ML17055C384

From kanterella
Jump to navigation Jump to search
Forwards Revised Final Draft Tech Specs,Reflecting Util Requests for Changes Approved by Nrc.Tech Specs Should Be Certified as Consistent W/Fsar,Ser & Suppls & as-built Facility.W/O Encl
ML17055C384
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/10/1986
From: Adensam E
Office of Nuclear Reactor Regulation
To: Mangan C
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8609160003
Download: ML17055C384 (6)


Text

September 10, 1986 Docket No. 50-410 Mr. C. V. Mangan, Senior Vice President Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202

Dear Mr. Mangan:

ACRS (10)

DI 8UTION:

oc et o.

0-410 NRC PDR Local PDR BWD-3 r/f EAdensam MHaughey EHylton RBernero

Attorney, OGC JPartlow EJordan BGrimes

Subject:

Changes to the Final Draft Technical Specifications for Nine Mile Point, Unit 2 By letter dated June 27, 1986, the final draft Technical Specifications for Nine Mile Point, Unit 2 were transmitted to you for certification.

In a number of submittals through August 22, 1986, Niagara Mohawk submitted requests for changes to the final draft Technical Specifications.

The staff has completed their review of the requested changes.

A number of requested changes were not acceptable for the following reasons,

1) the change is not acceptable for technical/safety reasons;
2) insufficient justification was provided for the proposed change; or 3) the issue would require signif'icant staff review, was submitted late in the process, and is not necessary for low power operation.

Those changes which were determined by the staff to be acceptable are reflected in the revised pages to the final draft Technical Specifications in the enclosure.

You should certify that the final draft Technical Specifications issued June 27, 1986, with the enclosed changes are consistent with the Final Safety Analysis Report, the NRC Safety Evaluation Report (NUREG-1047) and its supplements, and the as-built facility.

The resources and processes used to review and certify the Technical Specifications should be detailed in your response.

If any addi-tional comments are provided before or with your certifications, you may be requested to recertify, following staff review of those

comments, any required revisions to the Technical Specifications or the Safety Evaluation Report.

Supplement 4 to the Nine Mile Point 2 Safety Evaluation Report is expected to be issued shortly to support the certification process of the Technical Specifica-tions'~

8+OqigOOOS 8&o O

~(

pDR ADoC~

pDR A

K

\\

H II,,

I' I

The certification of the Technical Specifications is required before an operating license can be issued for Nine Mile Point, Unit 2.

Certification, therefore, should be provided commiserate with your anticipated fuel load date.

Additional changes submitted close to the anticipated fuel load date may delay licensing.

Sincerely,

Enclosure:

As stated

/S/

Elinor G. Adensam, Director BWR Project Directorate No.

3 Division of BWR Licensing cc:

See next page BWD-39)

MHaughey/hmc 9/ p/86 LA'BWD-3' EHy 9

/

D; D 3:DBL EAde sam 9/I0/96

t

Mr. C. V.'angan Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit 2 CC:

Mr. Troy B. Conner, Jr.,

Esq.

Conner 5 Wetterhahn Suite 1050 1747 Pennsylvania

Avenue, N.W.

Washington, D.C.

20006 Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus

Syracuse, New York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.

Box 99

Lycoming, New York 13093 Mr. John W. Keib, Esq.

Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202 Mr. James Linville U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of -Prussia, Pennsylvania 19406 Norman Rademacher, Licensing Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Don Hill Niagara Mohawk Power Corporation Suite 550 4520 East West Highway
Bethesda, Maryland 20814 Regional Administrator, Region I U.S. Nuclear Regulatory Comnission 631 Park Avenue King of Prussia, Pennsylvania

,19406 Mr. Paul D. Eddy New York State Public Serice C0Mli.ssion Nine Mile Point Nuclear Station-Unit II P.O.

Box 63

Lycomina, New York 13093

e l4