Text
ACCRIZRATZD
DISIRIBUTJON
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION NBR:8806010033
DOC.DATE: 88/05/20
NOTARIZED: NO
FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara
Powe
50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara
Moha
AUTH.NAME
AUTHOR AFFILIATION
BELLAMY,R.R.
Region
1, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
MANGAN,C.V.
Niagara
Mohawk Power Corp.
DOCKET
05000220
05000410
SUBJECT:
Forwards Radiological Controls Insp Repts 50-220/88-12
&
R
50-410/88-12
on 880418-12.No violations noted.
DISTRIBUTION CODE:
IEOSD
COPIES
RECEIVED:LTR i
ENCL
I
SIZE: X
I
TITLE: Environ
& Radiological
(50 DKT)-Insp Rept/Notice of Violation Respons
NOTES:
RECIPIENT
ID CODE/NAME
PD1-1 LA
BENEDICT,R
INTERNAL: ACRS
AEOD/DSP
NMSS/SGOB
4E4
NRR/DOEA/EAB 11
NRR/DREP/RPB
10
NUDOCRJLQSTRACT
~EG
>
02
RE /DRPS
DEPY
RGN2/DRSS/EPRPB
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
0
1
1
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PD1-1
HAUGHEY,M
AEOD/DOA
NMSS/LLOB
5E4
NRR/DLPQ/PEB 11
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
OGC 15-B-18
RGN1
FILE
01
RGN4 MURRAY,B
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
'
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
A
S
h
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
27
ENCL
26
MAY+0
$ 988
Docket No. 50-220
50-410
Niagara
Mohawk Power Corporation
ATTN:
Hr.
C.
V. Mangan
Senior Vice President
301 Plainfield Road
Syracuse,
13212
Gentlemen:
Subject:
Combined Inspection
Report Nos. 50-220/88-12;
50-410/88-12
A routine radiological controls inspection
was conducted
at Nine Hile Point
Units
1 and
2 by Messrs.
R. Nimitz and
R.
Loesch
on April 18-22,
1988.
The
findings of the inspection
were discussed
with Hr. J. Willis.
The inspection
covered previous findings,
ALARA, and external
exposure controls.
No violations were identified and
no response
to this letter is required.
Your cooperation with us is appreciated.
Sincerely,
O,.,<,al ~!f;ned By:
F,"-'nald R. Bellarny
Ronald
R. Bellamy, Chief
Facilities Radiological
Safety
and Safeguards
Branch
Enclosure:
Combined Inspection
Report
Nos. 50-220/88-12;
50-410/88-12
cc
w encl:
T.
E.
Lempges,
Vice President,
Nuclear Generation
J.
A. Perry, Vice President,
guality Assurance
T. Perkins,
Vice President,
Nuclear Generation
W. Hansen,
Manager
Corporate guality Assurance
T.
Roman, Unit
1 Station Superintendent
R. Randall, Unit
1 Superintendent,
Operations
C.
Beckham,
Manager Nuclear guality Assurance
Operations
W. Drews, Technical
Superintendent
J. Willis, General
Superintendent,
Nuclear Generation
C. Terry, Vice President
Nuclear Engineering
and Licensing
Troy B. Conner, Jr.
Esquire
John
W. Keib, Esquire
Director,
Power Division
Public Document
Room
(PDR)
Local Public Document
Room
(LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
8806010033- 880520
ADOCK 05000220
9
Niagara
Mohawk Power Corporation
A)AY.Q,5
$98g
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
DRP Section Chief
Robert J.
DRSS
RI:DRSS
Loesch
QNL-
5/I(0/88
RI:DRSS
Nimitz
5/i</88
Rid
RI:DRSS
Shanba
5/gg88
/7
RI:DRSS
Bellamy
5/////88