January 6,
1986 Docket No.:
50-410 Mv. B.
G. Hooten Executive Director for Nuclear Operations Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202
Dear Mr. Hooten:
DI BUTION
~ oc et i
e NRC PDR Local PDR BWD-3 R/F RBernero EAdensam EHylton MHaughey OELD EJordan JPavtlow BGrimes ACRS(10)
MSrinivasan JMauck ANolan (P-234)
JLee JLazevnick KDesai
- SHudson, RI
- DKatze, PS, DBL
Subject:
Responses to Confirmatory issues in letters dated November 27,
- 1985, and December 2, 1985 During discussions with your staff it had been indicated that the procedures for Nine Nile Point, Unit 2 (NNP-2) would be completed in November 1985.
Recent letters from your staff have indicated that, in fact, a number of procedures would not be complete until February 15, 1986.
In discussions with Nr. Anthony Zallnick, of your staff, on December 6,
1985, the Licensing Project Manager, Ms. Navy Haughey, indicated that this later completion date may not support a February 24, 1986, fuel load date.
Specifically, a number of confirmatory issues in the SER rely on completion of certain procedures.
Below is a list of concerns relating to responses to confirmatory issues submitted in letters dated November 27,
- 1985, (NMP2L 0542) and December 2,
- 1985, (NMP2L 0548).
Letter No.
NMP2L 0542 Confirmatory Issue 51 Concern
Response
does not complete action.
Procedures need to be completed and reviewed as appropriate before this issue is closed.
NNP2L 0548 55 Procedures indicated as being on site, available for review for February 15, 1986.
This schedule will not support a
February 24, 1986, fuel load date.
NMP2L 0545 22 The applicable procedures need to be completed before this issue can be addressed.
This issue should then be addressed in accordance with SER Section 7.3.2.5 and IE Information Notice 84-37.
860i17035i 860i06 PDR ADOCK 050000io
l II l
II" L
Mr. B.
G. Hooten In addition, to the above listed concerns about procedures schedules, the staff has the following concerns with recently submitted responses to confirmatory issues.
The response to confirmatory issue 28, adequacy of station electrical distri-bution system voltage, submitted in a letter dated November 27,
- 1985, (NMP2L 0545), indicated that the additional testing required to complete this confirmatory issue would be conducted as part of the Loss of Power/ECCS Functional Test.
As stated in Section 8.4. 1, the results of this test are needed to confirm the adequacy of the final setpoint of the degraded voltage relay.
Therefore, this issue cannot be closed until the results of these tests are available and Niagara Mohawk provides confirmation that the test results support the adequacy of the setpoint.
The response to confirmatory issue 35 submitted in a letter dated November 27,
- 1985, (NMP2L 0546), indicated that the diesel generator fuel oil storage tanks would be filled through the diesel day tank connections, if necessary.
The FSAR and the SER indicate that the fuel storage tanks could be filled through the tank manhole located i n the diesel generator building.
The FSAR should be revised to be consistent with the November 27, 1985 letter.
This discrepancy was discussed with Mr. Don Hill of your staff.
Any questions relating to the above listed concerns should be directed to the Licensing Project Manager, Mary Haughey - (301)492-7897.
Sincerely, cc:
See next page Elinor G. Adensam, Director BWR Project Directorate No.
3 Division of BWR Licensing BWD-3 MHaughey:mn 01~/
/86 LA:
D-3/DBL El@ tn OT/
86 3/DBL E
e m
01/
/86
~
~
Pg 1s nr 4
II I
0
Mr. B.
G. Hooten Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit 2 cc Mr. Troy B. Conner, Jr.,
Esq.
Conner 8 Wetterhahn Suite 1050 1747 Pennsylvania
- Avenue, N.W.
Washington, D.C.
20006 Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus
- Syracuse, New York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.
Box 99
- Lycoming, New York 13093 Mr. John W. Keib, Esq.
Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Mr. James Linville U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Norman Rademacher, Licensing Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Paul D.
Eddy New York State Public Service Coranission Nine Mile Point Nuclear Station-Unit II Post Office Box 63
- Lycoming, New York 13093 Don Hill Niagara Mohawk Power Corporation Suite 550 4520 East West HighWay
- Bethesda, Maryland 20814
V l,1 0
~: