Text
Docket No.
50-410 ocr sosss Niagar'a Mohawk Power Corporation ATTN:
Mr. B.
G. Hooten Executive Director Nuclear Operations c/o Miss Catherine R. Seibert 300 Erie Boulevard, West
- Syracuse, New York 13202 Gentlemen:
Subject:
NRC Independent Measurements The NRC will perform an independent verification inspection at Nine Mile Point Nuclear Power Station, Unit 2 using the NRC Nondestructive Examination (NDE)
Van and contractor technicians under NRC direction.
Construction activities and materials will be sampled through nondestructive examinations as a supple-ment to our existing inspection efforts.
Similar nondestructive examinations by the NRC have been performed on a routine basis at yours and other construc-tion sites.
The inspection onsite wi 1,1 begin on December 9,
- 1985, and will conclude on December 20, 1985.
Welds will be selected by.the NRC Resident Inspector for examination by the NDE van team.
We request that documentation packages be prepared by your staff for the selected welds.,
Additional information on the requested document packages is provided in Attachment A. It is requested that all document packages be in the NRC Region I office by November 22, 1985.
The data packages will be reviewed by the Regional office for completeness and technical content.
We will update our NDE procedures to be consi stent and with your committed codes and standards.
All documentation supplied by your staff will be returned, upon request, at the conclusion of the inspection.
Members of your staff will be kept informed of our inspection progress and sig-nificant findings.
An exit meeting with you or members of your staff will be conducted on December 20,
- 1985, in accordance with our normal procedures.
The evaluation of examination results and preparation of an inspection report will be completed and the results of the inspection will be transmitted to you through the standard NRC inspection report.
Additional information relating to the NDE Van activities at your facility are discussed in Attachments B and C.
OFFICIAL RECORD COPY KERCH410 0001.0.0 10/24/85 951 i04O~iO ppgfg ppp ggOCK 0500>>>
6
f
Niagara Mohawk Power Corporation If you should have any further questions regarding this planned inspection, please contact the assigned Senior Resident Inspector, or Mr. James Wiggins at (215) 337-5198 of the NRC Region I Office.
Your cooperation in this matter is appreciated.
Sincerely,
~.Z S;nod>~.
Attachments:
As Stated Stewart D. Ebneter, Director Division of Reactor Safety cc w/attchs:
~Connor 5 Wetterhahn
~John W. Keib, Esquire
~.
- Quamme, NMP-2 Project Director
~ C.
~Department of Public Service, State of New York Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
~NRC Resident Inspector State of New York bcc w/attchs:
~egion I Docket Room (with concurrences) enior Operations Officer (w/o encl)
~. Linville, Chief, Section ¹2C, DRP
~. Grant, DRP
~Region I, SLO
/
RI:DRS Kerch iA<
RI:DRS Wiggins (b)~q RI: DRS OFFICIAL RECORD COPY KERCH410 0002.0.0 10/25/85
(
DATA PACKAGES ATTACHMENT A After the welds have been selected for NDE inspection, we request that you prepare a package conta'ining the following on each weld:
Inspection Report Weld History (gC History)
Material Certifications for base materials Weld Wire Certifications Piping drawings, isometric of welds locations NDE Reports on all NDE performed NDE Procedures for RT, PT, MT and VT Weld Procedures Bolt Torquing Procedures (Structural and Pipe Hangers)
Piping and Installation Procedure (only section that specifies code and addenda)
The assembled packages should be forwarded to:
US Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 ATTN:
Mr. Harry Kerch
SUPPLEMENTAL NDE VAN INFORMATION ATTACHMENT B 1.
NDE Van Su ort Re uirements Me request that the NRC-NDE Van be positioned as near as practicable to the containment area entrance to facilitate the performance of inspec-tions.
a.
The van requires the following connections while sited at your facility:
Site water with a garden hose connection this water is for film rinse.
Requirement for film rinse water drain (continual).
No chemical disposal will occur from the van without prior concurrence from appropriate licensee personnel.
At the end of the independent inspection, the NRC needs to dispose of the film developing chemicals prior to moving the van from the site.
Two 30 amp, 110 volt circuits are required for operation of the van.
b.
The van will contain PT and MT approve materials.
The team will need two rolls of your chemically approved tape and two approved markers for identifying welds and marking weld areas.
cd It will be necessary for you to remove the paint, rust or other mate-rial that could interfere with PT or MT on the selected welds.
- Also, we will need scaffolding erected and insulation removed for access.
2.
Administrative Information a.
The radiation source will be a nominal 100 curie IR-192 source.
This source is licensed by NRC, but owned by the NRC contractor.
b.
The names of the NRC and contractor NDE personnel will be supplied to you by Region I.
Clearance for these personnel is necessary.
Attachment B (Continued)
Me request that you hold a mini-radiation safety training course for the NRC NDE personnel.
This course should familiarize the personnel with your facility and procedures and should not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in length.
d.
A camera site pass will be needed for a Canon AE-1, 35 mm, camera, Serial No.
1969401.
e.
The NOE personnel will be using 5 watt Motorola radios on the site; the frequency used by the NRC is 165.6625 MHz.
SCOPE OF INSPECTION ATTACHMENT C The NDE van team wi 11 perform the following examinations and inspections as appropriate:
Radio ra h
Pipe butt and socket welds and other appropriate pressure boundary components.
Ultrasonics:
Flaw detection and material thickness measurements, as appropriate, of piping, welds, structural components,
- vessels, heat exchangers, bolts and other equip-ment.
Li uid.Penetrant:
Piping system components and structural elements.
Ma netic Particle Piping system components and structural elements.
Hardness Testin All of the previously listed components.
Windsor Probe:
Safety related concrete.
Delta Ferrite Indications Severn Ga e
Stainless steel welds.
A~11 A
Selected metallic components will have confirmatory chemical analysis performed.
Visual Examinations:
Weld quality and configuration verification of piping and structural systems.
ualit Records Review:
Welding documentation, materials and personnel certification, NDE records to include radiographs.
L
~
~