1 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 JUL 3g lv82 Mr. Ralph Higgins 1414 East Grover Street
- Omaha, Nebraska 68144
Dear Mr. Higgins:
By letter, dated July 5, 1982, you expressed.= concerns about certain design defects -at the Nine 'Mile Point Nuclear Station (Unit 1).
You indicated that the placement of public address'ystems in the control room was defective for two reasons:
(1) plant operators would have difficulty reaching such'ystems, and.(2): the'instrument-,cords could easily drag across a number of switches and cause inadvertant operation.
In August 1981,.the NRC issued NUREG-0700, "Guidelines for Control Room Design Review."
Section 6.2.1.2; paragraph b, addresses handsets..
Specifically,.items (3) and (5') specify that:
(1) cords should be a non-kink or self-retracting type, and (2) cords-should be positioned so as to avoid 'entangling critical controls or 'endangering passing traffic.
The NRC is presently implementing a program involving'a design review.at all plants in accordance with the guidelines of NUREG-0700.
In-response to your letter a preliminary.-review of the Nine, Mile Point control board layout was..conducted by the resident inspector.
The subject handset is located in the vertical portion of the upper panel.
'The hand-set is considered to,be accessible to plant operators.
However, the cord was not retractable and. could potent'ially entangle critical controls.
With=respect to entanglement, it was.determined that there has been no inadvertant actuation of. safety systems over. the 12 years of Nine Mile Point operation.
Based on this, it is our intention to continue to implement a program of design review of the Nine Mile Point control room design in a timely,manner.
Please note, that the Nine Mile Point plant wil.l be shutdown for primary coolant system repairs unti,l the spring of 1983.
In the near future the utilitywill be requested to,propose a schedule for performing a Detailed Control Room Human factors Review.
Your efforts with respect.to bringing this to our attention are. appreciated.
Sincerely, H gh L. Thompson, Acting Director Division of Human Factors Safety 82080500 05000220
-- 5g 82072~
pDR QQQC pDR H
aK e
I
Ralph Higgins DISTRIBUTION:
HFEB Files-HDenton ECase PPAS DEisenhut SHanauer RMattson RVollmer PCheck BSnyder HThompson, DHFS Reading File (DHFS82-090, NRR 82-290)
R. Purple SCavanaugh (NRR 82-290)
D. Nottingham J. Heltemes D. Vassallo DTondi VMoore PPolk G. Lainas NRC PDA LPDR ORB 82 Yellow Ticket File (NRR 82-290)
OFFICE&
SURNAME/
DATE $
~ 'RIORI ~
WA 415 fgll 11.)A)1 Wl ~ Il
~ ~
0 ~ IO ~ 0 ~ ~ ~I ~I~ OO ~
~ ~
~
~ 0 ~ ~ ~ 0 ~ ~ ~ ~I~ ~ ~ ~ ~ ~
0 ~ ~ \\ ~
nFFtCIAL RECORD COPY F 0' 0'
0 ~ 0 ~
~
~
~
~ ~
F 0'
~ ~ 0
~ 0
~ 0 ~ ~I~t ~ ~\\~ 0
~ 0 0
~ ~ ~ ~
~
tJNPO: 1931 33~~'
0 0
1 JUL 29 1982 Pg -uo Nr. Ralph Iliggins 1414 East Grover Street
- Omaha, Nebraska G8144
Dear Hr. Higgins:
By llutter, dated July 5, 1982, you expressed concerns about certain design defects at the Nine Nile Point Nuclear Station (Unit 1).
You indicated that the placement of'ublic address systems in the control room was defective for two reasons:
(1) plant operators would have difficulty reaching such systems, and (2) the instrument cords could easily drag across a number of switches and'ause inadvertant operation.
In August.1981, the NRC issued NlJREG-O?00, "Guidelines for Control Room Design Revie>."
Section 6.2.1.2, paragraph b, addresses handsets.
Specifically, items (3) and (5) specify that:
(1) cords should be a non-kink or self-retracting type, an'd (2) cords should be positioned so as to avoid entangling critical controls or endangering passing traffic.
The NRC is presently implementing a program involving a design review at all p'lants in accordance with the guidelines of NUREG-0?00.
