Notification of 850807 Meeting W/Util in Bethesda,Md to Discuss Status of Licensing Issues for Facility & Organizational Changes
ML17054B765
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/16/1985
From: Haughey M
Office of Nuclear Reactor Regulation
To: Butler W
Office of Nuclear Reactor Regulation
References
NUDOCS 8507290024
Download: ML17054B765 (20)


Text

~p,g REGS (4

0 r+

i 4

0~

+>>*++

Docket No. 50-410 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 JUL 16 1985 MIEMORANDUM FOR:

Walter R. Butler Chief Licensing Branch No.

2 Division of Licensing FROM:

SUBJECT:

Mary F. Haughey, Project Manager Licensing Branch No. 2, Division of Licensing FORTHCOMING MEETING WITH NIAGARA liOHAWK POWER CORPORATIOtl (Nt1PC)

ON NINE MILE POINT 2 (NtiP-2)

DATE 5 TIME:

Wednesday, August 7, 1985 10 a.m.

LOCATION:

PURPOSE:

Phil 1 ips Building Room 144 7920 Norfolk Avenue

Bethesda, Maryland To discuss status of licensing issues for NMP-2 and NliPC organizational changes.

PART I C IPANTS*'RC W. Butler M. Haughey NMPC C. liangan A. Zallnick N. Rademacher cc:

See next page

/P~~j j. A~

Mary F. Haughey, oje llanager Licensing Branch No.

2 Division of Licensing

  • lleetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting StateIIIent of NRC Staff Policy",

43 Federal Pe ister 28058, 6/28/78.

07gq0024 05000010 ssov~~

pgR ggOCH pgR.'

f I

II J

Docket No. 50-410 MEMORANDUM FOR:

Walter R. Butler Chief Licensing Branch No.

2 Division of Licensing FROM:

SUBJECT:

DATE 5 TIME:

LOCATION:

PURPOSE:

Mary F. Haughey, Project Manager Licensing Branch No. 2, Division of Licensing'ORTHCOMING MEETING l(ITH NIAGARA MOHA1lK POHER CORPORATION (NMPC)

ON NINE MILE POINT 2 (NMP-2)

Ilednesday, August 7, 1985 10 a.m.

Phillips Building Room 144 7920 Norfolk Avenue

Bethesda, Maryland To discuss status of licensing issues for NMP-2 and NMPC organizational changes.

PARTICIPANTS*:

NRC M. Butler M. Haughey NMPC C. Mangan A. Zallnick N. Rademacher cc:

See next page Mary F. Haughey, Project Manager Licensing Branch No.

2 Division of Licensing

  • Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy",

43 Federal Re ister 28058, 6/28/78.

~7~cauC:

LB¹2/DkfP MHaughey:mk 7/t/ /85 LB¹2/DL/BC NButler 7/]~5

r I

P

~ "3 Nr. B. G. Hooten Niagara lhohawk Power Corporation Nine tlile Point Nuclear Station Unit 2 CC:

tir. Troy B. Conner, Jr.,

Esq.

Conner 4 'I'etterhahn Suite 1050 1747 Pennsylvania Avenue, N.l;.

llashinc ton, D.C.

20006 Regional AdministratoF; Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 15406 Richard Goldsmith Syracuse University College of Law E. I. Hhite Hall Campus

Syracuse, llew Yerk 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Nile Point Nuclear Power Station P. 0.

Box 99

Lycoming, New York 13093 Nr. John H. Keib, Esq.

t'iagara Viohawk Power Corporation 300 Erie Boulevard Hest

Syracuse, Hew York 13202 Nr. James Linville U. S. Nuclear Regulatory Commission Ref>ion I 631 Park Avenue King of Prussia, Pennsylvania 19406 horman Rademacher, Licensing Niagara l<ohawk Power Corporation 300 Erie Boulevard Hest
Syracuse, New York 13202

j'

NRC Partici ants bcc:

Appl icant 5 Servi ce List i Reeti qg Hpti CeS I'nternal Docket Fi.le' NRC PDR W. Butler Local PDR M. Haughey PRC System NSIC LB82 Reading HDenton/DEisenhut HThompson/FNiraglia TNovak BYoungblood WButler GKnighton EAdensam JZwolinski CGrimes GHolahan CThomas GLainas SVarga DVassallo Jlii 1 1 er JStol z JKnight, Acting Dir., DE llJohnston RBosnak, Acting, AD/CSE, DE RBernero LRubenstein 1IHouston DHuller TSpeis FSchroeder FRowsome TWRussell, Acting Dir.,

DHFS ACRS-16 OELD, Attorney Bordenick JPartlow BGrimes EJordan

FIngram, PA Receptionist (Only if meeting is held in Bethesda)

Project Manager Mar Hau he E. Hylton R ill

r

+>>

)

~

I

ggR Aseri Cy n

C

,O IlA O~

IP +**++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C, 20555 September 27, 1985 DOCKET No, 5(} 412 A

MEMORANDUMFOR:

John Phillips, Chief Rules and Procedures

Branch, ADM FROM:

Office of Nuclear Reactor Regulation

SUBJECT:

DUQUESNE LIGHT COMPANY, ET AL BEAVER VALLEY UNIT 2, One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies

(

5

) of the Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s):

Time for Submission of Views on Antitrust Matters.

Notice of Consideration of Issuance of Amendment to Facility Operating License.

Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

Notice of Availabilityof NRC DraftiFinal Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availabilityof Safety "Evaluation Report.

Notice of Issuance of Construction Permit(s),

Notice of Issuance of Facility Operating License(s) or Amendment(s).

Order.

Exemption.

