ML17054C028
| ML17054C028 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/02/1987 |
| From: | Lazarus W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mangan C NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 8704070214 | |
| Download: ML17054C028 (8) | |
Text
REGULATOR NFORMATION DISTRIBUTION.
TEN (RIDS)
ACCESSION NBR ~ 8$ 040702i4, DOC ~ DATK$ 87/04/02 NOTARIZED NO DOCKET ¹ FACIL!50 220 Nine Mile Point Nuclear Station< Unit ir Niagara Powe 05000220 AUTH,NAME AUTHOR AFFILIATION LAZARUSiiS.J, Region li Office of Dir ector RKCIP ~ NAME'ECIPIENT AFFILIATION MANGANgC',V~
Ni agar a Mohawk Power Cor p.
SUBJECT Lists guide:l-ines for submittal a review of objectives 8
scenario packages prior" to 870826 partial-scale emergency exercise< Importance-of completeness 8 time,liness stressed.
DISTRIBUTION COOK! IE35D COPIES RECEIVED:LTR
'NCL + SIZE:
TITLE: Emergency Pr eparedness Appraisal/Confirmatory Action Ltr/E'er cise Rep NOTES!
RECIPIENT ID CODE/NAME'D1 1 IA KELLYeJ~
COPIES LTTR> ENCL 1.
0 1
RECIPIENT ID,CODE/NAME PD1~1 PD COPIES LTTR ENCL 1
1
.INTERNAL:,ADM/LFMB R/DROOP/EPB-REG 02'GN2/DRSS/EPRPB EXTERNAL':- LPDR NSIC 1
0 3.
3.
1-
'1 l.
1 NRR/ADT NRR/PMAS/ILRB RGN1 F
ILE'RC PDR 1'1 1
1 1
1 TOTAL. NUMBER OF COPIES REQUIRED:
LTTR 15 ENCL=
13
0
APR OR 1S87 Docket No. 50-220 Niagara Mohawk Power Corporation ATTN:
Mr. C. V. Mangan Senior Vice President 301 Plainfield Road
- Syracuse, New York 13212 Gentlemen:
In order for the Region to fully support the Nine Mile Point partial-scale emergency exercise scheduled for August 26,
- 1987, an adequate review of the exercise objectives and scenario is, essential.
The guidelines identified below will be used for the submittal and review of the objectives and scenario packages prior to the exercise.
You will note that the schedule is similar to the least restrictive submittal schedule noted in FEMA Guidance Memorandum No.
17, Revision 1, for comparable milestones.
Region I has found that licensees generally comply with these guidelines, howev'er, we recognize the need to stress the importance of both completeness and timeliness.
The following schedule should be used for all exercises:
Days in Advance
.75 Days 60 Days 45 Days Information,to be Submitted I
Description and scope of exercise, and the objectives to be fulfilled should be received in the Region I office.
The objectives should include specific objectives to demonstrate, where appropriate, the effectiveness of corrective actions taken in regard to problem areas which have been previously identified during NRC inspections, emergency exercises and drills and your internal evaluation process.
NRC will provide comments in writing, based on our review of your submittal.
Complete exercise scenario package with modified objectives, schedules, exercise rules, all controller, contingency and simulation informa-tion, all data, including plant data, radiation level and release rate data, and samples of the data to be presented should be received in the Region I office.
OFFICIAL RECORD COPY S70+0702>i 870eoi PDR ADOCK 05000220 F
Niagara Mohawk Power Corporation 30 Days NRC will provide comments in writing, based on our (and our contractor's) review of your submittal.
In order to protect the scenario from disclosure to participants, please send two copies to the
- Chief, Emergency Preparedness Section at. the Letterhead
- address, marked, "EMERGENCY EXERCISE SCENARIO/OBJECTIVES."
In addi tion, please send two copies directly to Battelle Pacific Northwest Laboratory, Attention:
Mr.
James
- Jamison, Emergency Preparedness
- Group, Health Physics Department, 2955 George Washington
- Way, Richland, WA
- 99352, in order to expedite the review process.
If you anticipate that the deadline will not be
- met, we recommend you use overnight mail.
The NRC emergency preparedness specialist responsible for evaluation of your exercise is Mr.
Thomas Tuccinardi.
Please identify the
- name, address and phone number of the individual on your staff with whom we should interface.
Your continued cooperation in this matter is greatly appreciated.
If you have any concerns or questions, please contact Mr. Tuccinardi at 215-337-5390.
Sincerely, OI'~g~ gg ~
William J. Lazarus, Chief Emergency Preparedness Section Division of Radiation 'Safety and Safeguards CC:
T.
E. Lempges, Vice President, Nuclear Generati'on T. Perkins, General Superintendent, Nuclear Generation W. Hansen, Manager of guality Assurance J.
A. Perry, Vice President, guality Assurance T.
Roman, Station Superintendent J. Aldrich, Supervisor, Operations W. Drews, Technical Superintendent Troy B. Conner, Jr.,
Esquire John M. Keib, Esquire Director, Power Division Thomas
- Chwalek, Emergency Preparedness Public Document Room (PDR)
Local. Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York
Niagara Mohawk Power Corporation bcc:
Region I Docket Room (with concurrences)
DRP Section Chief Robert J. Bores, DRSS P.
Gaul T. Tuccinardi RI:D Gau 3/go/87 RI:DRSS RI:DR Tuccinargj Lazarus 3/yo/87 /i 3/$ ]/87 OFFICIAL RECORD COPY
-C Jt