ML17053D601
| ML17053D601 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/28/1983 |
| From: | Vassallo D Office of Nuclear Reactor Regulation |
| To: | Rhode G NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 8304040342 | |
| Download: ML17053D601 (6) | |
Text
MAR'2 8 1S83 Docket No. No. 50-220 ter.
G.
K. Rhode Senior Vice President Niagara Hohawk Power Corporation 300 Erie Boulevard ltest
- Syracuse, New York 13202
Dear fir. Rhode:
SUBJECT:
STAFF APPROVAL OF ISSUES REQUIRED PRIOR TO RESTART Re:
Nine Mile Point Nuclear Station, Unit No.
1 In response to a request from members of your staff at a meeting with us on December 10, 1982, we find that submittals are required from you to support the following reviews:
(1)
An audit of your stress reanalysis of the replaced recirculation piping to determine if the design criteria and methodology are at least as conservative as the commitment presented in the FSAR.
Your submittal should include a summary of the results of the analyses for the limiting cases for piping and piping supports, the design and acceptance criteria, and the analysis methodology.
Also, clarify how the branch connections were evaluated if they were decoupled from the recirculation system piping analyses and how interactions between the branch lines and recirculation piping were treated to obtain the loads.'2)
A review the summary of your repair activities for the repair of the No. 15 nozzle safe end.
The.information to support review of (1) and (2) are required 30 days prior to your intended restart.
o l<e also request that the results of the evaluation and examinations you conducted on the materials and components removed from service be provided.
This item is for long-term staff review and does not form par t of the basis for resuming safe operations.
- Further, we intend to complete a review of your actions to preclude stress corrosion cracking in any austenitic stainless steels with carbon content greater than 0.02 percent.
The information for this item has been received in your submittal dated March 15, 1983.
OFFICE[
SURNAMEQ DATEP Qo3040403 05000220 I
~ ~ os P
oo
~ ~ ~ ~ oooo'o
~ ~ oo ~ ~ ~ ~ ~ ~ ~ o ~ os
~ oooooo ~ ~ ~ ~ oooo ~ ooo ~ ~ ~ o ~
NRG FORM 318 t10~) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1991~960
I I ~
~
I It ~
J The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OHB clearance is not required under P.L. 96-5ll.
Sincerely, 6@fN~@
gg.yassalfe Domenic B. Vassallo, Chief Operating Reactors Branch ¹2 Division of Licensing cc:
See next page DIST:
Docket Fi 1 e JHe1 temes
'LJordan DEisenhut ORB¹2 Rdg RHermann NRC PDR LPDR Gray NSIC JNTayl or SNorris OELD ACRS-10 BDLiaw RJBosnak DL:
B¹2 DL:ORB¹
""b -':S th--- -----RHerman SURNAMEb ""3'/BB"" """""QP@Pg DATEb
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ oo ~
DL:0 B¹PP f
T NE allo-----BOL aw---R13 osna 33".-.-.-.-3/
/83.."3/..83 NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USG PO: 1981~960
f u'
ff Cl II Ii l'
a p) 1
~
I
~ I4 "<
Mr.
G.
K.
Rhode Niagara mohawk Power Corporation CC:
Troy B. Conner, Jr.. Esq.
Conner 8 Wetterhahn Suite 1050 1747 Pennsylvania Ave.,
NW Washington, D.C.
20006
- Director, Technological Development Programs State of New York Energy Office Swan Street Building CORE 1 - Second Floor Empire State Plaza
- Albany, New York 12223 Mr. Robert P. Jones, Supervisor Town of Scriba R.
D.
F.4
- Oswego, New York 13126 Niagara Mohawk Powe'r Corporation ATTN:
Mr. Thomas Perkins Plant Superintendent Nine Mile Point Nuclear Station P.O.
Box 32
- Lycoming, New York 13093 John W. Keib, Esquire Niagara Mohhwk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Ronald C.
Haynes Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 U.S.
Environmental Protection Agency Region II Office Regional Radiation Representative 26 Federal Plaza New York, New York 10007 Resident Inspector c/o U.S.
NRC P.
0.
Box 126
- Lycoming, New York 13093
'I