1 o

Docket No. 50-220 Mr.

G.

K.

Rhode Senior Vice President Niagara Mohawk Power Corporation 300, Erie Boulevard West

Syracuse, New York 13202

Dear Mr. Rhode:

Jpn g 1883

Subject:

Clarification of Specified Completion Date for Mark I Modifications Contained in NRC Order Dated January 19, 1982 Re:

Nine Mile Point Nuclear Station, Unit No.

1 On January 19, 1982 the NRC Issued an Order extending the completion date for the Mark I Long-Term Program at the Nine Mile Point Unit No.

1 facility to read:

"Prior to the start of Cycle 8 at the completion of'your Spring 1983 refueling outage."

The major modifications, which are those associated with the torus, vent system, internal structures and safety relief valve piping, comprise about 75Ã of the total program effort and have already been completed.

The remaining items are primarily associated with the torus attached piping modifications.

Since the date of issuance of the Order, leakage and cracking was identified in the, primary system piping which resulted in a maintenance outage to replace the affected piping.

From discussions with members of your staff and your letter of January 5, 1983, we understand that since the plant has not been operating, Cycle 7 will be completed in 1984 if plant operation is

resumed, as scheduled, in June 1983.

In response to your letter of January 5,

1983 we are providing you with our position regarding the interpretation of the completion date specified in the above referenced Order for completion of the Long-Term Mark I Program modifications.

The intent of the Order was to coordinate the implementation of the remaining modifications'ith a plant refueling outage (the reference to the Spring 1983 refueling outage was meant to be expository and is not considered binding) provided this was within the time frame considered acceptable by the Commission for completion of Mark I Program for a11 operating BWRs.

Therefore, as stated in the Order, OFFICE/

SURNAME/

DATE$

ssoixsos2i Biai07 j

i.. ~ ~.

PDR ADOCK 05000220 POR O FF !CIA L

~ ~ ~ ~ ~ ~ ~ ~ o ~ oto ~ o ~t ~ ~t ~t ~ ~

~ o ~ ~t ~ o ~ ~ ~ o ~t ~ o ~ o ~t ~\\ ~ o ~

o ~ ~ ~ ~ ~ ~ ~ o ~ o ~ o ~ ~ to ~tt ~ oo

~ o ~ o ~ ~ ~otto ~ \\o ~ o ~ o ~ o ~ o ~t RECORD COPY NRG FORM 318 (10-80) NRCM 0240

~

~

~ o

~

~

~ o ~

~ ~

o to to oooo ~ to to oooootooo

~ ~ too ~ toot ~ ~ ~ o ~ ~ ~t ~t ~ ~ ~ ~

~ ~

VSQPO: 1981~t980

I

~

e I

h II 4,

  • ~

J ~"

C 4 CI

r

~

o you v>ill be required to complete all Long-Term tlark I Program modifications prior to the start of Cycle 8.

Should the continuation of Cycle 7 be significantly delayed, thereby causing the completion of the Nark I modifies cations to be extended into 1985, you are requested to inform us upon making this determination.

Sincerely, QIigit!1Sit'nad b5I 9 9 Uas i'o Domenic B. Vassallo, Chief Operating Reactors

¹2 Division of Licensing CC:

See next page Docket File NRC PDR Local PDR ORB¹2 Rdg D. Eisenhut S. Norris ",

B. Hermann OELD E. L. Jordan NSIC J.

M. Taylor ACRS 10 Gray File OFFICE/

SURNAME/

DATE$

DL:ORB¹2 S. orris o ~ ~ ~ ~

o ~ o ~ ~ o ~ ~ o ~ o ~ ~ o ~ ~ ~ ~

12/gd/82 DL:ORB¹2cg

~ ~ ~ ooo

~ ~ ~ ~ eeooooo ~ /o'o ~

B. Hermann

~\\ ~ o ~ ~ o ~ e ~ ~ ~ ~ ~ s ~ o ~ s ~op 12/pf /82

~ s ~ o ~ oooAOeo ~ e ~ o ~ esse ~ e DL:ORB¹2 D.Vassallo 12/Q /82 D:

.R G. II.Pinas 12/+82 g

J

~

B i

'1 fi.

NRC FORM 318 (10.80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~5 960

~ ~

0

~

Mr.

G.

K. 'Rhode Niagara'ohawk Power Corporation CC:

Troy B. former, Jr,. Esq.

Conner 8 Wetterhahn Suite 1050 1747 Pennsylvania Ave.,

NW Washington, D.C.

20006

Director, Technological Development Programs State of New York Energy Office Swan Street Building CORE 1 - Second Floor Empire State Plaza
Albany, New York 12223 Mr. Robert P. Jones, Supervisor Town of Scriba R.

D.

P4 Oswego; New York 13126 Niagara Mohawk Power Corporation ATTN:

Mr. Thomas Perkins Plant Superintendent Nine Mile Point Nuclear Station

'.O.

Box 32

Lycoming, New York 13093 John W. Keib, Esquire Niagara Mohhwk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Ronald C.

Haynes Regional Administrator, Region I U.S. Nuclear Regulatory Coranission 631 Park Avenue King of Prussia, PA 19406 U.S.

Environmental Protection Agency Region II Office Regional Radiation Representative 26 Federal Plaza New York, New York 10007 Resident Inspector c/o U.S.

NRC P.

0.

Box 126

'ycoming, New York 13093

T