Docket No. 50-220 DEC 5-t983 Niagara Mohawk Power Corporation ATTN:
ter.
G. K. Rhode Senior Vice President 300 Erie Boulevard liest
- Syracuse, New York 13202 Gentlemen:
SUBJECT:
10 CFR 170 FEES FOR FIRE PROTECTION REVIEllS AND APPROVALS FOR NINE t1ILE POINT NUCLEAR STATION The purpose of this letter is to address the fee requirements of 10 CFR 170 as they relate to actions pertaining to the fire protection requirements of 10 CFR 50.
On February 17, 1981, 10 CFR 50.48 and Appendix R. which added fire protection requirements for operating nuclear power plants, became effective.
Prior to that date, fees were exempted for the review and approv-al of fire protection actions based on Branch Technical Position BTP APCSB 9.5-1 and its Appendix A.
Since the February 1981 amendment of 10 CFR 50, there have been a number of requests filed by licensees for their plants.
These requests consist of exemptions from schedular and other requirements, and other reviews {e.g., alternate safe shutdown capability).
It is current'NRC policy to exempt from fees all of'the fire protection ex-emptions granted pursuant to 10 CFR 50.12 by the staff of the Division of Licensing {DL) unless a license amendment or other approval is also required.
On this basis, fees have not been requested for any of these types of exemp-tions.
Fees will be charged for all other approvals and denials relating to fire protection.
This means that the review and approval of the alternate safe shutdown capability and any reviews which result in a denial of a re-quest for your facility are subject to fees pursuant to 10 CFR 170.22.
A DL letter dated November 24, 1980, informed all reactor licensees with plants licensed prior to January 1. 1979, that fees were required for re-quests for Commission action resulting from the fire protection rule.
Based on a review of the fire protection requests filed by your company for the subject facility, we find that a total of $4.000 is required.
The en-closed list reflects each request.
any fees paid, fees due, and the DL staff's 83i2i403i0 83i205 PDR ADOCK 05000220 F
PDR ORRICC~
SVRNAMII1A OATS'RC FORM 318 {10 80) NRCM 0240
~
~
~
~
OFFICIAL RECORD COPY
E
~
e~
E
fee determination and action on each.
It is requested that your company re-mit $4,000 to our office for fees currently due on your fire protection re-quest.
Fees for any future approvals by the DL staff on pending applications currently on file and any subsequent requests by your company under the current 10 CFR 170 will be in accordance with the position set forth in this letter.
For those portions of all applications on the enclosed list which were approved pursuant to 10 CFR 50.12.
we have concluded that an exemption. pursuant to 10 CFR 170.11(b), from the fee requirements is authorized by law and such exemption is otherwise in the public interest and is hereby granted for them.
If for some reason our list does not include all fire protection requests that your company has on file with the DL staff, we will address the excluded ones in a later letter if fees are required. If they'are approved totally pursuant to 10 CFR 50.12, they will be exempted from fees, but an additional letter will not be sent to you unless required otherwise (e.g., fees paid and.refund has to be made).
~ Sincerely.
Enclosure:
List of Applications and Fees.
Original Signed by" XV~.O. naii0r Ihlliam 0. Miller, Chief License Fee Management Branch Office of Administration DISTRIBUTION w enclosure:
PDR LPDR R.
- Hermann, ORB-2 S. Norris, ORB-2 Regulatory Docket File (record cy.)
H.,Smith, ORB-5 T.
- Wambach, ORB-5 R. Diggs, LFMB LFMB Reactor File LFMB Pending Check File LFMB R/F OFFICE P SURNAME OATEN LF RM eggs:rmf 11/ P~ /83 LFMB'A CJ way lP. P
/83 LFMB:ADM MOMiller
~+
/83 NRC FORM 318 (10.80) NRCM 0240 OFFICIAL RECORD COPY
4
~ ~ 4 ll 4
4 E)'
4 4
4*r I
4 4
4 I
1 44
~
1 lfr,.
- g 4
'IIV 4
~
4
~
~
4 4
f f
4 II 4
List of A lications and Fees Nine Mile Point Nuclear Station Docket No. 50-220 A lication Date 10/6/78, as supplemented 1/31/79, 3/19/81, etc.
l.
Alternate Safe Shutdown Fees Paid None
$4,000 1.
Single safety issue; approved 3/3/83 Fees
~AIi 11 III' Il I
I I A 2.
Exemptions from Appendix R, None III.G.
None 2.
EXEMPT - Issued pursuant to 10 CFR 50.12 on 3/21/83 FEES UUE....~4,000