ML17055D395
| ML17055D395 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 11/19/1987 |
| From: | Johnston W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mangan C NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17055D396 | List: |
| References | |
| NUDOCS 8711250177 | |
| Download: ML17055D395 (6) | |
See also: IR 05000220/1986005
Text
CESSIOid
NBR
AC IL: 50-220
AUTH. NAME
JOHNSTON, W. V
RECIP. NAME
MANGANiC. V.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
8711250177
DOC. DATE: 87/11/19
NOTARIZED:
NO
Nine Mile Point Nuclear Stations
Unit ii Niagara
Poee
AUTHOR AFFILIATION
Region ii Ofc of the Director
R EC IP IENT AFFILIATION
Niagara
Mohawk Poeer
Corp.
DOCKET
05000220
SUBJECT:
Forwards
Equipment Qualification
Insp Rept 50-220/Sb-05
on
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR J
ENCL +
SIZE:
+ ~
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD1-1
HAUGHEYi M
COPIES
LTTR ENCL
1
1
2
2
REC IP IENT
ID CODE/NAME
BENEDICT'
COPIES
LTTR ENCL
2
2
R ES
ERNAL:
LPDR
INTERNAL:
MOR ISSEAU. D
NRR/DOEA DIR
NRR/DREP/RPB
NRR/PMAS/ILRB
OGC/HDS1
DEPY GI
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
DEDRO
NRR/DLPG/PEB
NRR/DREP/EPB
NRR/DRIS DIR
E
9
RMANiJ
G FILE
RGN
FILE
01
NRC
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
23
ENCL
23
19 887
Docket
No. 50-220
License
No.
DPR-63-
Niagara
Mohawk Power Corporation
ATTN:
Mr.
C.
V.
Mangan
Senior Vice President
301 Plainfield Road
Syracuse,
13212
Gentlemen:
Subject:
Inspection
Report
No. 50-220/86-05
This refers to the equipment qualification inspection
conducted
by
NRC on April
14
18,
1986 at Nine Mile Point, Unit 1.
The report of this inspection
(NRC
inspection report 50-220/86-05)
was sent to you on June
3,
1986.
Based
on the results of that inspection, it appears
that
one of your activities
was not conducted
in full compliance with NRC requirements,
as set forth in the
Notice of Violation, enclosed
herewith
as Appendix A.
This violation was
identified as
an unresolved
item (50-220/86-05-02)
at the time of the inspection.
However,
based
on current
NRC equipment :,ualification enforcement
guidance,
this item is upgraded
to
a violation.
This violation has
been categorized
by
severity level in accordance
with the "General
Statement of Policy and Procedure
for NRC enforcement Actions,"
10 CFR Part 2, Appendix
C (Enforcement Policy).
You are required to respond
to this letter and in preparing your response,
you
should follow the instructions
in Appendix A.
The responses
directed
by this letter and the accompanying
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget as required
by the Paperwork
Reduction Act of 1980,
PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
William V. Johnston,
Acting Director
Division of Reactor Safety
Enclosure:
Notice of Violation, Appendix A
871<>>~~
gpp0220
pgp
gQQCK 0>
pgg
6
OFFICIAL RECORD
COPY
CHEUNG11/6/87 - 0001.0.0
11/17/87
Niagara
Mohawk Power Corp.
cc w/encl:
T.
E.
Lempges,
Vice President,
Nuclear Generation
J.
A. Perry,
Vice President,
Quality Assurance
T. Perkins,
General
Superintendent,
Nuclear Generation
W. Hansen,
Manager Corporate Quality Assurance
T.
Roman, Unit
1 Station Superintendent
J. Aldrich, Unit
1 Superintendent,
Operations
C.
Beckham,
Manager Nuclear Quality Assurance
Operations
W. Drews, Technical
Superintendent
Troy B. Conner, Jr.
Esquire
John
W. Keib, Esquire
Director,
Power Division
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
C. Anderson
L. Cheung
DRP Section Chief
Robert J.
DRSS
RI:DRS
R
.
Cheung/cgl
E
h
I/I@'
7
c 0
RI:
RS
Anderson
II//1/$ 0
OFFICIAL RECORD
COPY
CHEUNG11/6/87 - 0002.0.0
11/06/87