Forwards List of Info to Be Reviewed at NRC Caseload Forecast Panel 830222-24 Site Visit Re Status of Const
ML17053D511
Person / Time
Site: Nine Mile Point 
Issue date: 02/04/1983
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Rhode G
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8302170016
Download: ML17053D511 (10)


Text

I Docket No.:

50-410 FEB 4

1983 DISTRIBUT-ION:

Docket File NRC PDR Local PDR NSIC PRC Mr. Gerald K.

fbode Vice President, System Project Management Niagara Mohawk Power Corporation 300 Erii. Boulevard Itlest

Syracuse, New York 13202

Dear Mv. Rhode:

Subject:

NRC Caseload Forecast Panel Visit LB¹2 File MHaughey EHylton Region I Bordenick, OELD

ELJordan, DEQA:IE JMTaylor, DRP:IE CRS (16)
Lovelace, DMI/RM to Nine Mile Point, Unit 2 On February 22-24, 1983, the NRC Caseload Forecast Panel (CFP) will visit Nine Mile Point, Unit 2 to obtain information regarding the status of construction << t"e Pl.ant and facilities.

A list of information requested for this visit is enclosed.

0tL rt ~Q Oqro-zo OO HO IIAo

,Oo OO

',hA

~ Cil i

OCL' CIL<<C

Enclosure:

As stated A'; Schwencer, Chief Licensing Branch No.

2 Division of Licensing cc:

See ne t page The plan for the site visit provides for the first day being used for discussions of recent construction

progress, the present status of the construction program and schedules fov construction completion.

On the second day, there will be a tour of the project to allow the staff to observe construction activities.

The third day is presently unscheduled time and is i,ntended to provide flexibilityif the discussions and tour, during the first two days, indicate that more time is required to pursue specific items of interest.

The staff reserves the option of sharing any prel im~inary observations with your representatives, but it is emphasized that this 'is at the descretion of the staff and will depend on how much time may be required to develop a staff estimate once the discussions and tour have been completed.

Questions regarding this visit should be directed to the IIRC Nine Mile Point Unit 2 Project Manager, Ms. Navy F. Haughey (301) 492-8362.

Sincerely, OFFICE I SURNAME/

DATEf DL:L8¹2/PM

.HHnwght;g.;yt

.?/.ZL8.3........

DMI.'

~

~

oCo 0 0 'ke ~ o ~

2/

/83 DL.

/BC

.A$.<h..anv.ex..

2/Q /83

~

~ \\

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0

~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~

~

NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USOPO: 1981~960

S.

i

C~cLOAD FORECAST PANEL SITE YIS MEETING AGENDA 2.~

, 3-Overview of proj ect construction schedul e including progress and major milestones completedcurrent probl'ems and any anticipatedproblem areas that roy impact the current projected fuel load date.

.Detailed review and current-status'of design and engineering effort (by major. discipline) including" any potential problems that may arise from necessary rework.

Detailed review and current. status of procurem nt activities including -valves, pipe, instruments,

cable, major components, etc.

6.

7; Actual and proposed craft work force (by. major craft), craft availability. productivity, potential labor negotiations and

~ probl ems..

De ailed review and current status of all large and small bore pipe hangers, restraints, snubbers, etc., including design, remrk, procurement, fabrication, delivery and installation.

Detailed review of project schedule identifying critical path items,'near critical items, anount of fIoat for various activities, the current critical path to fuel loading,

~

methods of implementation of Corrective action for any

'activities with neoative float, and provisions for continoencies.

The estimated project percent complete as of.>>nua<y.'1, 1983.'etailed review and current status of bulk quantit)es including

, current estimated quantities, quantities installed to date,

~ quantities scheduled to date, current perceht complete for each; actual versus forecast installation rates, in cubic yards/tta.,

~linear feet/ao., or number/nn.,'and basis for figures.

':(a)

Concrete.(CY)

~

(b)

Process Pipe

{LF)

Large Bore Pipe (2 1/2" and larger)

Small Bore Pipe {2" and smaller'c)

'ard Pipe (LF)

(d)

Large Bore Pipe Hang rs, Restraints, Snubbers

(-ea)

~ PI 4

0 P

l

(e)

~

~

Small Bore Pipe Hangers, Restraints 0

{ea)

~

~

~

I

~

~

{f) Cable Tray (LF)

(g)

Total Conduit (LF}

(h)

Total Exposed Petal". Conduit (LF'):.

{i) Cable

{LF) 0

~

~

~

Power.

Contr'ol Security

. Instrumentation Plant-.Lighting (j} -.Terminations -(ea}.'

~

(

~

~

~

~

~

o 8

~

a

-. Power Control Security Instrumentation Plant Liohting (k)

Electrical Circuits (ea)

Power'ontrol Security

/

~

(1)

Instrumentation (ea}

Detailed review and current status 'of preparation of preop and acceptance test procedures, integration of preop and

" acceptance test act>vities with construction schedule, system turnover schedule, preop and acceptance tests schedule, cunent and proposed preop and acceptance tests program manpower.'a)

Total number of procedures required for fuel load.

{b) tlumber of draft procedures not started.

{c)

Number of draft procedures being written.

{d)

Number of procedures approved.

'. {e)

Number of procedures in review.

{f) Total number of preop and acceptance tests required for fuel load.

(g)

Number of preop 'and acceptance tests completed.

(h}

Number of preop. and acceptance tests currently

. in progress.

(i)

Vumber of systems.turned over to start-up..

~

~

~

~

~

~

~

~

~

0 h

\\

~

~

~

~

I 4

A I

~

~

0 9.

Detailed discussion of potential schedular. influence due to changes attributed to NUREG-0737 and other recent licensing requirements.

10.. Discussion of schedular impact, if any, regarding potential deficiencies reported in accordance with 10 CFR 50.55(e).

11.

Overview of current construction'and"startup management organization showing interfaces between t'e two.

12.

Site tour and observation'f construction activities.

4d

Nine Mile Point 2 fir. Gerald K. Rhode Vice Presi dent, System Pro ject Management Niagara Nohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202 CC Mr. Troy B. Conner, Jr.,

Esq.

Conner 8 Wetterhahn Suite 1050 1747 Pennsylvania

Avenue, N.W.

Washington, D. C.

20006 ter. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus

Syracuse, Hew York 13210 T. K. DeBoer, Director Technological Development Programs New York State Energy Office Agency Building 2 Empire State Plaza
Albany, Hew York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector Nine Mile Point Nuclear Power Station P. 0.

Box 126

Lycoming, New York 13093 Hr. John W. Keib, Esq.

Niagara mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202

'0