Docket No. 50-410 NOV 16 1983 Mr. Gerald K. Rhode Senior Vice President Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202
Dear Mr. Rhode:
Subject:
Structural Design Audit of Nine Mile Point 2
STP IBUTION:.
C7 NRC PDR L PDR NSIC PRC LB¹2 Rdg.
EHylton NFHaughey BEordenick.,
OELD ACRS (16).
- ELJordan, DEQA: IE JMTaylor, DRP:IE Region I',
RA As part of our review in preparation for the Safety Evaluation Report - OL
- stage, we will be conducting a Structural Design Audit of Nine Mile Point 2
from December 12, 1983 to December 16, 1983.
The audit is to be conducted in accordance with the guidelines of Appendix B to the SRP Section 3.8.4.
This design audit will consist of a review of design reports and drawings; discussion of special or unique design features; detail analysis results and computer codes and determination of the extent of conformance to applicable design criteria, codes and standards.
Prior to the audit, the NRC audit team plans to visit the plant on November 29, 1983 to familiarize its members with the structural aspects of the plant.
Such a plant visit has significantly helped the implementation of the audit work.
A meeting notice with a copy of the audit guideline attached is enclosed for preparation for the structural design audit.
This information was provided to Norm Rademacher of your staff during the structural meeting on September 28, 1983 in Bethesda.
The above schedules have also been discussed with Mr. Rademacher.
If you have any questions concerning the enclosed information, please call the Licensing Project Manager, Mary Haughey, at (301) 492-7897.
Sincerely.,
safaaaoom esfffa PDR ADOCK 050004f 0 I
E PDRI'i'iginatsigned b A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing
Enclosures:
As stated cc w/enclosures:
See next page oO'OPBB2/P 0L:LBB2/Bc MHaughey:kw ASchwencer 11/gg/83 11/ig/83
~
~
~
~
h F
h F
\\
~ I P
~
~ 'ine Mile Point 2
Mr. Gerald K.'Rhode Senior Vice P resi dent Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 CC:
Mr. Troy B. Conner, Jr.,
Esq.
Conner 8 Wetterhahn Suite 1050 1747 Pennsylvania
- Avenue, N.W.
Washington, D. C.
20006 Mr. Richard Goldsmith Syracuse University'ollege of Law..
E. I. White Hall Campus
- Syracuse, New York 13210 Mr. Jay Dunkleberger, Director Technological Development Programs New York State Energy Office Agency Building 2 Empire State Plaza
- Albany, New York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0. Box 126
- Lycoming, New York 13093 Mr. John W. Keib, Esq.
Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Jay M. Gutierrez, Esq.
U. S. Nuclear Regulatory Coranission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
4
MEETING NOTICE DISTRIBUTION'ate:
tt'UV '
198~
NRC PDR L PDR NSIC PRC LB82 Reading E. Hylton Project Manager M- ".
H. Denton/E.
Case D. Eisenhut/R.
Purple T. M. Novak*
B. Youngblo'od A. Schwencer G. Knighton E. Adensam G. Lainas F. Miraglia J.
P. Knight W. Johnston D. Muller T. Speis R. Houston L. Rubenstein F. Schroeder M. Ernst D. Ziemann NRR Division Directors*
OELD Attorney B. Borde E. L. Jordan, DEQA:IE J.
M. Taylor, DRP:IE Phillips Building Rece ACRS (16)
Region I
Residen~t nspector F. Ingram, PA Haughey nick ptionist**
~Document ControI (50-410 )>
NRC PARTICIPANTS:
M. Haughey L. Yang D. Jeng R.
Gramm (site visit only) cc:
Service List
- Only if participant in meeting
- Onlyif meeting held in Bethesda
~'1