ML17055D802
| ML17055D802 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/21/1988 |
| From: | Russell W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Donlon W NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17055D803 | List: |
| References | |
| NUDOCS 8805030125 | |
| Download: ML17055D802 (8) | |
See also: IR 05000220/1986099
Text
'ACCEIZRATZD
. DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8805030125
DOC.DATE: 88/04/21
NOTARIZED: NO
DOCKET
FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara
Powe
05000220
50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara
Moha
05000410
AUTH.NAME
AUTHOR AFFILIATION
RUSSELL,W.T.
Region 1, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
DONLON,W.
Niagara
Mohawk Power Corp.
SUBJECT:
Forwards
SALP Repts 50-220/86-99
& 50-410/87-99 for
Nov 1986
Feb 1988.
+/W
DISTRIBUTION CODE:
IE40D
COPIES
RECEIVED: LTR
i
ENCL
L
SIZE:
TITLE: Systematic
Assessment
of Licensee
Performance
(SALP) Report
NOTES
RECIPIENT
ID CODE/NAME
PD1-1
LA
BENEDICT,R
INTERNAL: ACRS
AEOD/DOA
COMMISSION
NRR MORISSEAU,D
NRR/DLPQ/PEB 11
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NRR/PMAS/ILRB12
OGC 15-B-18
RGN1
FILE
01
EXTERNAL: H ST LOBBY WARD
NRC PDR
COPIES
LTTR ENCL
1
0
1
1
2
2
1
1
5
5
1
1
1,
1
1
1
1
1
1
1
'1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PD1-1
HAUGHEY,M
AEOD BAILEY,B
AEOD/DSP/TPAB
DEDRO
NRR/DLPQ/HFB 10
NRR/DOEA/EAB 11
NRR/DREP/RPB
10
NRR/DRIS/SIB 9A
OE L
BERMAN,J
02
LPDR
COPIES
LTTR ENCL
1
1
1
1
1
0
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
'
1'
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
32
ENCL
30
Docket No. 50-220
Docket No. 50-410
Niagara
Mohawk Power Corporation
ATTN:
Mr.
W. Donlon
President
301 Plainfield Road
Syracuse,
13212
Gentlemen:
Subject:
Systematic
Assessment
of Licensee
Performance
(SALP):
Report
No. 50-220/86-99
and 50-410/87-99
The
NRC SALP Board conducted
a review on March 28,
1988 to evaluate
the
performance of activities associated
with Nine Mile Point Unit
1 and 2.
The
results of this assessment
are documented
in the enclosed
SALP Board Report,
A meeting will be scheduled
to discuss this assessment.
This meeting is
intended to provide
a forum for candid discussions
relating to your
performance
during the period.
As discussed
in the current
SALP Report and the prior separate
Unit
1 and
Unit 2 SALP Reports,
Niagara
Mohawk's initiatives to. improve performance
have
met with limited success
in
some functional areas
but have not been
sustained
in others.
We believe that the examples,
cited in this report, of lack of
positive motivation and worker attitude,
and the lack of effective coordination
and cooperation
between
various station, and corporate
departments,
have
been
significant contributing factors to your inability to sustain
improved overall
performance.
At other Region I nuclear
power plants,
these
symptoms
have
been
precursors
to more serious regulatory concerns.
Your recent actions to strengthen
site management
and build teamwork are
positive steps;
however,
we remain concerned
about leadership
weaknesses
and
your staff's ability and propensity to seek out and correct technical
and
management
problems before they become regulatory concerns.
At the meeting,
you should
be prepared
to discuss
our assessment
and your
plans to address
those
areas that require
improved performance.
In
particular,
you should
be prepared to discuss
your actions relative to the
planned reorganization
and management
changes.
Any comments you may
ha've regarding
our report
may be discussed
at the
meeting.
Additionally, you may provide written comments within 30 days after
the meeting.
SS05030125
SS0421
AOOCK OS000220
9
OFFICIAL RECORD
COPY
NMP 86-99/87"99 " 0002.0.0
11/29/80
gg 4o ii
Niagara
Mohawk Power Corporation
2i RPR'(gag
We appreciate
your cooperation.
Sincerely,
Q~~l,~~ l~ls33 ~
G~
~
1 IL.
Willi.am T. Russell
Regional Administrator
Enclosure:
NRC SALP Board Report
No. 50-220/86-99
and 50-410/87-99
cc w/encl:
C.
Mangan,
Senior Vice President
J. Endries,
Executive Vice President
Connor
8 Wetterhahn
John
W. Keib, Esquire
J. Perry,
Vice President,
Quality Assurance
T. Perkins,
Vice President,
Nuclear Generation
C. Terry, Vice President
Nuclear
Engineering
and Licensing
J. Willis, General
Station Superintendent
T.
Roman, Station Superintendent,
Unit
1
R. Abbott, Station Superintendent,
Unit 2
W. Hansen,
Manager Corporate Quality Assurance
C.
Beckham Manager Nuclear Quality Assurance
Operations
Department of Public Service,
State of New York
Public Document
Room
(PDR)
Local Public Document
Room
( LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
Chairman
Zech
Commissioner
Roberts
Commissioner
Rogers
Commissioner Bernthal
Commissioner Carr
K. Abraham (PAO)(14)
OFFICIAL RECORD
COPY
NMP 86"99/87-99
0002.1.0
04/14/88
s
pe
Niagara
Mohawk Power Corporation
21
APR'i988
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (W/o encl)
DRP Section Chief
Region I SLO
W. Johnston,
Director,
DRSS
J. Allan, RI
D. Holody,
RI
Boara Members
R. Capra,
R. Benedict,
NRR,
M. Haughey,
B. Clayton,
EDO, Region I Coordinator
G. Matakas,
DRP File,
RI
, E. Kelly, DRP,
RI
H. Eichenholz
b%
RT: ORP
RI: DRP
~
~
~
W. Cook
J. Johnson
4/)$ /88
4/ 6/88
R 'D
l
R~I'A
RI:
nzinger
S.
1 1ins
ane
J.
Allan
W. Russell
4/
/88
4
/8
4/20/88
4/ '<</88
4/p) /88
0 FICIAL RECORD
COPY
NMP 86-99/87-99 - 0003.0.0
04/14/88
c