Forwards Insp Repts 50-220/88-20 & 50-410/88-20 on 881118- 890106.Concerns Re Errors Made During Work Release in Unit 2,consisting of Two Errors Concerning Tagout Sys & One Error Resulting from Maint on Wrong Component Expressed
ML17055E490
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 01/26/1989
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055E491 List:
References
NUDOCS 8902070218
Download: ML17055E490 (6)


See also: IR 05000220/1988020

Text

gt

ACCKLKRATED

DISTKBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~

~

~

~

ESSION NBR:8903G70218

DOC.DATE: 89/01/26

NOTARIZED:

NO

DOCKET ¹

1 CIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara

Powe

05000220

50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara

Moha

05000410

AUTH.NAME

AUTHOR AFFILIATION

WENZINGER,E.C.

Region

1, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

BURKHARDT,L.

Niagara

Mohawk Power Corp.

SUBJECT:

Forwards

Insp Repts

50-220/88-20

& 50-410/88-20

on 881118-

890106.Concerns

noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR I

ENCL

/

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

R

RECIPIENT

ZD. CODE/NAME

PD1-1

PD

BENEDICT,R

COPIES

LTTR ENCL

1

1

1

1

RECIPIENT

ZD CODE/NAME

HAUGHEY,M

COPIES

LTTR ENCL

1

1

D

INTERNAL: ACRS

2

.

2

AEOD/DEIIB'

1

NRR SHANKMAN,S

1

1

NRR/DLPQ/PEB ll

1

1

NRR/DOEA DZR ll

1

1

NRR/DREP/RPB

10

2

2

NRR/PMAS/ILRB12

1

1

'MAR

1

1

REG FI

E

-2

1

1

AEOD

DEDRO

NRR/DEST DIR

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRZS DIR 9A

NUDOCS-ABSTRACT

OGC/HDSl

RGN1

FILE

01

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

EXTERNAL: LPDR

NSIC

1

1

1

1

NRC

PDR

1

1

R

S

NOTE 'IO ALL i RZDSii meZrrvmS.

PLEASE HELP US 'IO REDOCB $%gTSt

CGPrACr THE DOCUMEKZ CONrRDL DESK

RXN Pl-37

(EXT. 20079)

KO EIJÃQ%TS RRR MQ93 HKH DISTRIBUTXCW

LISTS MR IXXXRKHIS YOU DCwiT NEEDf

4

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

26

Docket No. 50-220

Docket No. 50-410

g5 JAN 1%8

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President

Nuclear

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

Inspection

Report

No. 50-220/88-20

and 50-410/88-20

This letter transmits

the results of the routine inspection

conducted

by

Messrs.

W. Cook,

R. Laura,

R.

Temps

and others of this office on November

18,

1988 through January

6,

1989 at Nine Mile Point Units

1 and 2, Scriba,

New

York.

A summary of the findings was presented

to Mr.

R. Abbott and other

members of your staff at the conclusion of the inspection.

During this period the inspectors

noted three different errors

made during the

work release

process

in Unit 2.

Two errors were related

to the tagout

system,

and the other

was the result of maintenance

being performed

on the wrong

component.

Although individually these

events

are of minor safety

significance,

we are concerned

that they indicate

a downward trend in

performance,

specifically inattention to detail.

At the exit meeting, your

staff acknowledged

our concern

and stated corrective action

was already in

progress

to reverse this trend.

We intend to closely monitor this recent

trend in performance at Unit 2 and discuss

our observations

with you during

our routine communications.

The inspectors

also identified an unsatisfactory

condition in the Unit 2

service water bays involving uncontroled

leakage of service water spilling on

equipment

and electrical

components

in the space.

We are particularly

concerned

that this condition apparently existed for sometime without

appropriate attention or corrective action by your staff.

In addition,

as discussed

in section 7.e. of the enclosed

report,

please

respond

to this office confirming your intentions in resolving the Unit

1

vi'tal equipment

access

controls

and your tentative

schedule

for completion of

this effort.

The response

requested

by this letter is not subject to the clearance

procedures

of the Office of Management

and Budget as required

by the Paperwork

Reduction Act of- 1980,

PL No.96-511.

8qP2070218 8'~O>20

PDR

g>ClCN, o~pgU

OFFICIAL RECORD

COPY

CIR

NMP 88-20 - 0001.0.0

Niagara

Mohawk Power Corporation

We appreciate

your cooperation.

>>6 JAN 1989

Sincerely,

Edward

C. Wenzinger,

Chief

Projects

Branch

No.

2

Division of Reactor

Projects

Enclosure:

1)

NRC Region I,'ombined Inspection

Report

No. 50-220/88-20'and

50-410/88-20

cc w/encl:

Connor

& Wetterhahn

John

W. Keib Esouire

C.

Mangan,

Senior Vice President

J. Willis, General

Superintendent

K. Dahlberg,

Station Superintendent,

Unit

1

R. Abbott, Station Superintendent,

Unit 2

R. Randall, Unit

1 Superintendent

of Operations

R. Smith, Unit 2 Superintendent

of Operations

J. Perry, Director, Unit

1 Restart

Task Force

D. Palmer, Acting Manager, Quality Assurance

C.

Beckham,

Manager Nuclear Quality Assurance

Operations

W. Hansen,

Manager Corporate Quality Assurance

Troy B. Conner, Jr.,

Esquire

Director,

Power Division

Department of Public Service,

State of New York

New York State,

Department of Law

James

F. Warden,

New York Consumer Protection

Branch

'Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC,Resident

Inspector

State of New York

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encls)

J. Johnson,

Section Chief,

DRP

M. Haughey,

Licensing Project Manager,

Unit

1 and

2

State

Liaison Officer (SLO)

M. Johnson,

EDO, Regional

I Coordinator

P. Koltay, SRI,

IP3

W. Schmidt,

SRI, Fitzpatrick

RI: DRP

Cook

186/89

RI: DRP

Johnson

W

zinger

1+~89

14.~/89

OFFICIAL RECORD

COPY

CIR

NMP 88"20 - 0002.0. 0

11/29/80