Identifies Info Needed to Close Listed SER Open & Confirmatory Items,Per 860114 Discussion.Schedule for Submitting Balance of Identified Outstanding Info Requested within 10 Days
ML17055B259
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/07/1986
From: Adensam E
Office of Nuclear Reactor Regulation
To: Hooten W
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8602180414
Download: ML17055B259 (10)


Text

~e

'4

~A AEQ((

(4

<<++++

H UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 February 7, 1986 Docket No. 50-410 Mr. B.

G. Hooten Executive Director of Nuclear Opera.ions Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202

Dear Mr. Hooten:

Subject:

Outstanding Information Required to Close Open and Confirmatory Issues for Nine Mile Point, Unit 2 On January 14,

1986, we discussed with Mr. Don Hill of your staff the status of open and confirmatory issues on i<inc Mile Point, Unit 2 (NMP-2).

At that time we also discussed with Mr. Hill the information outstanding from Niagara Mohawk which will be needed before the staff can close out tho associated issues.

The enclosure to this letter identifies the issues on NMP-2 for which information is needed from Niagara Mohawk to close the issue.

There are still a large number of these issues remaining.

In order to assist us in scheduling our efforts and resources we are reque&ing that within ten days of receipt of this letter you submit, in writing, a schedule for submitting the balance of the outstanding information as identified in the enclosure.

Sincerely, cc w/enclosure:

See next page Elinor G. Adensam, Director BMR Project Directorate III3 Division of BMR Licensing r g"~.~

4

'9-'-'."'

CeY<~~

aaoaiaoee4 eeoa07 PDR ADOCK 050004i0 PDR

~,'

I 7'.'l h

'l J

ENCLOSURE OUTSTANDING INFORMATION RE(UIRED FROM NNPC SER 0 en Items Item (3)

Descri tion Preservice and inservice inspection plan Information Re uired IST - Key for reading IST drawings (4)

Equipment qualification Eg - response to 1/8/86 request for information (8)

Containment leak testing Exemption requests needed for the t1SIV and airlock leak testing (ref. 1/23/86 con. call - Don Hill)

(11)

Separation criteria revised Myle test report (17)

Preoperational and startup test 14 abstracts response to 12/24/86 request for additional information (18)

DCRDR and SPDS response to concerns identified in letters 1/22/86 and 1/29/86 with draft SERs enclosed.

T 4

Confirmatory Items Item Descri tion Information Re uired Design of parapet scuppers on roofs of safety-related buildings Need details of caulking per 1/6/86 letter (6)

SRV/pool dynamic 1oa'ds on containment interior structure Clarification of September 30, 1985 letter as discussed at 12/20/85 meeting (7)

Analytical results for the reactor internals for LOCA and SSE Need confirmation that "new loads" verification program is complete (requested from Don Hill 1/8/86)

(8)

Results of Mark II hydrodynamic loads for NSS piping, components, and equipment Need confirmation that "new loads" verification program is complete (requested from Don Hill 1/8/86)

{17)

Ins rument setpoints See SSER Section 7.2.2.3 (19)

(2O)

Minimum number of channels required to initiate protection actions Isolation of circuits FSAR and Technical Specification need to be revised for the radiation monitoring instrumentation Test results of Kaman isolators (22)

Testing of protection systems instrumentation Detailed response required in accordance with SER.

11/27/85 letter did not respond to SER concern (25)

LPCI and LPCS injection valves interlocks Information on remote control panel interlocks still needed

h 4

~ ~

W

~ ~

~

El

~

a H

3 w

Item (27)

Description High Energy Line Break Information Re uired (a)

Damage to cable trays or cables passing through respective zones is not discussed.

(b)

Page 12 of analysis submitted 1/2/86 indicates the worst case combined sequence is not covered under the existing FSAR Chapter 15 analysis.

(28)

Adequacy of station electric distribution system voltage Need commitment to promle information on degraded voltage relays to support license condition (29)

Supporting analysis required to confirm adequacy of LFhG motor circuit breaker as backup overcurrent protection for recirculation pump motor electrical penetration Need information on test

{35)

Procedures for filling fuql Notification of availability of final oil storage tanks operating procedure for review.

(41)

Procedures for minimum loading of'iesel generators.

Notification of availability of final operating procedures for review.

(47)

Alert and notification of Need date when TSC and EOF will be the public with 15 minutes operational (48)

EOF staffing Need date when TSC and EOF will be operational (49)

Basis for recommendations for protective measures Need date when TSC and EOF will be operational (51)

IE Bulletin 79-08 item 6 (NUREG-0737 Item II.K.1.5, Review ESF Valves) and Item 8 (NUREG-0737 Item II.K.1.10, Operabi 1 ity Status)

Confirmation needs to be provided that procedures are complete and have beem reviewed in conformance these requirements

~

~

V

~ V

~

)

Mr. B.

G. Hooten Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit 2 CC:

Mr. Troy B. Conner, Jr.,

Esq.

Conner 8 Wetterhahn Suite 1050 1747 Pennsylvania

Avenue, N.W.

Washington, O.C.

20006 Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus

Syracuse, New York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.

Box 99

Lycoming, NeW York 13093 Mr. John W. Keib, Esq.

Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202 Mr. James Linville U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Norman Rademacher, Licensing Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Paul D.

Eddy New York State Public Service Commission Nine Mile Point Nuclear Station-Unit II Post Office Box 63

Lycoming, New York 13093 Don Hill Niagara Mohawk Power Corporation Suite 550 4520 East West HighWay
Bethesda, Maryland 20814

~

~