Denies 851007 Request to Utilize Alternative to 10CFR50.55a Requirements Re Use of Authorized Nuclear Inspectors. Proposed Alternative Does Not Provide Acceptable Independent Verification of Component Quality in safety-related Sys
ML17055B353
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/28/1986
From: Adensam E
Office of Nuclear Reactor Regulation
To: Hooten B
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8603110068
Download: ML17055B353 (4)


Text

February 28, 1986 Docket No. 50-410 Mr. B.

G. Hooten Executive Director of Nuclear Operations Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202

Dear Mr. Hooten:

DISTI TION:

c et No. 50-410 NRC PDR Local PDR PRC System BWD-3 r/f EAdensam MHaughey EHylton RKirkwood RBosnak

Attorney, OELD BGrimes JPartlow EJordan ACRS (10)

Subject:

Application to Utilize an Alternative to 10 CFR 50.55a Concerning the Use of Authorized Nuclear Inspectors for Nine Mile Point, Unit 2 In a letter dated October 7, 1985, Niagara Mohawk Power Corporation (NMPC) sub-mitted an application to utilize an alternative to the requirements of 10 CFR 50.55a concerning the use of 'Authorized Nuclear Inspectors (ANIs) at Nine Mile Point, Unit 2.

The NMPC request involves the transfer of the Authorized Nuclear Inspector (ANI) functions for Classes I, 2, and 3 pipe supports, as required by Paragraphs NA-4520 and NA-5241 of Section III of the ASME Code, with an inspection program by the installer.

In addition, the NMPC request replaces the ANI Certification for Classes 1, 2, and 3 pipe supports with an Engineering Reconciliation Support Summary package and ASME documentation review and verification by the installer to assure that ASME Section III requirements have been met.

The staff has reviewed the NMPC proposal and does not agree with this deviation from the requirements of the Code.

It is the staff position that the ANI provides an independent review that verifies component quality in safety-related systems that is not provided by the proposed alternative.

Further, the staff finds that NMPC has not demonstrated that

( I) the proposed alternatives would provide an accept-able level of quality and safety, or (2) compliance with the specified require-ments of this section would result in hardship or unusual difficulty,without a compensating increase in the level of quality and safety for the reason stated above.

Therefore, NMPC should comply with the requirements of Section III of the Code in its entirety and the request to utilize an alter nate to 10 CFR 50.55a is denied.

Any questions concerning the above information should be directed to the Licensing Project Manager, Mary Haughey, (301) 492-7897.

Sincerer ly, Wa g

';.;,>-.,86OaA ao&-8ecme-..'"..-..

,;.PDR ADOCK 050004iO:,

I';,;

PDR

/S/

Elinor G. Adensam, Director BWR Project Director'ate No.

3 Division of BWR Licensing cc:

See next p ge

- ~r BWD~ L MHauahey/ml 1/7786 L

QW

DBL OELD

'DBL ylkon BBordehi:ck E

am

'/86

'1/ g/86 g 86

"I i

s*

s f

4 I

ll A

s 1

~ ll II ff I

t' II II s

~

I

)

s>F'*

f 0 ~,'

lt'"

I

'I f

I'

Mr. B.

G. Hooten Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit 2 CC:

Mr. Troy B. Conner, Jr.,

Esq.

Conner 5 Wetterhahn Suite 1050 1747 Pennsylvania

Avenue, N.W.

Washington, D.C.

20006 Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus

Syracuse, New York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.

Box 99

Lycoming, New York 13093 Mr. John W. Keib, Esq.

Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13?02 Mr. James Linville U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Norman Rademacher, Licensing Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Paul D.

Eddy New York State Public Service Commission Nine Mile Point Nuclear Station-Unit II Post Office Box 63

Lycoming, New York 13093 Don Hill Niagara Mohawk Power Corporation Suite 550 4520 East West HighWay
Bethesda, Maryland 20814