Forwards Insp Rept 50-410/86-01 on 860113-0221 & Notice of Violation.Response Should Address Intention to Strengthen Operational Test Procedure to Ensure Test Acceptance Criteria Meet FSAR Commitments
ML17055B425
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/31/1986
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hooten W
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055B426 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8604040351
Download: ML17055B425 (4)


See also: IR 05000410/1986001

Text

Docket No. 50-410

I>MA~ iSes

Niagara

Mohawk Power Corporation

ATTN: Mr. William G. Hooten

Executive Director - Nuclear Operations

c/o Miss Catherine

Seibert

300 Erie Boulevard West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

No. 50-410 86-01

This refers to the routine inspection

conducted

by Mr. S.

Hudson of this office

on January

13,

1986 to February

21,

1986, at Nine Mile Point, Unit 2, Scriba,

New York of activities authorized

by

NRC License

No.

CPPR-112

and to the

discussions

of our findings held by Mr. Hudson with Mr. R.G. Matlock, Mr. W.

Hansen

and other

members of your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the

NRC Region I

Inspection

Report which is enclosed with this letter.

Within these

areas,

the

inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that

one of your activities

was not conducted

in full compliance with NRC requirements,

as set forth in the

Notice of Violation, enclosed

herewith

as Appendix A.

This violation has

been

categorized

by severity level in accordance

with the General

Statement

of

Policy and Procedure

for Enforcement Action (Enforcement Policy),

10 CFR 2,

Appendix

C ( 1985).

You are required to respond to this letter

and in preparing

your reponse,

you should follow the instructions

in Appendix A.

This violation concerns

the failure to properly review and approve

a pre-

operational

test procedure

to ensure

that test acceptance

criteria meet the

FSAR commitments.

This has

been

a continuing concern to the

NRC.

In your

response,

you should address

how you intend to strengthen

your review and

approval

process

to prevent recurrence.

The responses

directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget

as

required

by the Paperwork

Reduction Act of 1980,

PL 96-511.

860404035i

860331

PDR

ADOCK 05000410

8

PDR

OFFICIAL RECORD

COPY

IR NMP2 86-01

0001.0.0

03/24/86

o1~~

~

'

I i.](

Your cooperation with us in this matter is appreciated.

Sincerely,

actual. Signed By c

Samuel J. Collins, Chief

Projects

Branch

No.

2

Division of Reactor Projects

Enclosures:

l.

Appendix A, Notice of violation

2.

Region I

NRC Inspection

Report

Number

50-410/86-01

(

cc w/encl:

Connor 5 Wetterhahn

'ohn

M. Keib, Esquire

D.

Quamme,

NAP-2 Project Director

. C.

Beckham,

NMPC QA Manager

. T.J. Perkins,

General

Superintendent

.

RE B. Abbott, Station Superintendent

. Department of Public Service,

State of New York

Public Document

Room

(POR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

~

NRC Resident

Inspector

. State of New York

bcc w/encl:

Region I Docket

Room (with concurrences)

senior Operations Officer (w/o encls)

~Chief, Engineering

Programs

Branch

~J. Linville, Section Chief,

DRP

~tate

Liaison Officer (SLO)

~H. Hiller, Radiation Specialist

RI.

P

H

son/rhl

3/Q(/86

.ORP

'nvi lie

3/g4/86

3/gl86

OFFICIAL RECORD

COPY

IR NMP2 86-01

0002.0. 0

03/24/86

3