ML17054B698

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation of 840814 Util Submittal Re Potential Effects of Turbine Missiles.Ge Reassessment of Insp Intervals & Provision of long-term Schedule After Evaluation of 1982 Insp Results Acceptable
ML17054B698
Person / Time
Site: Nine Mile Point 
Issue date: 05/29/1985
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Hooten B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17054B699 List:
References
RTR-REGGD-01.115, RTR-REGGD-1.115 NUDOCS 8506170633
Download: ML17054B698 (4)


Text

May 29, 1985 Docket No. 50-220 Mr. B.

G. Hooten Executive Director, Nuclear Operations Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202

Dear Mr. Hooten:

SUBJECT:

SAFETY EVALUATION, TURBINE MISSILE PROTECTION Re:

Nine Mile Point Nuclear Station, Unit No.

1

.DISTRIBUTION Docket File(

NRC PDR Local PDR ORB¹2 Reading HThompson OELD SNorris RHermann ELJordan JPartlow BGrimes ACRS (10)

Gray File By letter dated August 14, 1984 you submitted the potential effects of turbine missiles at Nine Mile Point, Unit No. 1.

We have completed our review and find that your evaluation has satisfied applicable Regulatory Guides and Standard Review Plans, regarding the turbine missile issue.

To limit the potential turbine missile generation, General Electric, manufacturer of the Nine Mile Point, Unit No.

1 turbine, recommended that the turbine be inspected at a six year interval.

Your next major inspection is scheduled in 1988.

We understand that General Electric is reassessing its recommendations and intends to provide you a long-term inspection schedule after the evaluation of 1982 inspection results is completed.

We find this acceptable.

A copy of our Safety Evaluation is enclosed.

Sincerely,

Enclosure:

As stated cc w/enclosure:

See next page Domenic B. Vassallo, Chief Operating Reactors Branch ¹2 Division of Licensing DL:ORB¹2 DL:QQ¹2

'Nor~s:ajs RHemnn 05/g8/85 05/gg /85 DL.

B¹2 DVassallo 05/g f/85 8506170h33 850529 PDR ADOCK 05000220 P

PDR

E7

Mr'. B. h. Hooten

'iaqara Mohawk Power Corporation Nine Mile Point Nuclear Station, Unit No.

1 CC:

Troy B. Conner, Jr., Esquire Conner

& Wetterhahn Suite 1050 1747 Pennsylvania

Avenue, N.

W.

Washington, D. C.

20006 Frank R. Church, Supervisor Town of Scriba R.

D. 82

Oswego, New York 13126 Niagara Mohawk Power Corporation ATTN:

Mr. Thomas Perkins Plant Superintendent Nine Mile Point Nuclear Station Post Office Box 32

Lycoming, New York 13093 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 126
Lycoming, New York 13093 John W. Keib, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Thomas A. Murley Regional Administrator Region I Office U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Jay Dunkleberger Division of Policy Analysis and Planning New York State Energy Office Agency Building 2 Empire State Plaza
Albany, New York 12223