Forwards Comments,Clarifications & Agreements Re Implementation Re 880506 SER Concerning 10CFR50,App J.Info Submitted Per Commitment Resulting from 880609 Meeting W/ NRC.W/15 Oversize Drawings
Date released: 06/30/2017 Download: ML17055E056


Forwards Comments,Clarifications & Agreements Re Implementation Re 880506 SER Concerning 10CFR50,App J.Info Submitted Per Commitment Resulting from 880609 Meeting W/ NRC.W/15 Oversize Drawings
ML18038A410
Person / Time
Site: Nine Mile Point 
Issue date: 07/28/1988
From: Terry C
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
Download: ML18038A410 (244)
Reactor Bldg Liquid Poison System Sections 1-1,2-2,3-3,4-4 & 5-5. Rev Date Illegible
ML17055E069
Person / Time
Site: Nine Mile Point 
Issue date: 07/28/1988
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E069 (1)
Reactor Bldg Breathing Air & House Service Air.
ML17055E068
Person / Time
Site: Nine Mile Point 
Issue date: 07/28/1988
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E068 (1)
Reactor Bldg Instrument Room El 237.0 Feet Instrument Piping Section 2-2. Sheet 3
ML17055E067
Person / Time
Site: Nine Mile Point 
Issue date: 11/22/1985
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E067 (1)
Reactor Building Instrument & Metering Piping Core Spray Sys. Sheet 1 of 3
ML17055E066
Person / Time
Site: Nine Mile Point 
Issue date: 03/05/1985
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E066 (1)
Reactor Building Emergency Condenser Piping Penetration Details X-34 & X-38 10 Feet Steam Supply. Sheet 1 of 3
ML17055E065
Person / Time
Site: Nine Mile Point 
Issue date: 07/28/1988
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E065 (1)
Reactor Bldg East Instr Room El 284 FEET-0 Inches Instrumentation & Misc Piping.
ML17055E064
Person / Time
Site: Nine Mile Point 
Issue date: 07/28/1988
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E064 (1)
Reactor Bldg Drywell & Torus Continuous Leak Rate Monitoring Sys Lowering Instr RM El 237.0 Feet. Rev & Rev Date Illegible
ML17055E063
Person / Time
Site: Nine Mile Point 
Issue date: 07/28/1988
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E063 (1)
Reactor Bldg Closed LOOP Cooling Sys Piping at Reactor Recirc Pumps & Motors Section 1-1. Rev Date Illegible
ML17055E062
Person / Time
Site: Nine Mile Point 
Issue date: 07/28/1988
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E062 (1)
Reactor Building Sampling Sample Station Details, as-built
ML17055E061
Person / Time
Site: Nine Mile Point 
Issue date: 10/29/1987
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E061 (1)
Reactor Bldg Instrument Room El 237.0 Feet Instrument Piping Upper Plan & Section 4-4. Rev Date Illegible
ML17055E060
Person / Time
Site: Nine Mile Point 
Issue date: 07/28/1988
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E060 (1)
Reactor Building Drywell Penetrations Details, as-built
ML17055E059
Person / Time
Site: Nine Mile Point 
Issue date: 12/23/1986
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E059 (1)
Reactor Bldg Instrument Room El 237.0 Feet Instrument Piping Section 11-11,12-12,13-13. Sheet 6
ML17055E058
Person / Time
Site: Nine Mile Point 
Issue date: 12/04/1987
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E058 (1)
Reactor Shutdown Cooling P&I Diagram, as-built.Sheet 1 of 2
ML17055E057
Person / Time
Site: Nine Mile Point 
Issue date: 12/22/1986
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E057 (1)
14 List 800 Bolted Bonnet WE 0.5 Valve with Flexitill Bonnet Joint and Smb - Limitorque Unit. Rev & Rev Date Illegible
ML17055E055
Person / Time
Site: Nine Mile Point 
Issue date: 07/28/1988
From:
NIAGARA MOHAWK POWER CORP.
To:
References
Download: ML17055E055 (1)