Forwards As-Built Team Insp Rept 50-410/86-13 on 860414-25 & 0506 & Notice of Violation.Sys Constructed Substantially in Accordance W/Descriptions in FSAR & Ser,Except for Work Performed by Reactor Controls,Inc
ML17055B879
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/19/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hooten B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055B882 List:
References
NUDOCS 8606240077
Download: ML17055B879 (4)


See also: IR 05000410/1986013

Text

JlN

1 8 1986

Docket No.

50-410

Niagara

Mohawk Power Corporation

ATTN:

Mr. B.

G. Hooten

Executive Director

Nuclear Operations

300 Erie Boulevard,

West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

Report

No. 50-410/86-13

This refers to the As-Built Team inspection

conducted

by Mr. J-.

T. Wiggins of

this office on. Apr'i 1 14-25,

1986 at the Nine Mile Point Station, Unit 2 and by

Mr. K. Manoly on May 6,

1986 at Stone

8 Webster Engineering office in Cherry

Hill, New Jersey.

The findings of this inspection

were discussed

by Mr.

Wiggins with Mr. D.

guamme, of your staff, during the exit meeting

on April 25,

1986

and the telephone

conversation

of May 8,

1986.

Areas

examined during this inspect,ion

are described

in the

NRC Region I

Inspection

Report which is enclosed with this letter.

Within t,hese

areas,

the

inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

measurements

and calculations

performed

by

the

Team.

In general,

the results of this inspection

indicated that the as-built

condition of the systems

examined

were

good and were in conformance with

drawing requirements.

Further,

the results

showed that these

systems

were

constructed

substantially

in accordance

with the descriptions

provided in the

Final Safety Analysis Report, and in the

NRC Safety Evaluation Report.

One noteworthy exception involved the work performed

by Reactor Controls,

Incorporated

(RCI).

The Team found that certain

supports

involved with the

scram discharge

volume headers

did not conform with drawing requirements

regarding

the provisions for thermal

expansion

gaps.

These conditions existed

even

though the drawing indicated that the as-built condition had

been verified

and that your Architect-Engineer

had accepted

the

RCI work based

on

a sampling

inspection.

Therefore,

based

on the results of this inspection, it appears

that

RCI

work and certain other plant activities were not conducted

in full compliance with

NRC requirements,

as set forth in the Notice of Violation, enclosed

herewith

as Appendix A.

These violations have

been categorized

by severity level in

accordance

with the revised

NRC Enforcement Policy (10 CFR 2, Appendix C)

published in the Federal

Register Notice (49 FR 8583) dated

March 8,

1984.

You

are required to respond to this letter and in preparing your response,

you

should follow the instructions contained

in Appendix A.

8bOb240077

8bOb19

PDR

ADOCK 05000410I

8

PDR

OFFICIAL RECORD

COPY

IR NMP2 86-13 - 0001.0. 0

06/18/86

'U

Nil I

'lt

'la

P

isa

v

1~ C

Niagara

Mohawk Power Corporation

2

The responses

directed

by this letter

and the accompanying

Notice are not

subject to the clearan'ce

procedures

of the Office of Management

and Budget as

required

by the Paperwork Reduction Act of 1980,

PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

pzipinal S<S"e

~"'tewart

D. Ebneter,

Director

Division of Reactor Safety

Enclosures:

1.

Appendix A, Notice of Violation

2.

Region I Inspection

Report

Number

50-410/86-13

cc w/encls:

Connor

8 Wetterhahn

John

W. Keib, Esquire

J.

A. Perry, Vice President,

Quality Assurance

W. Hansen,

Manager of Quality Assurance

D.

Quamme,

NMP-2 Project Director

C.

Beckham,

NMPC QA Manager

T. J. Perkins,

General

Superintendent

R.

B. Abbott, Station Superintendent

Department of Public Service,

State of New York

Public Document

Room

(PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident Inspector

State of New York

bcc w/encls:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encls)

DRP Section Chief

Region -I SLO

RI: DRS

Manoly/gcb/mjd

5/Sx/86

I:DRS

Wiggins

5/Q/86

RI:DRS

Durr

6/&/86

R:D

RI:DRS

Johnston

.

Ebneter

4/&/86

5/

/86

'OFFICIAL RECORD