Forwards Safety Insp Repts 50-220/87-11 & 50-410/87-25 on 870629-30 & 0706-10 & Notice of Violation.Response Should Include Action Planned Re Reactor Pressure Vessel Beltline Welds Inps
ML17055D240
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 09/11/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mangan C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055D241 List:
References
NUDOCS 8710010055
Download: ML17055D240 (6)


See also: IR 05000220/1987011

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8710010055

DOC. DATE: 87/09/11

NOTARIZED:

NO

~ j

FACIL: 50-220 Nine Mile Point Nuclear Stations

Unit is Niagara

Powe

50-410 Nine Mile Point Nuclear Stations

Unit 2s

Niagara

Moha

AUTH. NAME

'UTHOR AFFILIATION

JOHNSTONI N. V.

Region ii Office of Director

RECIP. NAME

RECIPIENT AFFILIATION

MANGANz C. V.

Niagara

Mohawk Power Corp.

SUBJECT:

Forwards

Safety

Insp Repts

50-220/87-11

0 50-410/87-25

on

87062'P-30

8c 0706-10

5 notice of violation. Response

should

include action planned

re reactor

pressure

vessel beltline

weld s inp s.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED: LTR

I

ENCLi SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES: 21

DOCKET

05000220

05000410

.

05000410

RECIPIENT

ID CODE/NAME

PD1-1

PD

HAUGHEYi M

INTERNAL:

ACRS

DEDRO

NRR/DOEA DIR

NRR/DREP/RPB

I

NRR/PMAS/ILRB

OQC/HDS1

RES

DEPY GI

EXTERNAL:

LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

2

2

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BENEDICT'

BENEDICTI B

AEOD

NRR MORISSEAUi D

NRR/DREP/EPB

NRR/DRIS DIR

0

EBg+MANe J

EG F ~

RGN1

FILE

01

NRC

PDR

COPIES

LTTR ENCL

2

2

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

'OTAL

NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

26

s

Oocket Nos.

50-220

50-410

Niagara

Mohawk Power Corporation

ATTN:

Mr. C.

V. Mangan

Senior

Vice President

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

Inspection

Report Nos.

50-220/87-11

and 50-410/87-25

This letter refers to the routine safety inspection

conducted

by Mr. H. Kerch

of this office on June

29-30 and July 6-10,

1987, at the Nine Mile Point,

Units

1 and 2.Mr. Kerch. discussed

the finding of the inspection with

Mr. C.

Beckham of your staff at the conclusion of the -inspection'.

Areas

examined during this inspection

are described

in the

NRC Region I

Inspection

Report which is enclosed with this letter.

Within these

areas,

the

inspection consisted

of selective

examinations

'of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Based

on the results of this inspection, it appears

that two of your

activities were not conducted

in full compliance with NRC requirements,

as

set forth in the Notice of Violation, enclosed

herewith

as Appendix A.

These

violations have

been categorized

by severity level in accordance

with the

General

Statement

of Policy and Procedure

for

NRC Enforcement Actions,

10 CFR Part 2, Appendix C, (Enforcement Policy 1987).

For these violations

a response

to this report is required

by 10 CFR 2.201.

Please

follow the

instructions in Appendix A in the preparation of your response.

In addition, during this inspection it was determined that

no reactor pressure

vessel beltline welds are included in the current inservice inspection

program.

Although relief from inspection

has

been previously granted

by

NRC

for each specific beltline weld,

we believe that it is appropriate for you to

review the feasibility of reactor pressure

vessel beltline inspections

in

light of the current state-of-the-art

inspection techniques.

With regard to

this issue,

we request that in your response

to the Notices of Violation

presented

in Appendix

A of the enclosed report, you inform us of what actions

you plan in this area

and their schedule for completion.

I and

my staff are

available 'to discuss this issue with you.

87i00i0055 8709ii

PDR

ADQCK 05000220

6

PDR

r

OFFICIAL RECORO

COPY

CIR

NMP 87-11/25 - 0001.0.0

09/10/87

gO

(<

f

Niagara

Mohawk Power Corporation

Your cooperation is appreciated.

Sincerely,

0riginal Signed Sy!

CliifordJ. Aaderson

William V. Johnston,

Acting Director

Division of Reactor Safety

Enclosure:

NRC Region I Inspe tion Report Nos. 50-220/87-11

and 50-410/87-25

cc w/encl:

T.

E.

Lempges,

Vice President,

Nuclear Generation,

J.

A. Perry,

Vice President,

Quality Assurance

T ~ Perkins,

General

Superintendent,

Nuclear Generation

W. Hansen,

Manager of Quality Assurance

T.

Roman, Station Superintendent

J. Aldrich, Supervisor,

Operations

W. Drews, Technical

Superintendent

Troy B. Conner, Jr.

Esquire

John

W. Keib, Esquire

Director,

Power Division

D.

Quamme,

NMP-2'Project Director

C.

Beckham,

NMPC QA Manager

R.

B. Abbott, Station Superintendent

Department of Public Service,

State of New York

Public Document

Room

(PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

ORMA (w/o encl)

ORP Section Chief

Robert J.

Bores,

DRSS

Ching Y. Cheng,

NRR/EMTB

DP~

I:DRS

Kerch/rw

9/i /87

Gramm

9/

(

/87

RI: DRS

Gray

9/1 /87

RI:ORS

Strosnider

9/I /87

RI: DRS

Durr

9/// /87

OFFICIAL RECORD

COPY

CIR NMP 87-11/25

0001.1.0

09/01/87