ML17054B667
| ML17054B667 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/20/1985 |
| From: | Butler W Office of Nuclear Reactor Regulation |
| To: | Hooten B NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17054B668 | List: |
| References | |
| NUDOCS 8506030120 | |
| Download: ML17054B667 (2) | |
Text
/
e Docket No.:
50-410 gg ROSS Nr. B.
G. Hooten Executive Director, Nuclear Operations Niagara tlohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202
Dear Nr. Hooten:
SUBJECT:
CHANGE OF QUALITY ASSURANCE CATEGORY FOR THE REFUELING PLATFORM ASSEMBLY In a letter from C. V. Nangan to A. Schwencer on February 25, 1985 you provided a justification for changing the quality assurance (QA) category foe the refueling platform assembly from Category I to Category II as defined in the Nine Nile Point Unit 2 Quality Assurance Program for Construction submitted June 10, 1983.
The revision in QA category for the refueling platform assembly is acceptable as discussed in you letter of February 25, 1985.
Sincerely, cc:
See next page Walter R. Butler, Chief Licensing Branch No.
2 Division of Licensing DISTRIBUTION DDDFi NRC PDR Local PDR PRC System NSIC LB¹2 Reading EHylton ttHaughey BBordenick, OELD ACRS (16)
JPartlow BGrimes 850b030120 850520 EJordan PDR ADOCK PDR A
- Previously co 4:
- LB¹2/DL LB g/DL
- QAB/IE
- QAB/IE
- t1EB/NRR llHaughey:dh WButler JSpraul TAnkrum RKirkwood 05/15/85 05//T85 05/15/85 05/15/85 05/17/85
- t<EB/NRR FCherny 05/17/85
- ASB/NRR ASingh 05/17/85
- ASB/NRR OParr 05/17/85
f 4