In response to your letter a preliminary review of the Nine tHle Point control board layout was conducted by the resident inspector.
The subject handset is located in the vertical portion of the upper panel.
The hand-set is considered to,be accessible to plant operators.
However, the cord was not retractable and could potentially entangle critical controls.
>lith.respect to entanglement, it was determined that there has been no inadvertant actuation of safety systems over the 12 years of Nine Nile Point operation.
Based on this, it is our intention to continue to implement a program of design review of the Nine Nile Point control room design in a timely manner.
Please note that the Nine Nile Point plant will be shutdown for primary coolant system repairs until the spring of 1983, In the near future the utilitywill be requested to propose a schedule for performing a Detailed Control Room Human Factors Review.
Your efforts <>1th respect to bringing this to our attention are appreciated.
Sincerely, pg (f'4 f set gz ok'os Q~~
s concurrences ugh
. Thompson, Actin Director I
Divisi of Human Factors Safety OFFICE)
SURNAME/
OATE $
DL;Og)MI.'P,...
PPolk
~ ~ ~ ~ ~ ~ ~ ~ I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
7/28/82
~ 0 ~ ~ ~ ~ 0 ~ ~ 0 ~ ~I~ ~ ~ ~ ~ ~ ~ ~I~
~ ~ ~
~ ~ ~ ~
I ~
~ \\
~ ~
~
UFc'0 DTondi:mec
~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~I ~
7/28/72
~ ~ ~ 0 ~ 0 ~ 0 ~\\ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ 0 ~
VAMoore
~
~ ~ ~ ~
~ IO ~ ~I~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~
7/ g.5
/82 I ~\\ ~ ~ ~ ~ ~
~ 00Ji ~ ~ ~ ~ ~ ~ ~ ~ ~ I FS HLThompson 7/
/82
~ ~ ~ ~ I ~ ~ ~
~ ~ s I
~ ~ ~
~ ~ ~
~
~
~
~
~
~
NRC FORM 318 u040) NRCM 0240 OFF ICIAL R ECOR D COPY VSGPO1 1881~~960
F
~
DISTRIBUTION:
Ilr; Ralph Higgins 14'l4.East. Grover Str eet
- Omaha, Nebraska 68144
Dear Hr. Higgins:
~ a By letter, dated July 6, 1982, you @<pressed concerns about certain design defects at the Nine Nile. Point Nuclear Station (Unit 1).
You indicated that the placement of public address systems in the conteol room was defective for two reasons:
(1) plant operators would have difficulty reaching such systems, and (2) the instrument cords could easily drag across a number of switches and cause inadvertant operation.
~
~
In August.1981, the NRC issued NUREG-0700, "Guidelines for Control Room Design Reviec."
Section 6.2.1.2, paragraph b, addresses handsets.
Specifically, items (3) and (5) specify that.'(1) cords should be a non-kink or se'lf-retracting type, an'd (2) cords should be positioned so as to avoid entangling critical controls or,endangeeing passing traffic
. The IIRC is present'ly implementing a program involving =a design review at all plants in accordance with the guidelines of NUREG-0700.
In response to your letter a preliminary review of the Nine Hile Point control board layout was conducted by the resident inspector.-
The subject handset is located in the vertical portion of the upper panel.
The hand-set is considered to be accessible to,plant operators.
However, the cord was not retractable and could potentially entangle.critical controls.
(lith.respect.to entanglement, it was detenoined that there has been no inadvertant actuation of safety systems over the 12 years of Nine f<ile Point operation.
Based on this, it is our intention to continue to implement a program of design review of the Nine Nile Point control room design in a timely manner.
Please note that the Nine thile Point plant will be shutdown for primary coolant system repairs until the spring of 1983.
The NRC plans to perform a Detailed Control Rom Human Factors Review of the plant in the future.
Your efforts with respect to bringing this to our attention are appreciated.
