See also: IR 05000220/1988020
Text
gt
ACCKLKRATED
DISTKBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
~
~
~
~
ESSION NBR:8903G70218
DOC.DATE: 89/01/26
NOTARIZED:
NO
DOCKET ¹
1 CIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara
Powe
05000220
50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara
Moha
05000410
AUTH.NAME
AUTHOR AFFILIATION
WENZINGER,E.C.
Region
1, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
BURKHARDT,L.
Niagara
Mohawk Power Corp.
SUBJECT:
Forwards
Insp Repts
50-220/88-20
& 50-410/88-20
on 881118-
890106.Concerns
noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR I
ENCL
/
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
R
RECIPIENT
ZD. CODE/NAME
PD1-1
BENEDICT,R
COPIES
LTTR ENCL
1
1
1
1
RECIPIENT
ZD CODE/NAME
HAUGHEY,M
COPIES
LTTR ENCL
1
1
D
INTERNAL: ACRS
2
.
2
AEOD/DEIIB'
1
NRR SHANKMAN,S
1
1
NRR/DLPQ/PEB ll
1
1
NRR/DOEA DZR ll
1
1
NRR/DREP/RPB
10
2
2
NRR/PMAS/ILRB12
1
1
'MAR
1
1
REG FI
E
-2
1
1
DEDRO
NRR/DEST DIR
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRZS DIR 9A
NUDOCS-ABSTRACT
OGC/HDSl
RGN1
FILE
01
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
EXTERNAL: LPDR
1
1
1
1
NRC
1
1
R
S
NOTE 'IO ALL i RZDSii meZrrvmS.
PLEASE HELP US 'IO REDOCB $%gTSt
CGPrACr THE DOCUMEKZ CONrRDL DESK
RXN Pl-37
(EXT. 20079)
KO EIJÃQ%TS RRR MQ93 HKH DISTRIBUTXCW
LISTS MR IXXXRKHIS YOU DCwiT NEEDf
4
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
26
ENCL
26
Docket No. 50-220
Docket No. 50-410
g5 JAN 1%8
Niagara
Mohawk Power Corporation
ATTN:
Mr. Lawrence Burkhardt, III
Executive Vice President
Nuclear
301 Plainfield Road
Syracuse,
13212
Gentlemen:
Subject:
Inspection
Report
No. 50-220/88-20
and 50-410/88-20
This letter transmits
the results of the routine inspection
conducted
by
Messrs.
W. Cook,
R. Laura,
R.
Temps
and others of this office on November
18,
1988 through January
6,
1989 at Nine Mile Point Units
1 and 2, Scriba,
New
York.
A summary of the findings was presented
to Mr.
R. Abbott and other
members of your staff at the conclusion of the inspection.
During this period the inspectors
noted three different errors
made during the
work release
process
in Unit 2.
Two errors were related
to the tagout
system,
and the other
was the result of maintenance
being performed
on the wrong
component.
Although individually these
events
are of minor safety
significance,
we are concerned
that they indicate
a downward trend in
performance,
specifically inattention to detail.
At the exit meeting, your
staff acknowledged
our concern
and stated corrective action
was already in
progress
to reverse this trend.
We intend to closely monitor this recent
trend in performance at Unit 2 and discuss
our observations
with you during
our routine communications.
The inspectors
also identified an unsatisfactory
condition in the Unit 2
service water bays involving uncontroled
leakage of service water spilling on
equipment
and electrical
components
in the space.
We are particularly
concerned
that this condition apparently existed for sometime without
appropriate attention or corrective action by your staff.
In addition,
as discussed
in section 7.e. of the enclosed
report,
please
respond
to this office confirming your intentions in resolving the Unit
1
vi'tal equipment
access
controls
and your tentative
schedule
for completion of
this effort.
The response
requested
by this letter is not subject to the clearance
procedures
of the Office of Management
and Budget as required
by the Paperwork
Reduction Act of- 1980,
PL No.96-511.
8qP2070218 8'~O>20
g>ClCN, o~pgU
OFFICIAL RECORD
COPY
CIR
NMP 88-20 - 0001.0.0
Niagara
Mohawk Power Corporation
We appreciate
your cooperation.
>>6 JAN 1989
Sincerely,
Edward
C. Wenzinger,
Chief
Projects
Branch
No.
2
Division of Reactor
Projects
Enclosure:
1)
NRC Region I,'ombined Inspection
Report
No. 50-220/88-20'and
50-410/88-20
cc w/encl:
Connor
& Wetterhahn
John
W. Keib Esouire
C.
Mangan,
Senior Vice President
J. Willis, General
Superintendent
K. Dahlberg,
Station Superintendent,
Unit
1
R. Abbott, Station Superintendent,
Unit 2
R. Randall, Unit
1 Superintendent
of Operations
R. Smith, Unit 2 Superintendent
of Operations
J. Perry, Director, Unit
1 Restart
Task Force
D. Palmer, Acting Manager, Quality Assurance
C.
Beckham,
Manager Nuclear Quality Assurance
Operations
W. Hansen,
Manager Corporate Quality Assurance
Troy B. Conner, Jr.,
Esquire
Director,
Power Division
Department of Public Service,
State of New York
New York State,
Department of Law
James
F. Warden,
New York Consumer Protection
Branch
'Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC,Resident
Inspector
State of New York
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encls)
J. Johnson,
Section Chief,
M. Haughey,
Licensing Project Manager,
Unit
1 and
2
State
Liaison Officer (SLO)
M. Johnson,
EDO, Regional
I Coordinator
P. Koltay, SRI,
IP3
W. Schmidt,
SRI, Fitzpatrick
RI: DRP
Cook
186/89
RI: DRP
Johnson
W
zinger
1+~89
14.~/89
OFFICIAL RECORD
COPY
CIR
NMP 88"20 - 0002.0. 0
11/29/80