UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 8, 1986 Docket No.:
50-410 Mr. B.
G.
Hooten Executive Director for Nuclear Operations Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202
Dear Mr. Hooten:
Subject:
Environmental gualification Audit of Nine Mile Point, Unit 2 During the week of December 16, 1985, the NRC staff performed an Environ-mental gualification Audit on Nine Mile Point, Unit 2 (NMP-2).
During that audit a number of items were identified as needing to be completed in order to have a complete and acceptable program for Environmental gualification of safety-related electrical equipment.
A meeting summary is being prepared for this meeting.
However, in order to assist your staff in providing the information still required for this program, Enclosure 1 contains a list of action items for the Environmental gualification Program as identified during that audit.
For each of the items identified confirmation should be provided in writing that the action has actually been completed.
A response that an action will be completed as required will not be sufficient to close the item.
In addition, Enclosure 2 identifies the Mechanical Engineering Packages which are to be submitted for staff review.
A schedule for response to the enclosures should be provided to the Licensing Project Manager, Mary Haughey - (301)492-7897 within eight working days from the date of this letter.
Any questions concerning the enclosures should be directed to the Licensing Project Manager.
Sincerely,
Enclosures:
As stated cc:
See next page g+P> i30560 8 yg0 boi08 pDR ADOCK 0 DR A
Elinor G. Adensam, Director BWR Project Directorate No.
3 Division of BWR Licensing DESXGMT 0 P. ~OX
,Carti led. By.
Mr. B.
G. Hooten Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit 2 CC:
Mr. Troy B. Conner, Jr.,
Esq.
Conner h Wetterhahn Suite 1050 1747 Pennsylvania
- Avenue, N.W.
Washington, D.C.
20006 Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus
- Syracuse, New York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center
'New York, New York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.
Box 99 Lycoming, New York 13093 Mr. John W. Keib, Esq.
Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Mr. James Linville U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Norman Rademacher, Licensing Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Regional Administrator, Region I
U.S. Nuclear Regulatorv Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Paul D. Eddy New York State Public Service Commission Nine Mile Point Nuclear Station-Unit II Post Office Box 63
- Lycoming, New York 13093 Don Hill Niagara Mohawk Power Corporation Suite 550 4520 East West HighWay
- Bethesda, Maryland 20814
e>
Enclosure I Environmental gualification of Safety-Related Electrical Equipment Items for Which Confirmation is to be Provided 1."
The maintenance and surveillance programs are fully implemented.
2.
All files have been reviewed to ensure all sealing requirements have been properly implemented in the field installation.
3.
All files have been reviewed to ensure the Arrhenius methodology of accelerated aging has been properly applied.
4.
All SCEW sheets have been updated to ensure they contain current information (i.e., accuracy, radiation, etc.).
5.
All files include up-to-date SCEW sheets for each piece of equipment.
6.
The files for the ASCO NP 8361 valve and the Limitorque operators have been revised to reflect the correct qualification reports and all other related information.
0 Y
Enclosure 2
mechanical Engineering Packages to be Submitted for Review l.
2 CCP*RV 171 Spec.
C051A 2.
2 SFC*E 1B Spec.
P221X 3.
2 ICS*P2 RHS System Pressure Pump (Gould)
l l