ML17055B965

From kanterella
Jump to navigation Jump to search
Forwards Draft BNL Rept, Interfacing Sys LOCA at BWRs Task 1A & 2A, to Be Used in Resolution of Generic Issue 105 Re Intersystem LOCAs & Bwrs.Review & Comments Requested.W/O Encl
ML17055B965
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/25/1986
From: Haughey M
Office of Nuclear Reactor Regulation
To: Hooten B
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8607080356
Download: ML17055B965 (4)


Text

a,~.

s June 25, 1986 Docket No. 50-410 Mr. B. G.

Hooten'xecutiveDirector of Nuclear Operations Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202

Dear Mr. Hooten:

DI BUTION:

oc et o.

0-410 NRC PDR Local PDR BWD-3 r/f

EAdensam, MHaughey EHylton RWoods w/o enclosure
Attorney, OELD EJordan BGrimes JPartlow jLGRS (10)

Subiect:

Draft BNL Report, "Interfacing Systems LOCA at BllRs Tasks 1A and 2A" l

Enclosed is a draft report from Brookhaven National Laboratory (BNL) entitled, "Interfacing Systems LOCA at BWRs Tasks 1A and 2A".

- This draft report contains information complied by BNL for use in performing a probability risk assessment (PRA) concerning intersystem LOCAs.

The BNL contract is with the Division of Safety Review and Oversight (DSRO),

NRR and is to be used in the resolution of Generic Issue ¹105, "Intersystem LOCAs in BWRs".

Roy Woods is the Task Manager for this effort.

This information will be used in subsequent tasks which will identify possible interfaces between high and low pressure

systems, possible failure modes and frequencies, and likely consequences of those postulated LOCAs.

We would appreciate your review of the material concerning Nine Mile Point Unit 2 and your comments regarding its accuracy and completeness.

Your comments will assist us in assuring that later BNL efforts in this area are based on correct information.

Your comments on the enclosed draft report should be sent directly to Roy Woods at the NRC.

Sincerely,

Enclosure:

As stated

/S/

Mary F. Haughey, Project Manager BWR Project Directorate No.

3 Division of BWR Licensing cc:

See next page MHaughey/hmc 6@y/86 L :BQD-3:DBL EH

%on D-3:DBL EAdansam 6/g)/86 8607080356 860b25 PDR

  • DOCY 05000410 A

PDR

1

'1 ll pg II l A

F' P'

Mr. B. G. Hooten Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit -2 CC:

Mr. Troy B. Conner, Jr.,

Esq.

Conner E =Wetterhahn Suite 1050 1747 Pennsylvania

Avenue, N.W.

Washington, D.C.

20006 Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus

Syracuse, New York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.

Box 99

Lycominq, New York 13093 Mr. John W. Keib, Esq.

Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202 Mr. James Linville U. S. Nuclear Regulatory Commission Region I 631 Park Avenue Kinq of Prussia, Pennsylvania 19406 Norman Rademacher, Licensing Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Regional Administrator,'egion I U.S. Nuclear'egulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Paul D. Eddy New York State Public Service Commission Nine Mile Point Nuclear Station-Unit II Post Office Box 63
Lycoming, New York 13093 I

Don Hill Niaqara Mohawk Power Corporation Suite 550 4520 East West HighWay

Bethesda, Maryland 20814

i.-

A 0/