4 ~
Docket.Nos:
50-220 and 50-410
SUBJECT:
SUMMARY
OF MEETING WITH NIAGARA MOHAWK POWER CORPORATION ON AUGUST 30, 1988 TO DISCUSS THE STATUS OF LICENSING ISSUES FOR NINE NILE POINT, UNITS 1
AND 2 Distribution PDI-1 Rdg NHaughey LICENSEE:
Niagara Mohawk Power Corporation (NMPC)
ACRS (10)
HBClayton FACILITIES:
Nine Mile Point Nuclear Station, Units 1 and 2 BGrimes NRC Local PDR RCapra OGC-Rockville RBenedict EJordan
- JJohnson, RI RBenedict HSchmidt The NRC staff met with representatives of Niagara Mohawk Power Corporation (the licensee) on August 30, 1988 to discuss licensing issues for Nine Mile Point, Units 1 and 2 (NNP-1 and NNP-2).
Enclosure 1 contains a list of meeting participants and observers.
Enclosure 2 is a list of the open licensing items discussed during the meeting.
The items on this list that are required to be resolved before restart of Unit 1 are indicated by a single asterisk in the title.
The items that are desirable (for operating convenience) to be resolved before restart are indicated by a double asterisk in the title.
n Other iss'oes that were discussed during the meeting were:
FSAR Update for Unit 2:
The update which is due October 31 is running behind schedule.
The licensee is considering submitting a
request for a schedular exemption request.
They were requested to submit it as soon as possible if it is to be submitted.
Unit 2 Refueling Outage:
The licensee was requested to meet with the NRC six months before the start of the first refueling outage to discuss actions required for restart after the outage.
The licensee should be prepared to submit these requests with the exception of the reload analysis shortly after the meeting.
The reload analysis is to be submitted three months before the outage.
Generic Letter 88-13 Generic Letter 88-14 This item required a response by September 1, 1988.
The licensee did not receive it until August 22, 1988.
The licensee is trying to meet the required date.
The licensee is reviewing this letter to develop an action plan.
Enclosures:
As stated cc w/enclosures:
S next page PDI-1:
A PDI-1:
PDI-1.
CVo an NHaughey:vr Capra 9/
/88 9/7 /88 9/ g /8 SS09'12015S SS0907 P13R AOOCK 05000220 P
PDC Mary F. Haughey, Project Manager Project Directorate I-1 Division of Reactor Projects I/II
L
Mr. C.'.
Mangan Niagara, Mohawk Power Corporation Nine Mile Point Nuclear Station, Unit No.
1 CC:
Mr. Troy B. Conner, Jr., Esquire Conner
& Wetterhahn Suite 1050 1747 Pennsylvania
- Avenue, N.
W.
Washington, D.
C.
20006 Mr. Frank R. Church, Supervisor Town of Scriba R.
D. g2
- Oswego, New York 13126 Mr. James L. Willis General Supt.-Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 126
- Lycoming, New York 13093 Mr. Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Ms.
Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor
- Albany, New York 12223 Kim Dahlberg Unit 1 Station Superintendent Nine Mile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093 Mr. Peter E. Francisco, Licensing Niagara Mohawk Power Corporation 301 Plainfield Road
- Syracuse, New York 13212 Charlie Donaldson, Esquire Assistant Attornye General New York Department of Law 120 Broadway New York, New York 10271
ENCLOSURE 1
MEETING WITH NIAGARA MOHAWK POWER CORPORATION TO DISCUSS OPEN LICENSING ISSUES FOR NINE MILE POINT UNITS 1
AND 2 August 30, 1988 Partici ants Mary Haughey Wayne Schmidt Robert A. Capra S.
W. Wilczek, Jr.
Peter Francisco Robert A. Benedict NRC NRC NRC Niagara Mohawk Power Corporation Niagara Mohawk Power Corporation NRC Observers Kim Arn Marybeth Farrell Jean Kessner Search Licensing States News Service WIXT
I'
ENCLOSURE 2
>aoe No.
08/30/88 TAC TITLE OPEN LICENSING ITEMS FQR NINE MILE POINT UNITS 1
AND 2 r
DATE OPEN I TENS FOR UNIT 0
'4APRN ROD BLOCK
/
/
0 TS ANEND-PRIMARY CONT ISOL VALVES 02/11/82 0 MPA'-97, GL 88-01 IGSCC 07/28/88 0 REFUELING INTERLOCK BYPASS 05/07/87 0 SPENT FUEL RACK, US TOOL 8c DIE
/
/
52857 ITEM 2.1 (GL 8>-28) 5~692 ITEM 2.2 (GL 83-28) 54002 ITM 4.5 '
- 8. 4.5 '
GL8Z-28 541 52
'4APPEND I X J REVIEW 59116 10 CFR 50.62 AlWS RULE 60450 IST 2ND 10YR 60451 ISI 2ND 10YR 61450 RETYPED TS 61715 VENTS( PURGE VALVE DET.
62288 TS AMFND,BEYOND END/CYCLE 62863 TS NCAD SYS.
65018 APP.
J FW CHECK VALVES 65648 SCH.
SEISMIC VER PRQGRAN 66000 CHANGES TO ODCN 66750
'4SDV ORDER 07/Oi/83 11/01/84 11/01/84 03/03/77 06/28/88 12/ii/85 12/11/85 05/12/86 05/ZO/84 08/21/86 09/24/86 02/17/87 02/01/87 03/02/87 01/ZO/81 67175 TS AMEND-RQD WORTH MINIMIZER 01/14/88
".7506 50. 62 ATWS ( LIOUI D PQ ISON )
6/691 NRC B 88-01 W CIRC ~
BREAKER
.'~",'~6 )lEXEMP.
