ML17055B354

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-410/86-04 on 860127-31.No Violation Noted.Quality First Program Lead Corrected Several Quality Concerns That Might Not Have Been Identified.Recommended Improvements Noted
ML17055B354
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/05/1986
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hooten B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055B356 List:
References
NUDOCS 8603110180
Download: ML17055B354 (4)


See also: IR 05000410/1986004

Text

Docket No.

50-410

SN5

Niagara

Mohawk Power Corporation

ATTN:

Mr. B. G. Hooten

Executive Director

Nuclear Operations

c/o Miss Catherine

R. Seibert

300 Erie Boulevard,

West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

Report

No. 50-410/86-04

This refers to the special

team assessment

of the Nine Mile Point, Unit 2,

Quality First Program

(Q1P)

and its implementation

by this office on January

27-31,

1986, at Nine Mile Point 2, Scriba,

New York, and to the discussion

of

our findings at the conclusion of our assessment

held by Mr. J.

C. Linville

with Messrs.

R. Matlock and A. Kovac of your staff.

The assessment

consisted of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observations

by the team

members.

Findings are described

in the

NRC Region I Inspection

Report which is

enclosed with this letter.

Overall the assessment

indicated that your Quality First Program

has

led to the

correction of several

quality concerns that might not otherwise

have

been

identified,

and that the program

has

several

noteworthy strengths.

It further

showed that manag'ement

oversight

has led to improved

Q1P effectiveness.

How-

ever,

as discussed

within the attached

report our .assessment

identified several

areas

where

improvements

are

recommended

to enhance

the effectiveness

of your

established

program.

Within the

scope of this assessment,

no violations were observed

and

no written

response

to this letter is required.

Your cooperation with us in the conduct of this assessment

is appreciated.

Sincerely,

~~~ Sisal<

>~'amuel

J. Collins, Chief

Projects

Branch No.2

Division of Reactor Projects

Enclosure:

NRC Region I Inspection

Report

No. 50-410/86-04

";"... 8603Ki0180'60$ 05

'<">>":"PDR

ADOCK 050004iQ j

'.9

-

PDR,

g

OFFICIAL RECORD

COPY

IR NINE MILE PT2 86"04 " 0001.0.0

02/27/86

l K~0 I

P

.

t

~

I\\

Niagara

Mohawk Power Corporation

cc w/encl:

Connor

8 Wetterhahn

John

W. Keib, Esquire

D.

Quamme,

NMP-2 Project Director

CD

Beckham,

NMPC

QA Manager

T. J. Perkins,

General

Superintendent

R.

B. Abbott, Station Superintendent

Department of Public Service,

State of New York

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

II5

1986

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

DRP Section Chief

Region I SLO

o/Gas

H. Qo~bey, NRR,gWR bc~>~

P. Nctet=, OR,PB,'X'E

RI:

P

RI:DRP

. RI

R

Doer f1 ein/mlb

Paol ino

'i vil l e

02/p7/86

o~

02/07/86

~/

/86

00/$ /86

OFFICIAL RECORD

COPY

IR NINE MILE PT2 86-04 - 0002.0.0

02/27/86

I