Docket No. 50-410 SFP 17 1984 Mr; B. G. Hooten Executive Director,'uclear Operations Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202
Dear Mr. Hooten:
SUBJECT:
NINE MILE POINT 2 TECHNICAL SPECIFICATIONS Enclosed is a copy of the Boiling llater Reactor-5, Standard Technical Specification (STS) for use in developing the Nine Mile Point 2 Technical Specifications.
The following process should be followed in developing the Nine Mile Point 2 plant specific technical specifications:
1.
Review the STS document enclosed and a.
identify non-applicable portions of the document, b.
identify those areas where specifications are required but are not provided in the STS and, c.
provide the applicable information (where indicated) required to complete the STS.
2.
Upon receipt of your marked-copy of the STS, the NRC staff will prepare draft plant-specific technical specifications.
Since some plant-specific information will not be available when the marked-up STS are submitted, several meetings will be held to obtain the missing information and to resolve possible differences of opinion between the NRC staff and your staff.
3.
The NRC staff will then prepare the Proof and Review version of the plant-specific technical specifications.
This version will be issued for NRC staff (including Region
- 1) and PSESG review approximately 3-4 months prior to OL issuance.
Comments on the Proof and Review version will be resolved and the staff will prepare the Final Draft version of the plant-specific technical specifications.
The Final Draft version constitutes the technical specifications the staff PDR A2D7O0259 840917 A
ADOCK 05000410 PDR
l t
F li
'f I
II P
E h
I lj lrt S
expects to issue with the OL.
Thirty days prior to the expected date of OL issuance, you will be provided with the Final Draft version.
At that time you will be requested to review the Final Draft version and certify, by affadavit, that it accurately reflects the as-built plant and the FSAR.
lie will also require you to formally request any changes to the Final Draft technical specifications.
The plant-specific technical specifications will subsequently be issued as Appendix A to the OL.
If you have any questions, please contact the Licensing Project Manager, Mary Haughey (301) 492-7897.
Sincerely, A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing Enclosure As.stated LBg2/DL PM LBg2/DL/BC MHaughey/lb ASchwencer 9//g/84 9/)g84 Distribution:
w/o Enclosure
'0DDFi NRC PDR Local PDR PRC System NSIC LB82 Reading EHylton MHaughey BBordenick ACRS {16)
,EJordan NGrace DHoffman
sg h
g
~
h 1 1 ~
h
)
/(h 1
~
w/o Enclosure Nine Mile Point 2
Mr. B.
G. Hooten Executive Director, Nuclear Operations Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 CC:
Mr. Troy B. Conner, Jr.,
Esq.
Conner 6 Wetterhahn Suite 1050 1747 Pennsylvania
- Avenue, N.W.
Washington, D.C.
20006 Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus Syracuse,.New York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau Hew York State Department of Law 2 World Trade Center New York, Hew York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.
Box 99
- Lycoming, New York 13093 Mr. John W. Keib, Esq.
Niagara Mohawk Power Corporation 300 Erie BoUl evard West
- Syracuse, Hew York 13202 Jay M..Gutierrez, Esq.
U. S. Nuclear Regulatory Cormnission Region I
631 Park Avenue Ving of Prussa, Pennsylvania 19406 I
Norman Rademacher, Licensing Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, Hew York 13202