)
J. Johnson,
Section Chief,
M. Slosson,
Licensing Project Manager,
Unit 1 and
2
State
Liaison Officer (SLO)
B. Clayton,
EDO, Regional
I Coordinator
P. Koltay, SRI,
IP3
W. Schmidt,
SRI, Fitzpatrick
R. J. Kiessel,
DOEA,
M. Conner,
TSS,
RI
RI:DRP
Bargl ey/rhl
~(bg ~6
3/q /89
RI: DRP
Johnson
Wenzing
e6+ O'J
3/0 /89
3/
/8
OFFICIAL RECORD
COPY
IR
NMP 89-01
0001. 1. 0
03/08/89
0