Text
ACCELERATED
DISFRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8804050068
DOC.DATE: 88/03/30
NOTARIZED: NO
DOCKET
FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara
Powe
05000220
AUTH.NAME
AUTHOR AFFILIATION
DURR,J.P.
Region 1, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
MANGAN,C.V.
Niagara
Mohawk Power Corp.
SUBJECT:
Forwards Insp Rept 50-220/88-01
on 880111-15.No violations
noted.
. '2~10
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD1-1
HAUGHEY,M
INTERNAL: AEOD
NRR MORISSEAU i D
NRR/DLPQ/QAB10A
NRR/DREP/EPB10D
NRR/DRIS DIR9A2
g J
02
RGN1
FILE
01
RNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
~
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BENEDICT,R
r
DEDRO
NRR/DLPQ/PEB11B
NRR/DOEA DIR11E
NRR/DREP/RPB10A
NRR/PMAS/ILRB12
OGC 15-B-18
RES/DRPS
DIR
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
'A
8
A
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
0
Docket No. 50-220
MAR 3
P
lgg8
'iagara
Mohawk Power Corporation
ATTN:
Mr.
C.
V. Mangan
Senior Vice President
301 Plainfield Road
Syracuse,
13212
Gentlemen:
Subject:
Inspection
Report
No. 50-220/88-01
This letter refers to the routine inspection
conducted
by Mr. Chaudhary of
this office on January
11
15,
1988 at the Niagra Mohawk Corporate
Engineering Office in Syracuse,
Mr. Chaudhary
discussed
the
results of the inspection with Mr. Mangan of your staff at the conclusion
of the inspection.
Areas
examined during this inspection
are described
in the
NRC Region I
Inspection
Report which is enclosed with this letter.
Within these
areas,
the inspection
consisted of selected
examinations of procedures
and
representative
records,
interviews with personnel,
and observations
by the
inspectors.
Within the
scope of this inspection,
no violations were observed.
No reply to this letter is required.
Your cooperation with us in this
matter is appreciated.
Sincerely,
Jacque
P. Durr, Chief
Engineering
Branch
Divisi on of Reactor
Sa fety
Enclosure:
NRC Region I Inspection
Report
No. 50-220/88-01
PQQ4.Q>00
+~OgPPQ
c
g~ PCv0330
pr>R
@DOCK
9
OFFICIAL RECORD
COPY
IR NMP1 88-01
0001.0. 0
03/22/88
Niagara
Mohawk Power
Corporation
cc w/encl:
T.
E.
Lempges,
Vice President,
Nuclear Generation
J.
A. Perry,
Vice President,
Quality Assurance
T. Perkins,
General
Superintendent,
Nuclear Generation
W. Hansen,
Manager Corporate Quality Assurance
T.
Roman, Unit
1 Station Superintendent
J. Aldrich, Unit
1 Superintendent,"
Operations
C.
Beckham,
Manager Nuclear Quality Assurance
Operations
W. Drews, Technical
Superintendent
Troy B. Conner, Jr.
Esquire
John
W. Keib, Esquire
Director,
Power Division
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
P
State of New York
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
DRP Section Chief
Robert J.
DRSS
RI:DRS
Chaudhary
3/Z~/88
~C
RI: DRS
Kapl an
RI: DRS
Winters
- DRS
Strosnider
3/
/88
3/2~/88
3/Z3/88
RI: DRS:
Durr
3/
/88
OFFICIAL RECORD
COPY
IR NMP1 88-01 - 0002.0.0
03/22/88