Docket No. '50-410 PEP g1 1S84 APPLICANT:
Niagara Mohawk Power Corporation k
'FACILITY:
Nine Mile Point Nucle'ar Station Unit 2 SUBJECT Enclosure 2 contains a list of meeting attendees.
SUMMARY
OF SITE TOUR AND MEETING AT NINE MILE POINT 2 REACTOR AND AUXILIARYSYSTEMS On August 27 and 28, 1984 the NRC staff met with representatives of Niagara Mohawk Power Corporatio'n (NMPC) and Stone and Webster Engineering Corp.
(SPEC) at the Nine Mile Point 2 site.
The staff toured the reactor and auxiliary systems at the site on August 27.
On August 28 the staff met with NMPC and SWEC to discuss the status of the open, items in the draft SER in the area of Auxiliary Systems.
A summary of that discussion is contained in enclosure 1.
Enclosures:
As stated Mary F. Haughey, Project Manager Licensing Branch No.
2 Division of Licensing Distribution:
ocet s e' NRC PDR Local PDR PRC System NSIC LB82 Reading PShuttleworth MHaughey Bordenick ACRS (16)
EJordan NGrace cc:
A. Singh J. llermeil K. Desai LB82/~/ LB DL/BC MHaughey/lb ASchwencer 9/gP/84 9/ [i/84 g~0+~90~~~05000gf0 g409ii pgR ADQCY 0
@gal E
J J
lt
Enclosure 1
Summary of Status of Open Items from the Draft SER in the Area of Auxiliary Systems
~0en item ¹ 20 21 61,62 72
Response
acceptable NRC to review Appendix 3C to FSAR Amendment 13 NMPC'hould make a commitment to the BWR Owner's Group recommendations for pipe break in the BWR Scram system.
NRC action is to complete the generic review of the BWR Owner's Group recommendations.
NMPC to verify that the FSAR is'onsistent in using 3.6 w/o U-235 enrichment and respond to this open item formally.
73 74
Response
acceptable Under NRC review In addition, there is a concern in the heavy loads area about the difficulty of lighting shield plugs.
NRC will document this concern in a letter to NMPC.
75 NRC to verify that c'orbicula,are not a concern in Lake Ontario.
76,77 This FSAR section has had substantial revisions.
As a result, the response to question 410.34 is no longer in section 9.3. 1 as referenced.
NMPC to revise.response to include the committment to ANSI MC 11.1-1976.
78,80 NRC to review Appendix 3C to FSAR Amendment 13.
81,82,83 Under NRC review 85,86 87 100 Under NRC review
Response
acceptable
Response
acceptabl.e FSAR Section 3.4 to be revised to clarify that concern has been reviewed and is not a problem.
Enclosure 2
August 27 II 28 Nine Nile Point 2 Meeting and Site Tour of Auxiliary and Reactor Systems NRC M. Haughey J.
'iJermiel A. Singh K. Desai NNPC N. Kademacher A. 2allnick D. Scobell D. Pracht SMEC MMMl1 en M. Nojibian J. Sternchos R. Pinney
I
Nine Nile Point 2
Hr. B.
G. Mooten Executive Director, Nuclear Operations
,Niagara Hohawk Power Corporation 300 Erie Boulevard West
- Syracuse, Hew York 13202 CC:
ter. Troy B. Conner, Jr.,
Esq.
Conner 5 Wetterhahn Suite 1050 1747 Pennsylvania
- Avenue, N.W.
Washington, D.C.
20006 Richard Goldsmith Syracuse University College. of Law E. I. White Mall Campus
- Syracuse, New York 12223 Ezra I. Bialik Assistant 'Attorney General Environmental Protection-Bureau Hew York State Department of Law
,2 World Trade Center New York, Hew York 10047 Resident Inspector Nine Nile Point Nuclear Power Station P. 0.
Box 99
- Lycoming, New York 13093 Hr. John W. Keib, Esq.
Hiagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, Hew York 13202 Jay Yi. Gutierrez, Esq.
U. S. Nuclear Regulatory Commission Region I
631 Park Avenue King of Prussa, Pennsylvania 19406 Norman Rademacher, Licensing Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, Hew York 13202
~ '
>q 0
pi