Forwards Insp Rept 50-410/85-36 on 851021-1126 & Notice of Violation
ML17055B080
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 01/10/1986
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hooten W
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17055B083 List:
References
NUDOCS 8601210126
Download: ML17055B080 (4)


See also: IR 05000410/1985036

Text

e

Docket No.

50-410

'~~ 2 0 lggg

Niagara

Mohawk Power Corporation

ATTN: Mr. Wil'tiam G. Hooten

Executive Director Nuclear Operations

c/o Miss Catherine Seibert

300 Erie Boulevard West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

No. 50-410/85-36

This refers to the routine inspection

conducted

by Mr. R.A.

Gramm and L.T.

Doerflein of this office on October 21, to November 26,

1985 at Nine Mile

Point, Unit 2, Scriba,

New York of activities authorized

by

NRC License

No.

CPPR-112

and to the discussions

of our findings held by Mr. Gramm with Mr. W.

Hansen,

and other members of your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the

NRC Region I

Inspection

Report which is enclosed with this letter.

Within these

areas,

the

inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

The responses

directed

by this letter and the accompanying

Notice are not sub-

ject to the clearance

procedures

of the Office of Management

and Budget as

required

by the Paperwork Reduction Act of 1980,

PL 96-511.

Your cooperation with us in this matter is appreciated.

Orig~ Sian<<W~

Samuel J. Collins, Chief

Projects

Branch

No.

2

Division of Reactor 'Projects

Sincerely,

PDR

ggoC~ 86pll0

860l QlOl

QCK 050004l 0

'bR

Based

on the results of this inspection, it appears

that one of your activities

was not conducted

in full compliance with NRC requirements,

as set forth in the

Notice of Violation, enclosed

herewith

as Appendix A.

This violation has

been

categorized

by severity level in accordance

with the

NRC Enforcement Policy (10 CFR 2, Appendix C), published in the Federal

Register

Notice (49 FR 8583) dated

March 8, 1984.

You are required to respond to this letter and in preparing

your response,

you should follow the instructions

in Appendix A.

Enclosures:

1.

Appendix A, Notice of Violation

2.

Region I

NRC Inspection

Report

Number 50-410/85-36

OFFICIAL RECORD

COPY

IR NMP2 85-36

0001.0. 0

01/09/86

f

P'll

,Y

1

V

~

1>t

N

1

cc w/encl:

Connor 5 Wetterhahn

John

M. Keib, Esquire

D.

Quamme,

NMP-2 Project Director

C.

Beckham,

NMPC QA Manager

T.J.

Perkins,

General

Superintendent

R.B. Abbott, Station Superintendent

Department of Public Service,

State of New York

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encl:

Region I Docket

Room (with concurrences)

Senior Operations Officer (w/o encls)

Chief, Engineering

Programs

Branch

J. Linville, Section Chief,

DRP

J. Grant,

DPRP

State Liaison Officer (SLO)

R: DRP.

L nvilie/rhl

1/

/86

cV,

R

D

P

ramm

1/ i/86

OFFICIAL RECORD

COPY

IR NMP2 85-36

0002.0.0

01/09/86

)

h