ML17055D810

From kanterella
Jump to navigation Jump to search

Forwards Amend 97 to License DPR-63 & Safety Evaluation. Amend Revises Portions of Tech Specs 2.1.1 & 3.1.7 to Reflect New Methodology in Establishing MAPLHGR & to Reflect Max Total Peaking Factor & MAPLHGR Limits for New Fuel Type
ML17055D810
Person / Time
Site: Nine Mile Point 
Issue date: 04/19/1988
From: Benedict R
Office of Nuclear Reactor Regulation
To: Mangan C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055D811 List:
References
TAC-66552, TAC-66968, NUDOCS 8805040039
Download: ML17055D810 (6)


Text

April 19, 1988 Docket No: 50-220 Nr. C. V. Mangan Senior Vice President Niagara Mohawk Power Corporation

'301 Plainfield Road

Syracuse, New York 13212

Dear Mr. Mangan:

DISTRIBUTION(

NRCPDR Local PDR PDI-1 Rdg.

CVogan RBenedict OGC SVarga BBoger JJohnson,RI EJordan JPartlow Wanda Jones DHagan ACRS(10)

TBarnhart(4)

GPA/PA ARN/LFMB EButcher THuang The Commission has issued the enclosed Amendment No.

9> to Facility Operating License No.

DPR-63 for the Nine Mile Point Nuclear Station Unit 1 (NMP-1).

The amendment consists of changes to,the Technical Specifications in response to your applications transmitted by letters dated August 21, September 14, December 17, and December 18, 1987; and as supplemented March 9, 1988 (TACS 66552 and 66968).

This amendment revises portions of Technical Specifications 2.1.1 and 3.1.7 and their Bases to reflect new methodology in establishing Maximum Average Planar Linear Heat Generation Rates (MAPLHGR); to reflect the Maximum Total Peaking Factor and MAPLHGR limits for a new fuel type; and to change exposure-dependent Minimum Critical Power Ratio (NCPR) limits to one limit that is applicable to the entire'ycle.

A copy of the related Safety Evaluation is enclosed.

A Notice of Issuance will be included in the Commission's next regular bi-weekly Federal

~Re ister notice.

Sincerely,

Enclosures:

1.

Amendment No.

97 to DPR-63 2.

Safety Evaluation cc: w/enclosures See next page Robert A. Benedict, Project Manager Project Directorate I-1 Division of Reactor Projects, I/II PDI-1 CVogan*

3/23/88 23 88

  • SEE PREVIOUS CO CURRENCE t

DI-1 RBenedict*:mak OGC NYoung*

3/25/88 PD!-1 RCapra Q/)9 /88

I., *

~i h

Il

(

a I (

SK

Docket No. 50-220 Mr. C. V. Mangan Senior Vice President Niagara Mohawk Power Corporation 301 Plainfield Road

Syracuse, New York 13212

Dear Mr. Mangan:

DISTRIBUTION Doc et Fs e

NRCPDR Local PDR PDI-1 Rdg.

CVogan RBenedict OGC SVarga BBoger JJohnson,RI EJordan JPartlow Manda Jones DHagan ACRS(10)

TBarnhart(4)

GPA/PA ARM/LFMB EButcher THuang The Commission has issued the enclosed Amendment No.

to Facility Operating License No.

DPR-63 for the Nine Mile Point Nuclear Station Unit 1 (NMP-1).

The amendment consists of changes to the Technical Specifications in response to your applications transmitted by letters dated August 21, September 14, December 17 and December 18,

1987, and March 9, 1988 (TACS 66552 and 66968).

This amendment revises portions of Technical Specifications

2. 1. 1 and 3. 1.7 and their Bases to reflect new methodology in establishing Maximum Average Planar Linear Heat Generation Rates (MAPLHGR); to reflect the Maximum Total Peaking Factor and MAPLHGR limits for a new fuel type; and to change exposure-dependent Minimum Critical Power Ratio (MCPR) limits to one limit that is applicable to the entire cycle.

A copy of the related Safety Evaluation is enclosed.

A Notice of Issuance will be included in the Commission's next regular bi-weekly Federal

~Re ister notice.

Sincerely, Robert A. Benedict, Project Manager Project Directorate I-1 Division of Reactor Projects, I/II

Enclosures:

1.

Amendment No.

to DPR-63 2.

Safety Evaluation cc: w/enclosures See next page Pk, POI-1 Cuogan 3/g'II/88 DI-1 RBenedict:mak 3/Z&/88 PDI-1 RCapra 3/

/88

>l

~"

E

Hr. C. V. Hangan Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station, Unit No.

1 CC:

Troy R. Conner, Jr., Esquire Conrer 5 Wetterhahn Suite 1050 1747 Pennsylvania

Avenue, N.

W.

Washington, D. C.

20006 Frank R. Church, Supervisor Town of Scriba R.

D.

F.2

Oswego, New York 13126 Mr. Thomas Perkins General Supt.-Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Post Office Box 32
Lycoming, New York 13093 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 126
Lycoming, New York 13093 Hr. Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Regional Administrator, Region I U. S. Nuclear Regulatory Comoission 475 Allendale Road King of Prussia, Pennsylvania 19406 Hs.

Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor

Albany, New York 12223 Hr. Thomas W.

Roman Unit 1 Station Superintendent Nine Mile Point Nuclear Station Post Office Box 3P

Lycoming, New York 13093

s ~