Text
ss AEcu
~4
i~
O
Vl
O~
V/4g
~O
++*++
Docket No. 50-410/85-28
UNITED STATES
NUCLEAR REGULATORY COMMISSION
WASHINGTON, O. C. 20555
Niagara
Mohawk Power Corporation
ATTN:
Mr. C. V. Mangan
Vice President
Nuclear Engineering
and Licensing
300 Erie Boulevard West
Syracuse,
13202
Gentlemen:
Subject:
NINE MILE POINT UNIT 2 PROJECT
AUDIT
0
RESULTS AND CORRECTIVE ACTIONS INSPECTION
REPORT 50-410/85-28
N.50
This letter c
er conveys
the results
and conclusions of the ins
audit results
and corrective actions of Niagara
Mohawk
P
(NMPC) Engineering Assurance
Audit No. 50 of Ni e
i e Point
nit
oj
Inspection
and Enforcement from August 12,
1985 to Au ust
16
19
e inspection
was conducted
b
the
NRC'tone
5 Webster Engineering Corporation's
(SWEC}
C
p
tion team was
compose
of
A
t t
f o
th
NRC
R
m
e
egion I office attended
the inspection exit
The inspection
team considers
a lar e numbe
rge
num er of the 'Action Items identified in
quately addressed
by
SWEC and do not require
pection
team considers
to be open
in
ac ment
1 to the enclosed
inspection report.
The
NRC inspection
team was concerned
over
T
ne
over the
number of hardware deficiencie
) t '
d'
n
e power
iscipline and over th
s
eficiencies brings into question
p o
g
lowing actions are being taken
First t
o a
ress
these
concerns
we
irst, the
SWEC audit team will submit
a supple-
identified in this inspection report,
2
the
s f
o
u i
eport
No.
50 which will address:
'1
N
por
,
(
)
e sa ety signi icance of any result
publication of Audit Report
No
50 and (4) an
y the
SWEC audit team since
anges,
action items closed out b
g
t
d th
N
M
1
Po t 2 p oJ
ere necessary
to further describe
o
ar ware c anges.
econ
, additional
review is being conducted
address
the effectiveness
of the pro ect's
d
i
iscip ine.
Last,
we expect the Phase
2 re o
eport to specifically
e proJect
s design checking
and verification process.
Attachments
2 and
3 of the enclosed
inspection re ort c
th
'o
NRC
'
previous
NRC inspections of the
NMP-2 engineering
8509200i25 850912
ADOCN, 050004l0
6
Pq
l
'4
Niagara
Mohawk Power Corporation
pectson
report provides
a discussion of the
Attachment
4 to the enclosed
ins
ons>
era
son given design related
items from the NRC's Construction Appraisal
p
'valuated
to determine whether resolution of
Your supplemental
re ort will be
open i ems
as
been
accomplished
and the results of Phase II of the
rogram will be assessed
by the staff to reach
an overall
adequacy
and implementation of the
d
project.
ion o
e
esign process for the Nine Mile Point
2
Sincerely,
Enclosure:
Implementation
Inspection
Report
cc w/enclosure:
See next page
~
~
~
~
~
~
Brian K. Grimes, Director
ivision of guality Assurance,
Vendor,
and Technical Training Center
Programs
Office of Inspection
and Enforcement
l~
~4
~
j
~
Niagara
Mohawk Power Corporation
0
cc w/enclosure:
Mr. Troy B. Conner, Jr.,
Esq.
Conner
E Wetterhahn
Suite
1050
174? Pennsylvania
Avenue,
N.W.
20006
Richard Goldsmith
Syracuse
University
College of Law
E. I. White Hall
Syracuse,
12223
Ezra I. Bialik
Assistant Attorney General
Environmental
Protection
Bureau
New York State
Department of Law
2 World Trade Center
10047
Resident
Inspector
Nine Mile Point Nuclear Power Station
P. 0.
Box 99
Lycoming,
13093
Mr. John
W; Keib, Esq.
Niagara
Mohawk Power Corporation
300 Erie Rn>>levard
West
Syracuse,
13202
Mr. James Linville
U.S. Nuclear Regulatory
Commission
Region I
631 Park Avenue
King of Prussia,
19406
Norman Rademacher
Licensing
Niagara
Mohawk Power Corporation
300 Erie Boulevard West
Syracuse,
13202
Mr. Thomas
E. Murley
U.S. Nuclear Regulatory
Commission
Region I
631 Park Avenue
King of Prussia,
19406
L
0
Niagara
Mohawk Power Corporation
DISTRIBUTION:
NRC
Local
JMTayl or
RHYo1 lmer
BKGrimes
JGPartlow
GTAnkrum
JLMilhoan
EVImbro
GSLewis
SDEbneter,
Region I
MHaughey,
HThompson,
RStarostecki,
Region I
TMNovak
WButler
EHylton
OELD
ACRS (10)
Regional Administrators
Regional Division Directors
TSpeis,
ELJordan
JAxelrad
Team Members
HBoulden,
OIA
SECY
OPE
WJDircks
HRDenton
OCA (3)
7Zca-Co~coa<<~<
GSLewis:esp
9/iO/85
IE:QAB
IE:QAB
IE:
B
R:I
I
IR/QAVT
EVImbro
JLMilhoan
GT
rum
~SEbneter JBK
imes
9/ro/8f
9//a/85
9
P/85
9/ru/85 P 9/ /I/85
~ N
4
4