Sincerely, Hugh L. Thompson, Acting Director Division of Human Factors Safety OFFICE/
SURNAME/
OATE $
DL:ORB82
~ ~\\ ~ ~ 0 ~\\ ~ ~ 0 ~I~ ~ IHO
~ ~
PPolk
~ ~ ~ ~ tootoeoojoo ~ ~ ~ ooo ~ ~ O 7/ Q /82
~ ~ ~ 0 ~ 0 ~ ~ ~
~ 0 0 ~ 0 ~ 0 ~ 0 ~
HFEB
~ ~ ~ 0 ~ 0 ~ ~ ~ ~ ~ ~ ~ 0 ~ 0
~ ~
DTondi
- elec HFEB VAMoore 7/
Xf/82 7/
/82 DHFS HLThompson 7/
/82 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~~960
r y>>
4 r
T
~
4 1
P' t
~
II I
5 II J
t'
Ralph Higgins DISTRIBUTION:
HFEB Files HDenton ECase PPAS DEisenhut SHanauer RNattson RVollmer PCheck BSnyder HThompson, DHFS Reading File (DHFS82-090, NRR 82-290)
R. Purple SCavanaugh (NRR 82-290)
D. Nottingham J.
Heltemes D. Vassallo DTondi VHoore PPolk G. Lainas NRC PDA LPDR ORB g2 Yellow Ticket File (NRR 82-290)
OFFICE/
SURNAMEQ DATE P NRC FORM 318 (10~) NRCM 0240 OFFICIAL RECORD COPY USOPO: 1881~960
II
$ P
,tt I
Docket No.
50-220 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHIItlGTON O.C. 20555 July 29, 1982 DISTRIBUTION';
Oocket File ORB 62 Rdg.
See attached list of addresses subject:
Nine Mile Point Nuclear Station, Unit l Niagara Mohawk Power Corp.
The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No.,dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
0 Application and Safety Analysis Report, Vol.
Amendment No.,
to Application/SAR, dated Construction Permit No, CPPR-H Facility Operating Liccnsc No. DPR-
,date
, NPF-, date Amendment No.
to CPPR-or DRR-,dated Idtl ttt <<: -Rttauaadadttoathlgt-o e l982 Office of Nuclear Reactor Regulation
Enclosures:
QFFlca a-SVANAME a-ORB P2 Norris tdRC~BI (6-76)
OATS <<- 7/ J/82
J K V e '>
DISTRIBUTIO
'ocket File ORB ¹2 Rdg.
DOCKET NO(S) 50 220 July 20, 1982
SUBJECT:
Nfne Nile Point Nuclear Station Niagara Mohawk Potver Corp.
The following documents concerning our review of the subject facilityare transmitted for your information.'otice of Receipt of Application.
Draft/Final Environmental Statement, dated Notice of Availabilityof Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
, dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume Amendment No.
to Application/SAR dated Construction Permit No. CPPR-
, Amendment No.
, dated X
Facility Operating LicenseNo., Amendment No.
Order Extending Construction Completion Date, dated Other (Specify)
FOrtIrardS mOnth1
, dated
Enclosures:
As stated Office of Nuclear Reactor Regulation ORB ¹2 DL CC:
OFFICE)
SURNAME)
DATEP ORB ¹ No vis
~
~ ~ ~ ~ ~
~
~ ~ ~ ~
~
7(g/82
~ ~ ~
~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~
~ ~
NRC FORM 318 (10I80) NRCM 0240 OFFICIAL RECORD COPY
0
DISTRIBUTION:
Docket File ORB ¹2 Rdg.
DOCKET NO(S).
50-220 July 20, 1982
SUBJECT:
Vermont Yankee Nuc1ear Power Shat)on Vermont,Yankee Nuc1ear Power Corp.
Facility Operating License No.
, Amendment No.
Order. Extending Construction Completion Date, dated Other (Spec//y)
Forwards montS o erat$ n r e ort for Ma 1 982
, dated The following documents concerning our review of the subject facilityare transmitted for your information.'otice of Receipt of'Application.
Draft/Final Environmental Statement, dated Notice of Availabilityof Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
, dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
t Application and Safety Analysis Report, Volume Amendment No. 'o Application/SAR dated Construction Permit No. CPPR-
, Amendment No.
, dated
Enclosures:
As stated Office of Nuclear Reactor Regulation ORB ¹2 DL CC: