DOCKET ¹ 05000220 05000410
SUBJECT:
Requests util to review listed requirements for renewal of license 8c program requirements for requalification training.
Response
of hoe idividuals meet requirements requested ei th in 30 day s.
DISTRIBUTION CODE:
IE42D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Operator Licensing Examination Reports RFGULAT~RY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 880 '0140 DOC. DATE: 88/03/2c NO PRIZED:
NO FACIL: 50-220 Nine Mi le Point Nuclear Stations Unit ii Niagara Poee 50-410 Nine Mile Point Nuclear Stationi Unit 2i Niagara Moha AUTH. NAME AUTHOR AFFILIATION JOHNSTON'. V.
Region 1,
Ofc of the Director RECIP. NAME RECIPIENT AFFILIATION MANGANiC. V.
TU Electric (formerly Texas Utilities Generating Co.
)
NOTES: 21 05000410 RECIPIENT ID CODE/NAME PD1-1 PD HAUGHEYi M COPIES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME BENEDICT' COPIES LTTR ENCL 1
1 INTERNAL: AEOD/DSP/TPAB NRR/DLPG/HFBiOD EXTERNAL:
LPDR NSIC 1
1 1
1 1
1 1
1 1
1 NRR MORISSEAUe D NRR/DLPG/OLB10D RGN1 FILE 01 NRC PDR 1
1 2
2 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 13 ENCL 13
~ ~
~ ~
1
l>+
I s
N C
0 1
v
~O
%**pe UNITKDITglga NUCLEAR REQULATCRN CO~SSIQN REGION I 4'lS ALLKNDALP.ROAD KINO OF PRUSSIA, PENNSYLVANIA10400 March 22, 1988 Docket No. 50-220 50-410 Niagara Hohawk Power Corporation ATTN:
Mr. C.
V. Hangan Senior Vice President 301 Plainfield Road
- Syracuse, New York 13212 Gentlemen:
Subject:
HAINTENANCE OF OPERATOR LICENSES On Hay 26,
- 1987, an amended regulation, 10 CFR 55, concerning the licensing of reactor and senior reactor operators became effective.
The background section of the Supplemental Information, pr'ovfded with the new regulation, states that those fact ltty licensees that have made a
commitment that fs less than that required by these new rules must conform to the new rules automatically.
Prior to Hay 26,
- 1987, ft had been agreed that selected senior reactor operators who were issued licenses for Nine Mile Point Unit 2 could retain their licenses for Nine Mlle Point Unit 1 for administrative purposes.
Under the current rule a licensed operator or senior operator, must be. enrolled tn the requalification program of the facility for which he holds a license, fn order to meet the conditions of hfs/her license in accordance with 10 CFR 55.53(h).
If the conditions of the license are not met, the license may be revoked in accordance with 10 CFR 55.61(b)(3).
In addition, an applicant for renewal of a
license is required to have satisfactorily completed the requalificatlon program for the facility for which the license renewal is sought fn accordance with 10 CFR 55.57(a)(4).
During a
review of recently submitted renewal appltcatfons it was noted that those individuals, who hold or have held senior operator licenses for Nine Mfle Point Unit 1
and Unit 2, documented a significantly reduced amount of time spent in requalificatfon training for each licensed fac f 11ty.
Speci f1 cally, the Operations Superintendent for Nine Mlle Point Unit 2
had only spent one (1) week tn requalificatton training from May 1986 to December 1987.
In addition, the Technical Superintendent for Nine Mile Point 1
8 2 had completed only three (3) weeks fn requallflcatlon traintng for Unit 2, from January 1986 to December 1987 and four (4) weeks in requalificatlon training for Unit 1, from October 1985 to September 1987.
10 CFR 55.59(a)(1) requires that each licensee shall successfully complete a
requa lif1 cation program developed by the fact 1 1ty licensee that has been approved by the COIIission.
This program shall be conducted for a continuous period not to exceed 24 months in duration.
SSOSSOOi40 50002aO S80322 pDR ADOCt 0
p V
~'FICIAL RECORD COPY
~ ~
~
Nfagara'ohawk Power Corporat1on We request that you review the above mentioned requ1rements for renewal of a
- license, the program requirements for requalificat1on training, and inform us w1thfn th1rty (30) days of how the above mentioned fnd1viduals met these requirements.
The NRC wi 11 continue the license renewal process for those 1ndfviduals mentioned above based on the response to this request.
The response requested by this letter and the accompanying Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
Thank you for your cooperat1on fn this matter.
please contact me at (215)337-5080.
Sincerely, If you have any questions, William V. Johnston, Acting Director Division of Reactor Safety Region I cc w/encl:
Connor 5 Wetterhahn John W. Keib, Esquire J.
A. Perry, Vice President, qual1ty Assurance W. Hansen,
- Manager, Corporate Ouality Assurance J. Aldrich, Unit 1 Superintendent,,
Operations R.
G. Smith, Unit 2 Superintendent, Operations C. Beckham,
- Manager, Nuclear quality Assurance Operations T. J. Perkins, General Superintendent R. B. Abbott, Unit 2 Station Superintendent W.
C. Drews, Technical Super1ntendent Department of Public Service, State of New York Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York OFFICIAL RECORD COPY
~ ~
~ ~
Niagara Mohawk Power Corporation
" bcc w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief Region I SLO Robert J. Bores, DRSS RI:DRS LAXGE/slf 3/g+88 0
(OLB 3/gh/88 3/
S TON OFFICIAL RECORD COPY
~ 0