ML17055C893
| ML17055C893 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/09/1987 |
| From: | Haughey M Office of Nuclear Reactor Regulation |
| To: | Mcknight J NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17055C894 | List: |
| References | |
| NUDOCS 8703120169 | |
| Download: ML17055C893 (2) | |
Text
March 9, 1987 D'OCKET NO. 50-410 FROM:
Mary F. Haughey, Project Manager BWR Project Directorate No.
3 Division of BWR Licensing NOTE TO:
James McKnight, Document Control Branch DISTRIBUTION:
BWD-3 r/f EAdensam EHylton MHaughey
SUBJECT:
GENERAL ELECTRIC REPORT, "KKL IN-SERVICE EXPERIENCE WITH EPG-BALL VALVES (NIAGARA MOHAWK TASK NO. GE-I)"
OCTOBER 1986 The enclosed report entitled "KKL In-Service Experience with EPG-Ball Valves (Niagara Mohawk Task No. GE-1)" dated October 1986 was prepared for Niaqara Mohawk Power Corporation (NMPC) by General Flectric (GE).
This report discusses the experience at Leibstadt Switzerland with the EPG-Ball Valves.
The EPG-Ball Valves design is used for the main steam isolation valves (MSIVs) at Nine Mile Point Unit 2 (NMP-2).
This report was informally provided to the NRC by NMPC on February 25, 1987.
/s/
cc:
PDR LPDR FWitt JKudrick JLombardo RHermann JHulman Mary F. Haughey, Proiect Manager BWR Project Directorate No.
3 Division of BWR Licensing 87@~
pgp
~202gcp
<>OCi< ~~3Oy Oggpg PDp MHaughey/vag 03/
/87 D:BWD-3:DBL EAdensam 03/
/87
PP I
1 P 1
~
I=