APP J, ENER COND RETRN I
VALVE 03/07/88 03/31/88 06/23/88
Page No.
08/30/88 OPEN LICENSING ITEMS FOR NINE MILE POINT UNITS 1 AND 2 TAC TITLE DATE 68570 STATION BLACKOUT RULE 68701 4BELTLINE MTL SURV CAP 68722 NISI, 1ST 10YR 68794 NONCONF PIPING MAT,B 88-5 68883 FIRE HAZARDS ANALYSIS 69095 PLANT LIFE EXTENSION 69201 TS AMEND-REMOVE ORG CHART 69202 TS AMEND-FWAMSIV SURV REQ 69203 TS AMEND-MIN CREW COMP 69204 TS AMEND-RCS ISO VALVE CL 69205 TS AMEND-SUPPR CHMBER WATER LEVEL
/ /
06/ib/88 06/16/88
/ /
06/01/88 07/27/88 06/03/88
. 08/1'9/88 03/28/88 08/25/87 06/20/88 69206 EOPs 69207 SPDS 69208 DCRDR 69209 R.G.
1.97 69210 (DUPLICATE TAC) 69211%ITS BASES CHANGE-FUEL LOAD PROC.
69212 FIRE BRIGADE QUALIFICATIONS 04/19/86 10/21/86 01/30/87 10/05/87 05/04/88 03/16/88 11/03/86 69213 SURVEILLANCE OF SFP NEU POISON 01/08/88 NATL 69214 HEAVY LOADS (REDEFINED) 69215 TS AMEND-SURV. APRM SCRAM ROD BLK 07/09/87 05/04/88 69216 TS AMEND-APRM/ROD BLK FLO 03/03/87 BIASED CV 69217 REACTOR BLDG CRACK MONITORING 01/25/88
"Page No.
08/30/88 OPEN LICENSING ITEMS FOR NINE MILE POINT UNITS 1
AND 2 TAC TITLE DATE OPEN ITEMS FOR UNIT 2 0
MPA B-97, GL 88-01, IGSCC 63284 GL 83-28 63426 DETAILED CONTROL ROOM DESIGN REVIEW 07/28/88 04/15/86 10/31/86 634 -8 SPDS 63429 IST 63430 TURBINE SYSTEM MAINTENANCE PROGRAM 12/01/82 10/31/86 10/31/86 65543 RPS (PGCC)
CLASS IE REVIEW 05/18/87 65850 CONTAINMENT DELTA T (DRAWDOWN 07/27/87 T IME )
66070 PRESERVICE INSPECTION PLAN 66071 ISI 66181 RPS LOGIC CONCERNS 66387 PGP/DRYWELL SPRAY 67458 INTERIM STARTUP REPORT 67459 SPENT FUEL RACKS 67460 REV TO STARTUP TEST PROGRAM 67751 SEMIANN RAD EFFLUENT RELEASE REPORT 07/29/87 07/30/87 09/17/87 10/31/86 02/23/88 10/27/87 02/26/88 03/01/88 68152 ANNUAL RAD REPORT 68154 TS AMEND-DG AIR START RECEIVERS 68156 CHANGES TQ FW MANUAL FLOW STEPS 68403 TS AMEND-RFMOVE QRG CHARTS 68463 TS AMEND- 'C 5.0 8 4.0 68571 STATIQN B!.. i;!'.";"i:
BOULE 04/28/88 04/21/88 I
04/14/88 06/06/88 06/14/88 06/21/88
Page No.
08/30'/88 OPEN LICENSING ITEMS FOR NINE MILE POINT UNITS 1 AND 2 TAC TITLE DATE 68795 NONCONF PIPING MATLS-BUL 88-05 07/18/88 69094 TS AMEND-CST LEVEL TRAN
( HPCS/RC IC )
08/03/88 Subtotal 444 Total
Notes of Discussion On 0 en Issues ENCLOSURE 3 1.
Open Issues for Unit 1
TAC ISSUE COMMENTS 53692 ITEM 2.2 (GL 83-28) 54152 Appendix J Review 68722 5
ISI, 1st 10yr and 60451 ISI, 2nd 10yr
Response
to request for additional information (RAI) expected 9/30/88.
NMPC needs to know if additional exemptions are necessary.
NMPC proposed submitting relief requests for both the first and the 2nd.10yr ISI program within 12 months after restart of Unit 1.
NRC stated further discussion would be needed on this proposal.
61450 Retyped Technical Specification NRC and NMPC agreed this was a low priority issue.
Updating will be necessary before beginning work on this issue again.
62288 TS Amend, Beyond End/Cycle 65018 Appendix J
-FW Check Valves Will not be needed until the end of the next cycle.
These valves have been replaced.
NMPC will submit a letter to with-draw.
65648 SCH.
SEISMIC Verification Program NMP-1 is the lead plant; schedule to be submitted 9/30/88.
66750 SDV Order 68794
'Nonconforming Piping Material 68883 Fire Hazards Analsis NMPC to submit TS by end of year.
NMPC to submit response by 9/88.
A TS amendment will be submitted to remove Fire Protection issues from the TS.
The amendment will reference this document.
0 I
Notes of Discussion On 0 en Issues Cont'd 2.
Open Issues for Unit 2 TAG ISSUE 63429 IST 66070 Preservice Inspection Plan 66071 ISI 68463 TS AMEND-SEC 3.0 5 4.0 69094 TS AMEND-CST LEVEL TRAN COMMENTS Responses to concerns discussed in June will be submitted by the end of September.
The NRC requested that there be no more slips on this date.
Additional information to be sub-mitted by the end of August.
Response
to RAI to be submitted after mid-cycle outage in September.
Revised TS pages will be submitted by September 30, 1988.
NMPC is presently controlling this by administrative control.
~.