Forwards Insp Repts 50-220/88-18 & 50-410/88-18 on 880825- 1003 & Notice of Violation
ML17055E297
Person / Time
Site: Nine Mile Point  
Issue date: 10/27/1988
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mangan C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055E298 List:
References
NUDOCS 8811090153
Download: ML17055E297 (6)


See also: IR 05000220/1988018

Text

J

gC CP~RAYED

3387RIBUTION

DKMONSTRA,'EON

-

SYSTEM

t

i~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8811090153

DOC.DATE: 88/10/27

NOTARIZED: NO

FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara

Powe

50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara

Moha

AUTH.NAME

AUTHOR AFFILIATION

WENZINGER,"E.C.

Region

1, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

MANGAN,C.V.

Niagara

Mohawk Power Corp.

SUBJECT:

Forwards Insp Repts 50-220/88-18

& 50-410/88-18

on

880825-1003

6 notice of violation.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET

05000220

05000410

RECIPIENT

ID CODE/NAME

PD1-1

PD

BENEDICT,R

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB

11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE L

ERMAN,J

ILE

02

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

l.

1

2

2

1

1

1

1

1

1

2

2

1

1

1 '

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

HAUGHEY,M

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS1

RGN1

FILE

01

NRC PDR

RESL MARTIN,D

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

I

D

NVZE IO ALL "RIDS" RECIPIENIS:

h

D

D

PLEASE HELP US 'ZO REDUCE HASTE!

CXRKACT 'lHE DOCUMEFZ CONTROL DESK

RCjOM Pl-37

(EXT. 20079)

1Q ELOCUTE KÃlR NAME FROM DISTRXM7ZIGN

LISTS H)R DOClIMEÃIS YOU DON'T NEED)

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

p

0

Docket No. 50-220

Docket No. 50-410

27 OCT 1888

Niagara

Mohawk Power Corporation

ATTN:

Mr. Charles

V. Mangan

Senior Vice President - Nuclear

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

Inspection

Report

No. 50-220/88-18

and 50-410/88-18

This letter transmits

the results of the routine inspection

conducted

by

Mr. W. Cook,

and others of this office on August 25 through October 3,

1988 at

Nine Mile Point, Units

1 and 2, Scriba,

New York.

A summary of the findings was

presented

to Mr. J . Willis and other

members of your staff at the conclusion of

the inspection.

Based

upon the inspectors'eview,

two activities at Unit 2 were not conducted

in compliance with your own procedures

and

NRC regulations.

One violation

involves failure to follow a station surveillance

procedure

and

a second

violation involves the failure to take prompt and effective corrective action

for an identified deficiency involving an inaccurate list of snubbers.-

The',

failure to -follow the surveillance

procedure,

the

second

example in rec'ent".,',- -'-

months, points to

a need

by your staff to place

more emphasis

on procedural

compliance

and supervisory oversight of ongoing testing.

The failure to take

timely corrective action

has

been

a problem previously addressed

with you and

your staff and is of particular concern to us.

In addition,

although not

included in the Notice of Violation, inspector

review of post accident

sampling

system capability found your actions to be inadequate

(see

folio'wup to Item

No. 410/87-22-10).

These violations have

been categorized

by severity level according to

10 CFR Part 2, Appendix

C (Enforcement Policy).

You are required to respond to these

violations and in preparing your response

you should follow the instructions

in Appendix A.

The response

required

by this letter is not subject to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

PL 96-511.

-:1 1090153

g"-l1 0~7

PDR

ADOCK 05000220

PDC

OFFICIAL RECORD

COPY

CIR

NMP 88"18

0001.0.0

-

Niagara

Mohawk Power Corporation

27 OCT

1SBB

We appreciate

your cooperation

in these matters.

Sincerely,

Edward

C. Wenzinger,

Chief

Projects

Branch

No.

2

Division of Reactor Projects

Enclosures:

l. Appendix A, Notice of Violation

2.

NRC Region I, Combined Inspection

Report

No. 50-220/88-18

and 50-410/88-18

cc w/encls:

Connor

8 Wetterhahn

John

W. Keib, Esquire

T. Perkins,

Vice President,

Nuclear Generation

J. Willis, Station Superintendent

K. Dahlberg, Unit

1 Superintendent

R. Abbott, Unit 2 Superintendent

R. Randall, Unit

1 Superintendent

of Operations

R. Smith, Unit 2 Superintendent

of Operations

Vice President,

Quality Assurance

C.

Beckham,

Manager Nuclear Quality Assurance

Operations

W. Hansen,

Manager Corporate Quality Assurance

Troy B. Conner, Jr.,

Esquire

Director,

Power Division

Department of Public Service,

State of New York

New York State,

Department of Law

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encls:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encls)

J.

Johnson,

Section Chief,

DRP

M. Haughey,

Licensing Project Manager,

Unit

1 and

2

State

Liaison Officer (SLO)

B. Clayton,

EDO,

Region I Coordinator

P. Koltay, SRI,

IP3

f

A. Luptak, SRI, FitzPatrick

RI:DRP

Banerjee/rhl

10/~'88

r

RI

RI

DRP

Johnson

.f We zinger

10/Rl /88

10/ .I88

OFFICIAL RECORD

COPV

CIR NMP 88-18 - 0001.1.0

10/21/88