Forwards Engineering Assurance In-Depth Technical Audit Implementation Insp Rept 50-410/85-18 on 850521-24.Corporate Procedures,Design Guides & Computer Codes Accepted W/O Verification Against Regulatory Design Requirements
ML17054B728
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/17/1985
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Mangan C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17054B729 List:
References
NUDOCS 8506260713
Download: ML17054B728 (8)


See also: IR 05000410/1985018

Text

S Re<o

(4

P

+

0

Cy

1

O

IIA

0 ~

ip

~O

+ )I.**+

UNITFD STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555

Docket No. 50-410/85-18

4IH l7 1985

Niagara

Mohawk Power Corporation

ATTN:

Mr.

C.

V.

Mangan

Vice President

Nuclear Engineering

and Licensing

300 Erie Boulevard West

Syracuse,

NY

13202

Gentlemen:

Subject:

Nine Mile Point

2 Engineering Assurance

Program

(EAP) Technical

Audit Implementation Inspection

Report 50-410/85-18

This letter conveys the results of the program plan implementation inspection

of the Niagara

Mohawk Power Corporation's

(NMPC)

EA Technical Audit (Ref.

NMPC

Program for Completion of the Engineering

Assurance

In-Depth

Technical Audits

- Nine Mile Point 2 Project

EA-106 Revision

1 dated April 18,

1985) of the Nine

Mile Point

2 Project.

The inspection

was conducted

by the NRC's Office of

Inspection

and Enforcement.

The team

was

composed of personnel

from NRC's

Office of Inspection

and Enforcement

and consultants.

A representative

from

the

NRC Region I office attended

the inspection exit meeting.

The NRC's

inspection of implementation of the program plan and procedures

for the In-Depth

Technical Audit was conducted at the site of the audit at the Stone

8 Webster

Engineering Corporation's

(SWEC) Cherry Hill Operations

Center in Cherry Hill, N.J..

The inspection

took place from May 21, l985 to May 24,

1985.

The NRC's implementation inspection of the

EA Technical Audit of Nine Mile

Point 2 was organized into the five major disciplines involved; viz, mechanical

systems,

mechanical

components,

civil/structural, electric power, instrumentation

and controls.

In each of these

areas,

the

NRC inspectors

assessed

whether

the

audit was being conducted

in accordance

with the approved

program plan and

supporting procedures

and whether the audit was being conducted

in sufficient

technical

depth

and detail to be

an acceptable

mechanism for providing additional

assurance

that the design of the Nine Mile Point Unit 2 complies with all

licensing commitments

and regulatory requirements.

The most significant item identified by the

NRC Inspection

Team

on the imple-

mentation of the Nine Mile Point

2 Engineering Assurance

Technical Audit

Program

was that in some instances

the review was not conducted

in a sufficiently

comprehensive

manner.

Specifically, i n some instances:

0

Corporate

procedures,

design guides,

and computer

codes

were accepted

by the

EA Team Auditors without verification against regulatory design

requirements

or commitments.

85062607i3 850bi7

PDR

ADOCN, 050004i0

PDR

I

~

4

0

Mr. C. V. Mangan

EA Team Auditors were making judgements

as to the design

adequacy

without requesting justification from SWEC project personnel

concerning

generic aspects

of the design process.

Potential

action items were informally presented

to project personnel

by

EA Team Auditors for comment prior to formally preparing

an action

item.

This is not in accordance

with audit procedures.

Specific comments of the

NRC inspection

team are provided in Attachment I to

the enclosed

Implementation

Inspection Report.

The

NRC inspection

team has

been

informed that corrective actions

on many of

the areas identified in the enclosed

Implementation

Inspection

Report are already

in process

by the

EA Audit Team.

In this regard,

we understand

the audit schedule

has

been extended

to better ensure that the objectives of the audit are met.

A

will be

formal response

to the above concerns

is not required.

The final

a d't

t

u i

repor

wi

e examined to determine whether resolution of these

items

has

been accomplished.

The report

number for the Nine Mile Point

2 Engineering

Assurance

Program

(EAP)

Technical Audit and guality Assurance

Preparation

Inspection Report dated

May

10,

1985 should

be changed to read 50-410/85-l4.

Sincerely,

Enclosure:

Implementation

Inspection

Report

cc:

See next page

Brian K. Grimes, Director

Division of guality Assurance,

Yendor,

and Technical Training Center

Programs

Office of Inspection

and Enforcement

f

Mr.

C.

V. Mangan

-3-

CC:

Mr. Troy B. Conner, Jr.,

Esq.

Conner

& Wetterhahn

Suite

1050

1747 Pennsylvania

Avenue,

N.W.

Washington,

DC

20006

Richard Goldsmith

Syracuse

Univers ity

College of Law

E. I. White Hall

Syracuse,

New York

12223

Ezra I. Bialik

Assistant Attorney General

Environmental

Protection

Bureau

New York State

Department of Law

2 World Trade Center

New York,

New York

10047

Resident

Inspector

Nine Mile Point Nuclear

Power Station

P.O.

Box 99

Lycoming,

New York

13093

Mr. John

W. Keib,

Esq.

Niagara

Mohawk Power Corporation

300 Erie Boulevard West

Syracuse,

New York

13202

James Linville

U.S.

Nuclear Regulatory

Commission

Region I

631 Park Avenue

King of Prussia,

Pennsylvania

19406

Norman Rademacher,

Licensing

Niagara

Mohawk Power Corporation

300 Erie Boulevard West

Syracuse,

New York

13202

Mr. Thomas

E. Murley

U.S.

Nuclear Regulatory

Commission

Region I

631 Park Avenue

King of Prussia,

Pennsylvania

19406

Mr.

CD

V. Mangan

Distribution

v",rr

R.

H. Vollmer, IE

B.

K. Grimes,

IE

J.

G. Partlow,

IE

G. T. Ankrum, IE

J.

L. Milhoan, IE

E.

V. Imbro, IE

G.

S.

Lewis, IE

S.

D. Ebneter,

RI

M. Haughey,

NRR

DCS 016 (Docket No. 50-410)

NRC

PDR

Local

PDR

H.'hompson,

NRR

T.

E. Murley, RI

R. Starostecki,

RI

T.

M. Novak,

NRR

M. Butler,

NRR

E. Hylton,

NRR

AEOD

OELD

NMSS

RES

ACRS (10)

NSIC

NTIS

Regional Administrators

Regional Division Directors

'T. Speis,

NRR

E.

L. Jordan,

IE

J. Axelrad,

IE

Team Members

H. Boulden,

OIA

SECY

OPE

M. J. Dircks,

EDO

H.

R. Denton,

NRR

OCA (3)

IC4)A4':QAB

IE:BQAVT:QAB

gBL

GSLewis:hmc

VImbro

06/l4

5

06/I~05

AVl:gAB

il oan

0 /i

85

g VT:QAB:C

Akum

06 /

85

<<e

Region I

SEbneter

06/]4/85

1

6/~g/85

~

g

Jr.

i--J