Summary of 850103 Meeting W/Applicant & S&W in Bethesda,Md Re Compliance W/Gdc 51 & Break Analysis of Reactor Water Cleanup Line
ML17054B413
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/11/1985
From: Haughey M
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8502210024
Download: ML17054B413 (8)


Text

Docket No.:

50-410 APPLICANT:

Niagara Mohawk Power Corporation (NMPC)

FACILITY:

Nine Mile Point Nuclear Station, Unit 2 (NMP-2)

SUBJECT'UMMARY OF MEETING WITH NMPC CONCERNING NMP-2 COMPLIANCE WITH GDC 51 AND BREAK ANALYSIS OF THE REACTOR WATER CLEANUP LINE On January 3, 1985, the NRC staff met with representatives from NMPC, as well as representatives from Stone and Webster Engineering Corporation (SWEC) in Bethesda, Maryland.

Two topics were discussed:

NMP-2 compliance with GDC 51 and break analysis of the reactor water cleanup (RCWU) line.

The December 3, 1984, submittal on GDC 51 from NMPC was used as a basis for discussion for NMP-2 compliance.

Additional information necessary for the NRC to complete its review was identified.

This information included:

1)

CMTR for penetration 2-14 fluid head 2) discussion of mill practices and heat treatment for SA 106 grade piping (CSH pipe, HPCS injection line) 3)

PLSMT of CSH, ASME III class 2, between HPCS test isolation valve and the HPCS test throttling valve should be 70'F instead of 107'F 4)

CSH sockolets/weldolets (item 4k) - confirmation that these components will not see less than 69'F under pressure.

On December 12, 1984,NMPC, in response to a staff concern, submitted a

discussion on the use of break exclusion zone for the reactor water clean-up (RWCU) line.

The NRC staff discussed the purpose of break exclusion and stated that use of break exclusion for this line is inappropriate.

A break should be postulated at least at the junction of the feedwater line and the RWCU line as experience has shown this to be a high stress point.

Pipe whip and jet impingement should be considered.

A list of meeting attendees is Enclosed.

85022iooa4 850aii PDR ADOCK 050004i0 PDR j

Mary F. Haughey, Project Manager Licensing Branch No.

2 Division of Licensing

Enclosure:

As stated cc:

See next pa e

fit DL LBO /DL gory aughey:dh ASchv neer

/g /85 Q/

/85 DISTRIBUTION

NRC PDR Local PDR PRC System NSIC LB82 Reading BBordenick ASchwencer MHaughey EHylton

I 4

~

)I I

I i AS>" ~

Q))>>'( )~

v'>>

Wl )4

)I I'

V CW I

1 J

r 4>>

4 V

)

4 V

) )

I')

W tt

.r I>>

IF>>

I 11 'll

'4>>

W it 1

I 1

h I 1"ll I I'l(W,'

4 tr'4 I"

- I l.

1

'4 (Wh

( ~

I 4 I

'J

')

4 4 ~ '

<<h

),

J.C CP,<<J,>>

Jh r

t>>4 )4),,ra W>>1 WC)

I,

)t'WW t ')I F$ '"

' V>> y ',J)

) (

~

4 II f

~

P

. 14 VJ'")$'ll

>>g

~ "I, Jl 1

rli>> I)

>>C)

>>C

)

I' I

tl

)'lt 5'

i W

$ I;

'W>>WJ IF I'I)

IVV

~

~

,>>Jt)

] 1 tl f

,h, J ~ >>]

)

1

~

I IICFJ""'>>"

~JW I

l t

<<1>>,'"

1 I) 1~

~ ih CWP 4th

<<,4

,~a R~a>,

Wp O~

Cy O

IIA O~

cT v

Q~

4p k~*y+

Docket No.:

50-410 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 APPLICANT:

Niagara Mohawk Power Corporation (NMPC)

FACILITY:

Nine Mile Point Nuclear Station, Unit 2 (NMP-2)

SUBJECT'UMMARY OF MEETING WITH NMPC CONCERNING NMP-2 COMPLIANCE WITH GDC 51 AND BREAK ANALYSIS OF THE REACTOR WATER CLEANUP LINE On January 3, 1985, the NRC staff met with representatives from NMPC, as well as representatives from Stone and Webster Engineering Corporation (SWEC) in Bethesda, Maryland.

Two topics were discussed:

,NMP-2 compliance with GDC 51 and break analysis of the reactor water cleanup (RCWU) line.

The December 3, 1984, submittal on GDC 51 from NMPC was used as a basis for discussion for NMP-2 compliance.

Additional information necessary for the NRC to complete its review was identified.

This information included:

1)

CMTR for penetration 2-14 fluid head 2) discussion of mill practices and heat treatment for SA 106 grade piping (CSH pipe, HPCS injection line) 3)

PLSMT of CSH, ASME III class 2, between HPCS test isolation valve and the HPCS test throttling valve should be 70'F instead of 107'F 4)

CSH sockolets/weldolets (item 4k) - confirmation that these components will not see less than 69'F under pressure.

On December 12, 1984,NMPC, in response to a staff concern, submitted a

discussion on the use of break exclusion zone for the reactor water clean-up (RWCU) line.

The NRC staff discussed the purpose of break exclusion and stated that use of break exclusion for this line is inappropriate.

A break should be postulated at least at the junction of the feedwater line and the RWCU line as experience has shown this to be a high stress point.

Pipe whip and jet impingement should be considered.

A list of meeting attendees is Enclosed.

Enclosure:

As stated cc:

See next page a y F.

a ghey, Project Manager

~

~

~

Licensing ranch No.

2 Division of Licensing

F

Nine Hile Point 2 Hr. B. G. Hooten Executive Director, Nuclear Operations Niagara Hohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202 CC:

Hr. Troy B. Conner, Jr.,

Esq.

Conner 5 Wetterhahn Suite 1050 1747 Pennsylvania

Avenue, N.W.

Washington, D.C.

20006 Richard Goldsmith Syracuse University College of Law E. I. White Ha'll Campus

Syracuse, New York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Hile Point Nuclear Power Station P. 0.

Box 99

Lycoming, New York 13093 Hr. John W. Keib, Esq.

Niagara Hohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202 Jay H. Gutierrez, Eso.

U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Norman Rademacher, Licensing Niagara Hohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202

r

Enclosure ATTENDANCE AT MEETING WITH NMPC ON NINE MILE POINT 2 JANUARY 3, 1985 NAME Mary Haughey Donald L. Hill Donald L. Praegt Norm Rademacher Robert Hammelmann B. D. Liaw R. H. Pinney A. Schwencer J. Halapatz D. A. Boe N. Rapagnani R. Upadhyay W. Wang F. Delmendo M. K. Allen ORGANIZATION NRC NMPC NMPC NMPC NMPC NRC SWEC NRC NRC SWEC SWEC SWEC SWEC SWEC SWEC