Notice of Granting of Relief.

Q Other:

Office of Nuclear Reactor Regulation orrica )

SURNAMC P DATN

Enclosure:

As stated OFFICIAL RECORD COPY

, 'tl l,

t I 4

I'I, t

L

(

r J

I

UNITED STATES NUCLEAR REGULATORY COMMISSION DUQUESNE LIGHT COMPANY, ET AL.

BEAVER VALLEY UNIT 2 DOCKET NO. 50-412 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (the Commission) is considering issuance of an Exemption from a portion of the requirements of General Design Criterion (GDC) 4

( 10 CFR 50, Appendix A) to the applicants* for Beaver Valley Unit 2, located at the applicantsite in Beaver County, Pennsylvania.

ENVIRONMENTAL ASSESSMENT:

Identification of Pro osed Action:

The Exemption would permit the applicants not to install the pipe whip restraints and jet impingement shields and not to consider the dynamic effects associated with postulated pipe breaks in the Beaver Valley Unit 2 primary coolant system, on the basis of advance calculational methods for assuring that piping stresses would not result in rapid piping failure; i.e., pipe breaks.

  • The applicants are Duquesne Light Company, Ohio Edison
Company, the Cleveland Illuminating Company and the Toledo Edison Company.

0 0

Need for Pro osed Action:

The proposed Exemption is needed in order for the applicants not to consider the dynamic loading effects associated with the postulated full flow circumferential and longitudinal pipe ruptures in the main loop primary coolant system.

These dynamic loading effects include pipe whip, jet impingement, asymmetric pressurization transients and break associated dynamic transients in unbroken portions of the main loop and connected branch lines.

Therefore, the applicants would not be required to install protective devices such as pipe whip restraints and jet impingement shields related to postulated break locations in the primary coolant loops.

Analysis shows that the pipe breaks, which these devices are designed to protect against, are extremely unlikely.

On the other hand, the presence of these devices increase.inservice inspection time in the containment and their elimination would lessen the occupational doses to workers and facilitate inservice inspections.

GDC 4 requires that structures, systems and components important to safety shall be appropriately protected against dynamic effects including the effects of discharging fluids that may result from equipment failures, up to and including a double-ended rupture of the largest pipe in the reactor coolant system (Definition of LOCA).

In recent submittals the applicants have provided information to show by advanced fracture mechanics techniques that the detection of small flaws by either inservice inspection or leakage monitoring systems is assured long before flaws in the piping materials can grow to critical or unstable sizes which could lead to large break areas such as the double-ended guillotine'break or its equivalent.

The NRC staff has reviewed and accepted the applicants'onclusion.

Therefore, the NRC staff

0 agrees that double-ended guillotine break in the primary pressure coolant loop piping, and its associated dynamic effects, need not be required as a

design basis accident for pipe whip restraints and jet shields; i.e., the restraints and jet shields are not needed.

Accordingly, the NRC staff agrees that a partial exemption from GDC 4 is appropriate.

Environmental Im act of the Pro osed Action:

The proposed Exemption would not affect the environmental impact of the facility.

No credit is given for the restraints and shields to be eliminated in calculating accident doses to the environment.

While the jet impingement barriers and pipe whip restraints would minimize the damage from jet forces and whipping from a broken pipe, the calculated limitation on stresses required to support this Exemption assures that the probability of pipe breaks which could give rise to such forces are extremely small; thus, the pipe whip restraints and jet shield would have no significant effect on the overall plant accident risk.

The Exemption does not otherwise affect radiological plant effluents.

Likewise, the relief granted does not affect non-radiological plant effluents, and has no other environmental impact.

The elimination of the pipe whip restraints and jet impingement shields would tend to lessen the occupational doses to workers inside containment.

Therefore, the Commission concludes that there are no significant radiological or non-radiological impacts associated with the Exemption.

The proposed Exemption involves design features located entirely within the restricted area as defined in 10 CFR 20.

It does not affect plant non-radioactive effluents and has no other environmental impact.

Therefore, the Commission concludes that there are no non-radiological impacts associated with this proposed Exemption.

Since we have concluded that there are no measurable negative environmental 4

impacts associated with this Exemption, any alternatives wouldnot provide any significant additional protection of the environment.

The alternative to the exemption would be to require literal compliance with GDC 4.

Alternative Use of Resources:

This action does not involve the use of resources not previously considered in the Final Environmental Statement (Operating License) for Beaver Valley Unit 2.

A encies.and Persons Contacted:

The NRC staff reviewed the applicants'equest and applicable documents referenced therein that support this Exemption for Beaver Valley Unit 2.

The NRC did not consult other agencies or persons.

FINDING OF NO'SIGNIFICANT IMPACT The Commission has determined not to prepare an environmental impact statement for this action.

Based upon the environmental assessment, we conclude that this action will not have a significant effect on the quality of the human environment.

For details with respect to this action, see the requests for exemption dated February 24, May 31, July 16, and November 5,

1984, and July 9, 1985.

These documents, utilized in the NRC staff's technical evaluation of the exemption request, are available for public inspection at the Commission's Public Document

Room, 1717 H Street, N.W., Washington, D.C.,

and at the Local Public Document Room at the B. F. Jones Memorial Library, 663 Franklin Avenue,

Aliquippa, Pennsylvania 15001.

The staff's technical evaluation of the request will be published with the exemption (if the exemption is granted) and will also be available for inspection at both locations listed above.

Dated at Bethesda, Maryland this 26-day of September, 1985.

FOR THE NUCLEAR REGULATORY COMMISSION

~

~

~

omas M. Novak, Assistant Director for Licensing Division of Licensing

0 C