Notice of Partial Denial of Amends to License DPR-63 & Opportunity for Hearing.Rev of Tech Spec Figure 3.1.2b, Min Allowable Solution Temp to Extend Curve to Lower Temps to Define Weight % in Solutions as Low as 30 F Unacceptable
ML17055E308
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/31/1988
From: Haughey M
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17055E305 List:
References
NUDOCS 8811090457
Download: ML17055E308 (8)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION NIAGARA MOHAWK POWER CORPORATION DOCKET NO. 50-220 PARTIAL DENIAL OF AMENDMENTS TO FACILITY OPERATING LICENSES AND OPPORTUNITY FOR HEARING The U.S. Nuclear Regulatory Commission (the Commission) has denied a

portion of a request by the licensee for an amendment to Facility Operating License No.

DPR-63 issued to Niagara Mohawk Power Corporation for operation of the Nine Mile Point Nuclear Station Unit No.

1 (the facility), located in Oswego County, New York.

The denied portion of the proposed amendment would have revised Figure 3.1.2b, "Minimum Allowable Solution Temperature" in the Technical Specifications.

The revised curve would have extended the curve to lower temperatures (from 40'F to 30'F) to define the weight percent sodium pentaborate in solution at temperatures as low as 30'F.

Notice of consideration of issuance of the amendments was published in the FEDERAL REGISTER on June 1,

1988 (53 FR 20044).

The licensee's application for amendment was dated March 7, 1988, as supplemented April 13, 1988.

During the review, the staff determined that the revised curve for Fi.gure

3. 1.2b had been shifted in the non-conservative direction as well as extended.

This was discussed with the licensee's staff who stated that the shift was made in error.

The licensee further stated that the revised curve SS11090457 SS1031 PDR ADOCK 05000220 P

PDC 4

was independent of the other changes requested in the amendment and was not necessary for operation with the other proposed changes for the Liquid Poison System.

The staff determined that operation with the revised curve was not acceptable but that operation with the existing Figure 3.1.2b with the other changes in the amendment request was acceptable.

By December 7, 1988, the licensee may demand a hearing with respect to the denial described above and any person whose interest may be affected by this proceeding may file a written petition for leave to intervene.

A request for a hearing or petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, D.C.

20555, Attention:

Docketing and Service Branch, or may be delivered to the Commission's Public Document

Room, 2120 L Street, N.W.,

Washington, D.C., by the above date.

A copy of any petitionq should also be sent to the Office of the General

Counsel, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555, and to Mr. Troy B. Conner, Jr., Esq.,

Conner 5 Wetterhahn, Suite 1050, 1747 Pennsylvania

Avenue, N.W. Washington, D.C. 20006, attorney for the licensee.

For further details with respect to this action, see (1) the application for amendment dated March 7,

1988, as amended April 13,
1988, and (2) the Commission's letter to Niagara Mohawk Power Corporation dated October 31, 1988, which are available for public inspection at the Commission's Public Document
Room, 2120 L Street, N.W., Washington, D.C., and at the Reference and Document

gl

'4 Department, Penfield Library, State University of New York, Oswego, New York 13126.

A copy of item (2) may be obtained upon request addressed to the U.S.

Nuclear Regulatory commission, Washington, D.C. 20555, Attention:

Director, Division of Reactor Projects I/II.

Dated at Rockvi lie, Maryland, this 31 day of October 1988.

FOR THE NUCLEAR REGULATORY COMMISSION Mary F. Haughey, Project Manager Project Directorate I-1 Division of Reactor Projects, I/II

  • SEE PREVIOUS CONCURRENCE PDI-1
  • LA:CVogan 10/20/88 PDI-1
  • PM MHaughey:dig 10/21/88 OGC
  • MYoung 10/24/88

,~

. PDI-1

  • PM:RCapra 10/27/88

Dated at Rockvi11e, Mary1and, this 31

~day of o~eob~~l988.

FOR THE NUCLEAR REGULATORY COMMISSION Mary F. Haughey, Project Manager Project Directorate I-1 Division of Reactor Projects, I/II PDI-1 LA:CVogan 10/p0/88 PDI-PM:MHaughey:dig 10/A/ /88 oat@/~